Provided By MZ Data Products

 



SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549



FORM 6-K

Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 of the
Securities Exchange Act of 1934

For the month of September, 2008

Commission File Number 1-15106



PETRÓLEO BRASILEIRO S.A. - PETROBRAS
(Exact name of registrant as specified in its charter)



Brazilian Petroleum Corporation - PETROBRAS
(Translation of Registrant's name into English)



Avenida República do Chile, 65
20031-912 - Rio de Janeiro, RJ
Federative Republic of Brazil
(Address of principal executive office)

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F. 

Form 20-F ___X___ Form 40-F _______

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.

Yes _______ No___X____



Contracting FPSOs for the Pre-Salt

(Rio de Janeiro, September 15 2008) – PETRÓLEO BRASILEIRO S/A - PETROBRAS, [Bovespa: PETR3/PETR4, NYSE: PBR/PBRA, Latibex: XPBR/XPBRA, BCBA: APBR/APBRA], a Brazilian international energy company, announces that the Executive Board has approved the contracting of 10 new FPSO-type (Floating Production Storage and Offloading) oil-production platforms for the Pre-Salt areas in the Santos Basin.

The two first FPSO platforms will be chartered by Petrobras from third-parties; they will have a high level of national content and will be destined for use in development pilot projects. Each unit’s daily production capacity will be 100,000 barrels of oil and 5 million cubic meters of natural gas. The units will be installed between 2013 and 2014 in areas that are yet to be defined in the Pre-Salt area.

The eight other production units will belong to Petrobras, will have daily production capacities of 120,000 barrels of oil and 5 million cubic meters of natural gas per day, and will be installed during 2015 and 2016. They will be manufactured in series, beginning with the construction of the hulls at the dry dock of the Rio Grande Shipyard, in Rio Grande do Sul, which has already been leased by Petrobras for a term of 10 years. The production modules to be installed on the hulls will be defined in the future, after the pilot projects and the long duration tests are deployed.

These 10 FPSOs will operate in ultradeep waters, ranging from 2,400 to 3,000 meters from the waterline, and will be used to kick-off the definitive production system in the Pre-Salt area of the Santos Basin.

After the 10 FPSOs are deployed, major technological innovations developed by Petrobras will be introduced for the subsequent production development phases in the Pre-Salt area.


www.petrobras.com.br/ri/english
Contacts:
PETRÓLEO BRASILEIRO S. A. – PETROBRAS
Investor Relations Department I E-mail: petroinvest@petrobras.com.br / acionistas@petrobras.com.br
Av. República do Chile, 65 – 22nd floor - 20031-912 - Rio de Janeiro, RJ I Tel.: 55 (21) 3224-1510 / 9947


This document may contain forecasts that merely reflect the expectations of the Company’s management. Such terms as “anticipate”, “believe”, “expect”, “forecast”, “intend”, “plan”, “project”, “seek”, “should”, along with similar or analogous expressions, are used to identify such forecasts. These predictions evidently involve risks and uncertainties, whether foreseen or not by the Company. Therefore, the future results of operations may differ from current expectations, and readers must not base their expectations exclusively on the information presented herein.


SIGNATURE
 
 
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Date: September 15, 2008

 
PETRÓLEO BRASILEIRO S.A--PETROBRAS
By:
/S/  Almir Guilherme Barbassa

 
Almir Guilherme Barbassa
Chief Financial Officer and Investor Relations Officer
 

 

 
FORWARD-LOOKING STATEMENTS

This press release may contain forward-looking statements. These statements are statements that are not historical facts, and are based on management's current view and estimates offuture economic circumstances, industry conditions, company performance and financial results. The words "anticipates", "believes", "estimates", "expects", "plans" and similar expressions, as they relate to the company, are intended to identify forward-looking statements. Statements regarding the declaration or payment of dividends, the implementation of principal operating and financing strategies and capital expenditure plans, the direction of future operations and the factors or trends affecting financial condition, liquidity or results of operations are examples of forward-looking statements. Such statements reflect the current views of management and are subject to a number of risks and uncertainties. There is no guarantee that the expected events, trends or results will actually occur. The statements are based on many assumptions and factors, including general economic and market conditions, industry conditions, and operating factors. Any changes in such assumptions or factors could cause actual results to differ materially from current expectations.