BHP BILLITON - PRODUCTION REPORT

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

Form 6-K

 

 

REPORT OF FOREIGN PRIVATE ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16 UNDER

THE SECURITIES EXCHANGE ACT OF 1934

January 18, 2012

 

 

 

BHP BILLITON LIMITED   BHP BILLITON PLC
(ABN 49 004 028 077)   (REG. NO. 3196209)
(Exact name of Registrant as specified in its charter)   (Exact name of Registrant as specified in its charter)
VICTORIA, AUSTRALIA   ENGLAND AND WALES
(Jurisdiction of incorporation or organisation)   (Jurisdiction of incorporation or organisation)

180 LONSDALE STREET, MELBOURNE,

VICTORIA

3000 AUSTRALIA

 

NEATHOUSE PLACE, VICTORIA, LONDON,

UNITED KINGDOM

(Address of principal executive offices)   (Address of principal executive offices)

 

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:

x  Form 20-F             ¨  Form 40-F

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):  ¨

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7):  ¨

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934:    ¨  Yes    x  No

If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): n/a

 

 

 


LOGO

 

Release Time    IMMEDIATE
Date    18 January 2012
Number    01/12

BHP BILLITON PRODUCTION REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2011

 

   

Western Australia Iron Ore production rose to a record annualised rate of 178 million tonnes per annum (100% basis) in the December 2011 quarter, a 25% increase over the previous corresponding period.

 

   

A strong recovery in production across the Base Metals portfolio delivered a 27% increase in copper volumes from the September 2011 quarter.

 

   

Half yearly production records were achieved at New South Wales Energy Coal (Australia) and Cerrejon Coal (Colombia), two of BHP Billiton’s high value, export oriented energy coal operations.

 

   

Petroleum production increased 36% from the December 2010 half year following the acquisition of the Fayetteville and Petrohawk Onshore US businesses and strong uptime performance from existing, operated assets.

Petroleum

 

     DEC
2011
HALF
     DEC
2011
QTR
     DEC H11
vs

DEC H10
    DEC Q11
vs

DEC Q10
    DEC Q11
vs

SEP Q11
 

Crude oil, condensate and natural gas liquids (‘000 boe)

     44,066         22,228         -10     -5     2

Natural gas (bcf)

     391.84         214.49         108     160     21

Total petroleum products (million boe)

     109.38         57.98         36     56     13

Total petroleum production Petroleum production increased 36 per cent from the December 2010 half year following the acquisition of the Fayetteville and Petrohawk Onshore US businesses and strong uptime performance from existing, operated assets.

Crude oil, condensate and natural gas liquids Liquids volumes increased marginally from the September 2011 quarter as production from the Onshore US portfolio, development drilling at Shenzi and high uptime at Atlantis (all USA) offset anticipated field decline.

The contribution from the Onshore US portfolio resulted in an eight per cent increase in natural gas liquids production in the December 2011 half year, although anticipated field decline and the temporary shut down of the non-operated Mad Dog facility (USA) resulted in lower overall liquids production relative to the prior corresponding period. Mad Dog is forecast by the operator to remain shut down until the June 2012 quarter.

Natural gas Natural gas production was higher than all comparable periods reflecting strong performance from the Onshore US and Angostura (Trinidad and Tobago) businesses. Gas production in eastern Australia was down against the September 2011 quarter due to lower seasonal demand.


Aluminium

 

     DEC
2011
HALF
     DEC
2011
QTR
     DEC H11
vs

DEC H10
    DEC Q11
vs

DEC Q10
    DEC Q11
vs

SEP Q11
 

Alumina (‘000 tonnes)

     2,061         1,001         2     -2     -6

Aluminium (‘000 tonnes)

     628         313         0     0     -1

Alumina Sales volumes increased when compared with all corresponding periods as the Alumar refinery (Brazil) continued to deliver into expanded capacity. While a planned calciner outage at Worsley (Australia) constrained production during the December 2011 quarter, volumes are expected to recover as the refinery processes stockpiled hydrate in future periods.

Aluminium Production was in line with comparable periods with all operations running at, or close to, maximum technical capacity.

Despite our competitive position on the cost curve, our integrated Aluminium business continues to be challenged by underlying cost pressure and weaker prices.

Base Metals

 

     DEC
2011
HALF
     DEC
2011
QTR
     DEC H11
vs

DEC H10
    DEC Q11
vs

DEC Q10
    DEC Q11
vs

SEP Q11
 

Copper (‘000 tonnes)

     500.6         280.3         -16     -7     27

Lead (tonnes)

     122,651         66,992         -9     3     20

Zinc (tonnes)

     51,742         28,298         -33     -23     21

Silver (‘000 ounces)

     20,054         10,903         -15     -6     19

Uranium oxide concentrate (Uranium) (tonnes)

     1,909         909         -3     -5     -9

Copper A strong recovery in production across the Base Metals portfolio delivered a 27% increase in copper volumes from the September 2011 quarter. Escondida (Chile) average mill throughput per day steadily increased as operations recovered from the industrial action that affected production in the prior quarter. In addition, Olympic Dam (Australia) benefited from higher grades and improved smelter availability following the planned outage in the September 2011 quarter. The expansion of mining fleets at Antamina (Peru) and Pampa Norte (Chile) contributed to half yearly material mined records for both assets.

Consistent with prior guidance, Escondida production is forecast to be marginally lower in the 2012 financial year, with volumes weighted to the second half. Production is expected to improve beyond the 2012 financial year as mining activities progress towards higher grade ore with completion of the Escondida Ore Access project in the main pit.

At 31 December 2011, the Group had 219,718 tonnes of outstanding copper sales that were revalued at a weighted average price of US$3.45 per pound. The final price of these sales will be determined over the remainder of the 2012 financial year. In addition, 239,156 tonnes of copper sales from the 2011 financial year were subject to a finalisation adjustment in the current period. The finalisation adjustment and provisional pricing impact as at 31 December 2011 will decrease earnings before interest and tax by US$258 million for the period.

Lead/silver Production at Cannington (Australia) decreased in the December 2011 half year reflecting lower average ore grades.

 

BHP Billiton Production Report for the half year ended 31 December 2011      2   


Zinc Production at Antamina decreased in the December 2011 half year as mining continued to progress through a copper rich ore zone.

Uranium Production was broadly in line with all comparable periods.

Diamonds & Specialty Products

 

     DEC
2011
HALF
     DEC
2011
QTR
     DEC H11
vs
DEC H10
    DEC Q11
vs
DEC Q10
    DEC Q11
vs

SEP Q11
 

Diamonds (‘000 carats)

     938         481         -32     -29     5

Diamonds As anticipated, production in the December 2011 half year was lower than the prior corresponding period. EKATI (Canada) production is expected to remain constrained in the medium term as the operations extract lower grade material, consistent with the mine plan.

During the quarter, BHP Billiton announced a review of its diamonds business, including the Group’s interests in the EKATI Diamond Mine. The process is ongoing and could continue through the first half of the 2012 calendar year.

Stainless Steel Materials

 

     DEC
2011
HALF
     DEC
2011
QTR
     DEC H11
vs

DEC H10
    DEC Q11
vs

DEC Q10
    DEC Q11
vs

SEP Q11
 

Nickel (‘000 tonnes)

     73.5         38.4         -10     -11     9

Nickel Production increased in the December 2011 quarter with the Line 1 furnace at Cerro Matoso (Colombia) operating at full production rates following its successful replacement in the prior quarter. In addition, higher nickel in matte production at the Nickel West Kalgoorlie smelter (Australia) compensated for a decline in metal production at the Nickel West Kwinana refinery that resulted from a planned outage at a third party hydrogen supplier. Nickel West Kwinana is expected to commission its new hydrogen plant in the March 2012 quarter.

The Nickel West Mt Keith Talc Redesign Project, which enables the processing of talc bearing ore, was successfully commissioned in December 2011.

Nickel West operating margins remain sensitive to persistent weakness in nickel prices and the continued strength of the Australian dollar.

 

BHP Billiton Production Report for the half year ended 31 December 2011      3   


Iron Ore

 

     DEC
2011
HALF
     DEC
2011
QTR
     DEC H11
vs

DEC H10
    DEC Q11
vs

DEC Q10
    DEC Q11
vs

SEP Q11
 

Iron ore (‘000 tonnes)

     80,644         41,072         23     22     4

Iron ore Western Australia Iron Ore (WAIO) delivered another quarterly record as production rose to an annualised rate of 178 million tonnes per annum (100% basis). Consistently strong operating performance, the ramp up of Ore Handling Plant 3 at Yandi, dual tracking of the company’s rail infrastructure and additional ship loading capacity at Port Hedland all contributed to the record performance. While scheduled maintenance, tie-in activities and the wet season in the Pilbara are expected to affect WAIO production in the second half of the 2012 financial year, full year production is now forecast to marginally exceed prior guidance of 159 million tonnes per annum (100% basis).

Production at Samarco (Brazil) was in line with comparable periods with all three pellet plants continuing to run at full capacity.

Manganese

 

     DEC
2011
HALF
     DEC
2011
QTR
     DEC H11
vs

DEC H10
    DEC Q11
vs

DEC Q10
    DEC Q11
vs

SEP Q11
 

Manganese ore (‘000 tonnes)

     3,825         1,806         -3     -1     -11

Manganese alloy (‘000 tonnes)

     389         195         -1     2     1

Manganese ore Production was lower than the September 2011 quarter as planned maintenance at Hotazel (South Africa) and a weather related reduction in plant availability at GEMCO (Australia) constrained performance.

Manganese alloy Alloy production was in line with comparable periods.

Metallurgical Coal

 

     DEC
2011
HALF
     DEC
2011
QTR
     DEC H11
vs

DEC H10
    DEC Q11
vs

DEC Q10
    DEC Q11
vs

SEP Q11
 

Metallurgical coal (‘000 tonnes)

     17,784         8,493         -2     9     -9

Metallurgical coal Queensland Coal (Australia) volumes for the December 2011 quarter remained below capacity as a result of stoppages associated with the ongoing labour negotiations and the remnant effects of wet weather. In addition, geotechnical issues at the Gregory Crinum longwall adversely affected production in the period. While system capability is no longer constrained by the 2011 floods, the extent to which industrial action will continue to impact production, sales and unit costs is difficult to predict.

Illawarra Coal (Australia) production increased in the December 2011 half year following successful longwall moves at Dendrobium and Appin in the June 2011 quarter. Volumes were lower than the September 2011 quarter as a planned shutdown of the West Cliff Coal Handling Preparation Plant was undertaken in readiness for commissioning of a plant upgrade. A longwall move and plant shutdown at Dendrobium is scheduled for the March 2012 quarter.

 

BHP Billiton Production Report for the half year ended 31 December 2011      4   


Energy Coal

 

     DEC
2011
HALF
     DEC
2011
QTR
     DEC H11
vs

DEC H10
    DEC Q11
vs

DEC Q10
    DEC Q11
vs

SEP Q11
 

Energy coal (‘000 tonnes)

     35,379         16,919         5     2     -8

Energy coal Half yearly production records were achieved at New South Wales Energy Coal and Cerrejon Coal, two of BHP Billiton’s high value, export oriented energy coal operations. However, unfavourable mining conditions and an industrial dispute at South Africa Coal, together with the suspension of operations at San Juan Coal (USA), resulted in lower production relative to the September 2011 quarter.

Throughout this report, unless otherwise stated, production volumes refer to BHP Billiton’s share and exclude suspended and sold operations.

Further information on BHP Billiton can be found at: www.bhpbilliton.com

 

Media Relations   Investor Relations
Australia   Australia
Samantha Stevens   James Agar
Tel: +61 3 9609 2898 Mobile: +61 400 693 915   Tel: +61 3 9609 2222 Mobile: +61 467 807 064
email: Samantha.Stevens@bhpbilliton.com   email: James.Agar@bhpbilliton.com
Kelly Quirke   Andrew Gunn
Tel: +61 3 9609 2896 Mobile: +61 429 966 312   Tel: +61 3 9609 3575 Mobile: +61 439 558 454
email: Kelly.Quirke@bhpbilliton.com   email: Andrew.Gunn@bhpbilliton.com
Fiona Martin   United Kingdom and South Africa

Tel: +61 3 9609 2211 Mobile: +61 427 777 908

email: Fiona.Martin2@bhpbilliton.com

 

 

Brendan Harris

  Tel: +44 20 7802 4131 Mobile: +44 7990 527 726

 

United Kingdom and Americas

  email: Brendan.Harris@bhpbilliton.com
Ruban Yogarajah   Tara Dines
Tel: US +1 713 966 2907 or UK +44 20 7802 4033   Tel : +44 20 7802 7113 Mobile : +44 7825 342 232
Mobile: UK +44 7827 082 022   Email : Tara.Dines@bhpbilliton.com
email: Ruban.Yogarajah@bhpbilliton.com  
  Americas
  Scott Espenshade
  Tel: +1 713 599 6431 Mobile: +1 713 208 8565
  email: Scott.Espenshade@bhpbilliton.com
BHP Billiton Limited ABN 49 004 028 077   BHP Billiton Plc Registration number 3196209
Registered in Australia   Registered in England and Wales
Registered Office: 180 Lonsdale Street   Registered Office: Neathouse Place
Melbourne Victoria 3000 Australia   London SW1V 1BH United Kingdom
Tel +61 1300 55 4757 Fax +61 3 9609 3015   Tel +44 20 7802 4000 Fax +44 20 7802 4111

Members of the BHP Billiton Group which is headquartered in Australia

 

BHP Billiton Production Report for the half year ended 31 December 2011      5   


BHP BILLITON PRODUCTION SUMMARY - CONTINUING OPERATIONS

 

          QUARTER ENDED      YEAR TO DATE      % CHANGE  
          DEC
2010
     SEP
2011
     DEC
2011
     DEC
2011
     DEC
2010
     DEC YTD11
vs
DEC YTD10
    DEC Q11
vs
DEC Q10
    DEC Q11
vs
SEP Q11
 

PETROLEUM

                        

Crude oil & condensate

   (‘000 bbl)      20,652         18,482         18,866         37,348         42,739         -13     -9     2

Natural gas

   (bcf)      82.54         177.35         214.49         391.84         188.37         108     160     21

Natural gas liquids

   (‘000 boe)      2,842         3,356         3,362         6,718         6,205         8     18     0

Total petroleum products

   (million boe)      37.25         51.40         57.98         109.38         80.34         36     56     13

ALUMINIUM

                        

Alumina

   (‘000 tonnes)      1,025         1,060         1,001         2,061         2,025         2     -2     -6

Aluminium

   (‘000 tonnes)      314         315         313         628         628         0     0     -1

BASE METALS

                        

Copper

   (‘000 tonnes)      302.3         220.3         280.3         500.6         593.5         -16     -7     27

Lead

   (tonnes)      64,925         55,659         66,992         122,651         134,066         -9     3     20

Zinc

   (tonnes)      36,945         23,444         28,298         51,742         77,142         -33     -23     21

Gold

   (ounces)      51,626         39,439         44,007         83,446         100,987         -17     -15     12

Silver

   (‘000 ounces)      11,571         9,151         10,903         20,054         23,723         -15     -6     19

Uranium oxide concentrate

   (tonnes)      957         1,000         909         1,909         1,967         -3     -5     -9

Molybdenum

   (tonnes)      485         595         766         1,361         693         96     58     29

DIAMONDS AND SPECIALTY PRODUCTS

                     

Diamonds

   (‘000 carats)      676         457         481         938         1,379         -32     -29     5

STAINLESS STEEL MATERIALS

                     

Nickel

   (‘000 tonnes)      43.0         35.1         38.4         73.5         81.5         -10     -11     9

IRON ORE

                        

Iron ore

   (‘000 tonnes)      33,666         39,572         41,072         80,644         65,649         23     22     4

MANGANESE

                        

Manganese ore

   (‘000 tonnes)      1,829         2,019         1,806         3,825         3,951         -3     -1     -11

Manganese alloy

   (‘000 tonnes)      192         194         195         389         391         -1     2     1

METALLURGICAL COAL

                     

Metallurgical coal

   (‘000 tonnes)      7,787         9,291         8,493         17,784         18,086         -2     9     -9

ENERGY COAL

                        

Energy coal

   (‘000 tonnes)      16,513         18,460         16,919         35,379         33,619         5     2     -8

Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 1   


BHP BILLITON ATTRIBUTABLE PRODUCTION

 

           QUARTER ENDED      YEAR TO DATE  
     BHP Billiton
Interest
    DEC
2010
     MAR
2011
     JUN
2011
     SEP
2011
     DEC
2011
     DEC
2011
     DEC
2010
 

PETROLEUM

                      

Production

                      

Crude oil & condensate (‘000 bbl)

       20,652         19,200         18,652         18,482         18,866         37,348         42,739   

Natural gas (bcf)

       82.54         84.90         131.79         177.35         214.49         391.84         188.37   

NGL (‘000 boe) (a)

       2,842         2,442         2,636         3,356         3,362         6,718         6,205   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total petroleum products (million boe)

       37.25         35.79         43.25         51.40         57.98         109.38         80.34   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

ALUMINIUM

                      

ALUMINA

                      

Production (‘000 tonnes)

                      

Worsley

     86     758         663         725         752         694         1,446         1,514   

Alumar

     36     267         296         301         308         307         615         511   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       1,025         959         1,026         1,060         1,001         2,061         2,025   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

ALUMINIUM

                      

Production (‘000 tonnes)

                      

Hillside

     100     179         173         179         180         180         360         359   

Bayside

     100     25         24         24         25         24         49         49   

Alumar

     40     43         44         43         44         42         86         87   

Mozal

     47     67         64         67         66         67         133         133   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       314         305         313         315         313         628         628   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

BASE METALS (b)

                      

COPPER

                      

Payable metal in concentrate (‘000 tonnes)

                      

Escondida

     57.5     112.7         87.7         79.4         49.9         80.4         130.3         223.4   

Antamina

     33.8     27.2         24.9         22.5         30.3         30.9         61.2         50.4   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       139.9         112.6         101.9         80.2         111.3         191.5         273.8   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Cathode (‘000 tonnes)

                      

Escondida

     57.5     47.1         44.4         42.6         32.9         43.0         75.9         92.1   

Pampa Norte (c)

     100     66.0         64.1         75.7         65.4         70.0         135.4         132.4   

Pinto Valley

     100     1.5         1.4         1.4         1.4         1.4         2.8         2.9   

Olympic Dam

     100     47.8         51.1         50.7         40.4         54.6         95.0         92.3   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       162.4         161.0         170.4         140.1         169.0         309.1         319.7   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

LEAD

                      

Payable metal in concentrate (tonnes)

                      

Cannington

     100     64,748         51,673         58,414         55,557         66,787         122,344         133,277   

Antamina

     33.8     177         237         164         102         205         307         789   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       64,925         51,910         58,578         55,659         66,992         122,651         134,066   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

ZINC

                      

Payable metal in concentrate (tonnes)

                      

Cannington

     100     14,920         16,129         14,348         14,488         14,745         29,233         30,180   

Antamina

     33.8     22,025         24,123         20,385         8,956         13,553         22,509         46,962   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       36,945         40,252         34,733         23,444         28,298         51,742         77,142   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Refer footnotes on page 4.

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 2   


BHP BILLITON ATTRIBUTABLE PRODUCTION

 

           QUARTER ENDED      YEAR TO DATE  
     BHP Billiton
Interest
    DEC
2010
     MAR
2011
     JUN
2011
     SEP
2011
     DEC
2011
     DEC
2011
     DEC
2010
 

BASE METALS (continued)

                      

GOLD

                      

Payable metal in concentrate (ounces)

                      

Escondida

     57.5     23,133         19,667         17,116         11,063         14,242         25,305         47,940   

Olympic Dam (refined gold)

     100     28,493         29,892         28,429         28,376         29,765         58,141         53,047   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       51,626         49,559         45,545         39,439         44,007         83,446         100,987   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

SILVER

                      

Payable metal in concentrate (‘000 ounces)

                      

Escondida

     57.5     796         670         580         403         549         952         1,599   

Antamina

     33.8     1,025         813         773         972         1,087         2,059         2,014   

Cannington

     100     9,509         7,315         8,242         7,559         9,056         16,615         19,668   

Olympic Dam (refined silver)

     100     241         258         282         217         211         428         442   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       11,571         9,056         9,877         9,151         10,903         20,054         23,723   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

URANIUM OXIDE CONCENTRATE

                      

Payable metal in concentrate (tonnes)

                      

Olympic Dam

     100     957         1,063         1,015         1,000         909         1,909         1,967   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       957         1,063         1,015         1,000         909         1,909         1,967   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 
MOLYBDENUM                       
Payable metal in concentrate (tonnes)                       

Antamina

     33.8     485         334         418         595         766         1,361         693   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       485         334         418         595         766         1,361         693   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

DIAMONDS AND SPECIALTY PRODUCTS

                      

DIAMONDS

                      

Production (‘000 carats)

                      

EKATI™

     80     676         551         576         457         481         938         1,379   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

STAINLESS STEEL MATERIALS

                      

NICKEL

                      

Production (‘000 tonnes)

                      

CMSA

     99.9     12.4         7.8         7.4         10.4         12.3         22.7         24.8   

Nickel West

     100     30.6         25.2         30.8         24.7         26.1         50.8         56.7   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       43.0         33.0         38.2         35.1         38.4         73.5         81.5   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Refer footnotes on page 4.

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 3   


BHP BILLITON ATTRIBUTABLE PRODUCTION

 

           QUARTER ENDED      YEAR TO DATE  
     BHP Billiton
Interest
    DEC
2010
     MAR
2011
     JUN
2011
     SEP
2011
     DEC
2011
     DEC
2011
     DEC
2010
 

IRON ORE

                      

Production (‘000 tonnes) (d)

                      

Newman (e)

     85     11,213         11,912         12,480         13,158         13,247         26,405         20,853   

Goldsworthy Joint Venture

     85     225         305         284         254         334         588         609   

Area C Joint Venture

     85     10,154         9,510         10,044         10,479         10,437         20,916         20,240   

Yandi Joint Venture

     85     9,078         8,799         9,796         12,708         14,170         26,878         17,865   

Samarco

     50     2,996         2,705         2,922         2,973         2,884         5,857         6,082   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       33,666         33,231         35,526         39,572         41,072         80,644         65,649   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 
MANGANESE                       
MANGANESE ORES                       
Saleable production (‘000 tonnes)                       

South Africa (f)

     60     779         514         776         911         808         1,719         1,717   

Australia (f)

     60     1,050         838         1,014         1,108         998         2,106         2,234   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       1,829         1,352         1,790         2,019         1,806         3,825         3,951   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

MANGANESE ALLOYS

                      

Saleable production (‘000 tonnes)

                      

South Africa (f) (g)

     60     123         111         120         124         124         248         255   

Australia (f)

     60     69         61         70         70         71         141         136   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       192         172         190         194         195         389         391   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

METALLURGICAL COAL

                      

Production (‘000 tonnes) (h)

                      

BMA

     50     4,534         3,955         4,874         5,274         5,006         10,280         11,072   

BHP Mitsui Coal (i)

     80     1,421         1,133         1,426         1,803         1,580         3,383         3,334   

Illawarra

     100     1,832         1,582         1,622         2,214         1,907         4,121         3,680   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       7,787         6,670         7,922         9,291         8,493         17,784         18,086   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

ENERGY COAL

                      

Production (‘000 tonnes)

                      

South Africa

     100     8,507         8,596         8,228         9,095         7,976         17,071         17,504   

USA

     100     2,296         2,360         3,779         2,467         2,163         4,630         5,473   

Australia

     100     3,394         3,978         3,793         4,046         4,027         8,073         5,900   

Colombia

     33     2,316         2,609         2,538         2,852         2,753         5,605         4,742   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       16,513         17,543         18,338         18,460         16,919         35,379         33,619   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

(a) LPG and ethane are reported as Natural Gas Liquid (NGL). Product-specific conversions are made and NGL is reported in barrels of oil equivalent (boe).
(b) Metal production is reported on the basis of payable metal.
(c) Includes Cerro Colorado and Spence.
(d) Iron ore production is reported on a wet tonnes basis.
(e) Newman includes Mt Newman Joint Venture and Jimblebar.
(f) Shown on 100% basis. BHP Billiton interest in saleable production is 60%.
(g) Production includes Medium Carbon Ferro Manganese.
(h) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
(i) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 4   


PRODUCTION AND SHIPMENT REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     DEC      MAR      JUN      SEP      DEC      DEC      DEC  
     2010      2011      2011      2011      2011      2011      2010  

PETROLEUM

                    

BHP Billiton attributable production unless otherwise stated.

                    

CRUDE OIL & CONDENSATE (‘000 barrels)

                    

Bass Strait

     2,553         2,465         2,485         2,527         2,190         4,717         5,264   

North West Shelf

     2,188         1,719         1,442         1,400         1,686         3,086         4,425   

Stybarrow

     358         862         1,037         1,171         836         2,007         909   

Pyrenees

     5,362         4,326         4,584         3,901         3,207         7,108         10,878   

Other Australia (a)

     10         13         13         13         13         26         25   

Atlantis (b)

     2,881         2,694         2,098         2,081         2,390         4,471         5,919   

Mad Dog (b)

     874         952         128         —           —           —           1,949   

Shenzi (b) (c)

     3,859         3,378         3,630         3,848         4,119         7,967         7,775   

Onshore US (d)

     —           —           —           672         1,631         2,303         —     

Trinidad/Tobago

     —           299         687         466         466         932         285   

Other Americas (b) (e)

     430         397         448         373         374         747         789   

UK

     479         542         534         447         433         880         1,090   

Algeria

     1,587         1,474         1,498         1,498         1,437         2,935         3,273   

Pakistan

     71         79         68         85         84         169         158   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     20,652         19,200         18,652         18,482         18,866         37,348         42,739   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

NATURAL GAS (billion cubic feet)

                    

Bass Strait

     20.94         22.31         29.97         31.88         23.65         55.53         59.75   

North West Shelf

     36.47         35.11         35.44         32.97         32.56         65.53         72.96   

Other Australia (a)

     3.83         4.69         4.68         4.45         4.56         9.01         9.83   

Atlantis (b)

     1.07         0.84         0.67         0.64         0.67         1.31         2.40   

Mad Dog (b)

     0.06         0.13         0.01         —           —           —           0.31   

Shenzi (b) (c)

     0.77         0.64         0.67         0.62         0.57         1.19         1.52   

Onshore US (d)

     —           —           36.43         77.59         121.63         199.22         —     

Trinidad/Tobago

     —           —           4.69         9.31         9.72         19.03         —     

Other Americas (b) (e)

     1.32         1.33         1.42         1.19         0.98         2.17         2.72   

UK

     6.14         6.32         5.69         3.91         5.51         9.42         12.45   

Pakistan

     11.94         13.53         12.12         14.79         14.64         29.43         26.43   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     82.54         84.90         131.79         177.35         214.49         391.84         188.37   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

NGL (‘000 barrels of oil equivalent)

                    

Bass Strait

     1,412         1,252         1,554         1,823         1,407         3,230         3,442   

North West Shelf

     442         434         367         423         434         857         913   

Atlantis (b)

     177         150         117         120         123         243         365   

Mad Dog (b)

     42         39         11         —           —           —           84   

Shenzi (b) (c)

     336         245         252         296         293         589         532   

Onshore US (d)

     —           —           —           416         943         1,359         —     

Other Americas (b) (e)

     54         42         47         41         34         75         96   

UK

     74         79         66         18         45         63         134   

Algeria

     305         201         222         219         83         302         639   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     2,842         2,442         2,636         3,356         3,362         6,718         6,205   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

TOTAL PETROLEUM PRODUCTS

     37.25         35.79         43.25         51.40         57.98         109.38         80.34   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

(million barrels of oil equivalent) (f)

 

(a) Other Australia includes Minerva.
(b) Gulf of Mexico volumes are net of royalties.
(c) The Genghis Khan operation is reported in Shenzi.
(d) Fayetteville shale acquisition completed on 31 March 2011. Petrohawk Energy Corporation acquisition completed on 20 August 2011. Onshore US volumes are net of mineral holder royalties.
(e) Other Americas includes Neptune, West Cameron 76, Genesis and Starlifter.
(f) Total barrels of oil equivalent (boe) conversions are based on 6,000 scf of natural gas equals 1 boe.

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 5   


PRODUCTION AND SHIPMENT REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     DEC      MAR      JUN      SEP      DEC      DEC      DEC  
     2010      2011      2011      2011      2011      2011      2010  

ALUMINIUM

                    

BHP Billiton attributable production and sales unless otherwise stated.

(‘000 tonnes)

                    

ALUMINA

                    

Production

                    

Worsley, Australia

     758         663         725         752         694         1,446         1,514   

Alumar, Brazil

     267         296         301         308         307         615         511   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     1,025         959         1,026         1,060         1,001         2,061         2,025   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                    

Worsley, Australia

     735         633         727         720         745         1,465         1,502   

Alumar, Brazil

     271         249         324         280         349         629         510   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     1,006         882         1,051         1,000         1,093         2,093         2,012   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

ALUMINIUM

                    

Production

                    

Hillside, South Africa

     179         173         179         180         180         360         359   

Bayside, South Africa

     25         24         24         25         24         49         49   

Alumar, Brazil

     43         44         43         44         42         86         87   

Mozal, Mozambique

     67         64         67         66         67         133         133   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     314         305         313         315         313         628         628   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                    

Hillside, South Africa

     160         163         181         163         186         349         308   

Bayside, South Africa

     31         38         29         24         25         49         60   

Alumar, Brazil

     43         43         44         44         43         87         87   

Mozal, Mozambique

     76         66         80         60         85         145         131   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     310         310         334         291         339         630         586   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 6   


PRODUCTION AND SHIPMENT REPORT

 

         QUARTER ENDED     YEAR TO DATE  
         DEC
2010
    MAR
2011
    JUN
2011
    SEP
2011
    DEC
2011
    DEC
2011
    DEC
2010
 

BASE METALS

                

BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.

  

Escondida, Chile

                

Material mined (100%)

   (‘000 tonnes)     98,167        100,966        97,705        69,006        96,152        165,158        202,008   

Sulphide ore milled (100%)

   (‘000 tonnes)     18,789        15,993        16,399        12,029        18,663        30,692        38,486   

Average copper grade

   (%)     1.26     1.15     1.06     0.97     0.97     0.97     1.25

Production ex mill (100%)

   (‘000 tonnes)     194.6        153.1        141.2        91.9        144.3        236.2        392.3   

Production

                

Payable copper

   (‘000 tonnes)     112.7        87.7        79.4        49.9        80.4        130.3        223.4   

Payable gold concentrate

   (fine ounces)     23,133        19,667        17,116        11,063        14,242        25,305        47,940   

Copper cathode (EW)

   (‘000 tonnes)     47.1        44.4        42.6        32.9        43.0        75.9        92.1   

Payable silver concentrate

   (‘000 ounces)     796        670        580        403        549        952        1,599   

Sales

                

Payable copper

   (‘000 tonnes)     113.9        74.3        90.9        49.2        82.1        131.3        228.7   

Payable gold concentrate

   (fine ounces)     23,357        16,754        20,251        10,974        14,435        25,409        49,018   

Copper cathode (EW)

   (‘000 tonnes)     46.1        47.7        48.0        25.7        45.3        71.0        86.1   

Payable silver concentrate

   (‘000 ounces)     804        569        673        404        558        962        1,635   

Pampa Norte, Chile

                

Cerro Colorado

                

Material mined

   (‘000 tonnes)     18,290        16,320        17,840        14,736        16,792        31,528        33,934   

Ore milled

   (‘000 tonnes)     4,631        4,251        4,771        4,608        4,601        9,209        9,215   

Average copper grade

   (%)     0.76     0.75     0.74     0.72     0.71     0.72     0.75

Production

                

Copper cathode (EW)

   (‘000 tonnes)     22.4        22.6        25.7        22.5        23.5        46.0        44.1   

Sales

                

Copper cathode (EW)

   (‘000 tonnes)     24.7        22.5        25.7        22.4        23.8        46.2        46.1   

Spence

                

Material mined

   (‘000 tonnes)     18,389        19,046        19,487        19,816        26,511        46,327        35,537   

Ore milled

   (‘000 tonnes)     4,567        4,892        4,545        3,862        4,909        8,771        8,994   

Average copper grade

   (%)     1.28     1.23     1.22     1.30     1.46     1.39     1.27

Production

                

Copper cathode (EW)

   (‘000 tonnes)     43.6        41.5        50.0        42.9        46.5        89.4        88.3   

Sales

                

Copper cathode (EW)

   (‘000 tonnes)     48.2        45.7        54.5        43.2        46.6        89.8        85.2   

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 7   


PRODUCTION AND SHIPMENT REPORT

 

         QUARTER ENDED     YEAR TO DATE  
         DEC
2010
    MAR
2011
    JUN
2011
    SEP
2011
    DEC
2011
    DEC
2011
    DEC
2010
 

BASE METALS

                

BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.

  

Antamina, Peru

                

Material mined (100%)

   (‘000 tonnes)     32,722        33,154        41,669        44,212        38,759        82,971        63,321   

Sulphide ore milled (100%)

   (‘000 tonnes)     9,347        9,288        9,253        9,396        9,656        19,052        18,388   

Average head grades

                

- Copper

   (%)     1.06     0.99     0.90     1.11     1.15     1.13     1.00

- Zinc

   (%)     1.11     1.15     1.03     0.68     0.72     0.70     1.23

Production

                

Payable copper

   (‘000 tonnes)     27.2        24.9        22.5        30.3        30.9        61.2        50.4   

Payable zinc

   (tonnes)     22,025        24,123        20,385        8,956        13,553        22,509        46,962   

Payable silver

   (‘000 ounces)     1,025        813        773        972        1,087        2,059        2,014   

Payable lead

   (tonnes)     177        237        164        102        205        307        789   

Payable molybdenum

   (tonnes)     485        334        418        595        766        1,361        693   

Sales

                

Payable copper

   (‘000 tonnes)     21.8        26.1        23.5        28.2        31.7        59.9        49.5   

Payable zinc

   (tonnes)     24,912        25,571        18,479        9,586        12,654        22,240        48,849   

Payable silver

   (‘000 ounces)     882        839        658        833        940        1,773        2,124   

Payable lead

   (tonnes)     503        180        92        91        139        230        1,251   

Payable molybdenum

   (tonnes)     292        394        346        549        591        1,140        730   

Cannington, Australia

                

Material mined

   (‘000 tonnes)     824        703        841        819        778        1,597        1,566   

Ore milled

   (‘000 tonnes)     760        713        786        826        888        1,714        1,591   

Average head grades

                

- Silver

   (g/t)     459        377        381        332        370        352        453   

- Lead

   (%)     9.9     8.6     8.6     7.9     8.8     8.4     9.7

- Zinc

   (%)     3.3     3.6     2.9     2.9     2.9     2.9     3.1

Production

                

Payable silver

   (‘000 ounces)     9,509        7,315        8,242        7,559        9,056        16,615        19,668   

Payable lead

   (tonnes)     64,748        51,673        58,414        55,557        66,787        122,344        133,277   

Payable zinc

   (tonnes)     14,920        16,129        14,348        14,488        14,745        29,233        30,180   

Sales

                

Payable silver

   (‘000 ounces)     9,973        7,263        8,235        6,434        8,960        15,394        19,192   

Payable lead

   (tonnes)     67,815        52,199        58,868        48,258        66,657        114,915        130,906   

Payable zinc

   (tonnes)     16,621        12,986        14,530        15,734        14,078        29,812        29,098   

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 8   


PRODUCTION AND SHIPMENT REPORT

 

          QUARTER ENDED     YEAR TO DATE  
          DEC
2010
    MAR
2011
    JUN
2011
    SEP
2011
    DEC
2011
    DEC
2011
    DEC
2010
 
BASE METALS                  
BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.   

Olympic Dam, Australia

                 

Material mined (a)

   (‘000 tonnes)      2,513        2,433        2,675        2,543        2,440        4,983        5,223   

Ore milled

   (‘000 tonnes)      2,622        2,670        2,533        2,471        2,440        4,911        5,127   

Average copper grade

   (%)      1.78     1.84     1.92     1.98     2.08     2.03     1.84

Average uranium grade

   kg/t      0.50        0.54        0.54        0.54        0.50        0.52        0.52   

Production

                 

Copper cathode (ER)

   (‘000 tonnes)      45.0        47.8        47.0        37.6        51.5        89.1        86.6   

Copper cathode (EW)

   (‘000 tonnes)      2.8        3.3        3.7        2.8        3.1        5.9        5.7   

Uranium oxide concentrate

   (tonnes)      957        1,063        1,015        1,000        909        1,909        1,967   

Refined gold

   (fine ounces)      28,493        29,892        28,429        28,376        29,765        58,141        53,047   

Refined silver

   (‘000 ounces)      241        258        282        217        211        428        442   

Sales

                 

Copper cathode (ER)

   (‘000 tonnes)      45.3        48.7        46.5        36.4        51.7        88.1        87.5   

Copper cathode (EW)

   (‘000 tonnes)      2.9        2.7        4.1        3.5        2.5        6.0        5.7   

Uranium oxide concentrate

   (tonnes)      1,121        930        1,143        910        1,126        2,036        1,872   

Refined gold

   (fine ounces)      29,757        31,742        30,323        28,979        24,327        53,306        48,671   

Refined silver

   (‘000 ounces)      150        334        269        289        155        444        351   

 

(a)    Material mined refers to run of mine ore mined and hoisted.

 

       

Pinto Valley, USA                  

Production

                 

Copper cathode (EW)

   (‘000 tonnes)      1.5        1.4        1.4        1.4        1.4        2.8        2.9   

Sales

                 

Copper cathode (EW)

   (‘000 tonnes)      1.0        1.9        1.2        1.7        1.2        2.9        2.8   

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 9   


PRODUCTION AND SHIPMENT REPORT

 

          QUARTER ENDED      YEAR TO DATE  
          DEC
2010
     MAR
2011
     JUN
2011
     SEP
2011
     DEC
2011
     DEC
2011
     DEC
2010
 
DIAMONDS AND SPECIALTY PRODUCTS                     

BHP Billiton attributable production and sales unless otherwise stated.

  

                 
DIAMONDS                        
EKATI™, Canada                        

Ore Processed (100%)

   (‘000 tonnes)      1,162         1,122         1,212         1,177         1,090         2,267         2,358   

Production

   (‘000 carats)      676         551         576         457         481         938         1,379   

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 10   


PRODUCTION AND SHIPMENT REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     DEC
2010
     MAR
2011
     JUN
2011
     SEP
2011
     DEC
2011
     DEC
2011
     DEC
2010
 

STAINLESS STEEL MATERIALS

                    

BHP Billiton attributable production and sales unless otherwise stated.

(‘000 tonnes)

  

  

NICKEL

                    

CMSA, Colombia

                    

Production

     12.4         7.8         7.4         10.4         12.3         22.7         24.8   

Sales

     12.8         8.5         8.5         7.7         13.1         20.8         24.8   

Nickel West, Australia

                    

Production

                    

Nickel contained in concentrate

     1.7         1.6         3.3         2.6         1.8         4.4         2.6   

Nickel contained in finished matte

     21.8         12.4         16.1         9.0         15.2         24.2         35.4   

Nickel metal

     7.1         11.2         11.4         13.1         9.1         22.2         18.7   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Nickel production

     30.6         25.2         30.8         24.7         26.1         50.8         56.7   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                    

Nickel contained in concentrate

     0.8         2.2         3.9         1.2         2.6         3.8         2.4   

Nickel contained in finished matte

     19.9         14.7         14.9         10.1         13.9         24.0         34.5   

Nickel metal

     9.6         9.2         12.4         9.4         10.9         20.3         21.8   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Nickel sales

     30.3         26.1         31.2         20.7         27.4         48.1         58.7   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 11   


PRODUCTION AND SHIPMENT REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     DEC
2010
     MAR
2011
     JUN
2011
     SEP
2011
     DEC
2011
     DEC
2011
     DEC
2010
 

IRON ORE

                    

BHP Billiton attributable production and sales unless otherwise stated.

(‘000 tonnes)

  

  

IRON ORE (a)

                    

Pilbara, Australia

                    

Production

                    

Newman (b)

     11,213         11,912         12,480         13,158         13,247         26,405         20,853   

Goldsworthy Joint Venture

     225         305         284         254         334         588         609   

Area C Joint Venture

     10,154         9,510         10,044         10,479         10,437         20,916         20,240   

Yandi Joint Venture

     9,078         8,799         9,796         12,708         14,170         26,878         17,865   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total (BHP Billiton share)

     30,670         30,526         32,604         36,599         38,188         74,787         59,567   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total production (100%)

     36,082         35,913         38,358         43,058         44,927         87,985         70,078   

Shipments

                    

Lump

     7,830         7,669         7,463         7,744         8,700         16,444         15,652   

Fines

     23,870         22,648         25,379         29,311         28,406         57,717         44,919   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total (BHP Billiton share)

     31,700         30,317         32,842         37,055         37,106         74,161         60,571   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total sales (100%)

     37,294         35,667         38,638         43,594         43,654         87,248         71,260   

 

(a) Iron ore production and shipments are reported on a wet tonnes basis.
(b) Newman includes Mt Newman Joint Venture and Jimblebar.

 

Samarco, Brazil

                    

Production

     2,996         2,705         2,922         2,973         2,884         5,857         6,082   

Shipments

     3,460         2,598         2,736         2,926         2,961         5,887         6,094   

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 12   


PRODUCTION AND SHIPMENT REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     DEC
2010
     MAR
2011
     JUN
2011
     SEP
2011
     DEC
2011
     DEC
2011
     DEC
2010
 

MANGANESE

                    

BHP Billiton attributable production and sales unless otherwise stated.

(‘000 tonnes)

                    

MANGANESE ORE

                    

South Africa (a)

                    

Saleable production

     779         514         776         911         808         1,719         1,717   

Sales

     947         701         746         861         853         1,714         1,604   

Australia (a)

                    

Saleable production

     1,050         838         1,014         1,108         998         2,106         2,234   

Sales

     1,173         1,127         1,108         1,094         876         1,970         1,725   

MANGANESE ALLOY

                    

South Africa (a) (b)

                    

Saleable production

     123         111         120         124         124         248         255   

Sales

     153         145         123         95         138         233         248   

Australia (a)

                    

Saleable production

     69         61         70         70         71         141         136   

Sales

     68         62         75         91         58         149         121   

 

(a) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.
(b) Production includes Medium Carbon Ferro Manganese.

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 13   


PRODUCTION AND SHIPMENT REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     DEC      MAR      JUN      SEP      DEC      DEC      DEC  
     2010      2011      2011      2011      2011      2011      2010  

METALLURGICAL COAL

                    

BHP Billiton attributable production and sales unless otherwise stated.

(‘000 tonnes)

  

  

METALLURGICAL COAL (a)

                    

Queensland, Australia

                    

Production

                    

BMA

                    

Blackwater

     1,134         870         1,127         1,367         1,122         2,489         2,592   

Goonyella

     1,086         993         1,417         1,463         1,375         2,838         2,949   

Peak Downs

     984         758         543         971         992         1,963         2,101   

Saraji

     819         532         556         802         900         1,702         1,691   

Norwich Park

     73         128         386         365         369         734         541   

Gregory Joint Venture

     438         674         845         306         248         554         1,198   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

BMA total

     4,534         3,955         4,874         5,274         5,006         10,280         11,072   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

BHP Mitsui Coal (b)

                    

South Walker Creek

     765         623         690         1,106         901         2,007         1,821   

Poitrel

     656         510         736         697         679         1,376         1,513   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

BHP Mitsui Coal total

     1,421         1,133         1,426         1,803         1,580         3,383         3,334   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Queensland total

     5,955         5,088         6,300         7,077         6,586         13,663         14,406   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Shipments

                    

Coking coal

     5,243         3,475         4,865         5,066         4,845         9,911         11,884   

Weak coking coal

     1,886         970         1,411         1,691         1,747         3,438         3,539   

Thermal coal

     206         125         285         176         20         196         574   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     7,335         4,570         6,561         6,933         6,612         13,545         15,997   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

(a) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
(b) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.

 

Illawarra, Australia

                    

Production

     1,832         1,582         1,622         2,214         1,907         4,121         3,680   

Shipments

                    

Coking coal

     1,495         1,374         1,407         1,673         1,255         2,928         2,883   

Thermal coal

     536         211         216         159         441         600         898   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     2,031         1,585         1,623         1,832         1,696         3,528         3,781   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 14   


PRODUCTION AND SHIPMENT REPORT                     

 

     QUARTER ENDED      YEAR TO DATE  
     DEC      MAR      JUN      SEP      DEC      DEC      DEC  
     2010      2011      2011      2011      2011      2011      2010  

ENERGY COAL

                    

BHP Billiton attributable production and sales unless otherwise stated.

(‘000 tonnes)

  

  

South Africa

                    

Production

     8,507         8,596         8,228         9,095         7,976         17,071         17,504   

Sales

                    

Export

     3,365         2,887         3,082         3,439         3,546         6,985         6,412   

Local utility

     5,024         5,254         5,363         5,622         4,582         10,204         10,691   

Inland

     96         78         37         85         165         250         206   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     8,485         8,219         8,482         9,146         8,293         17,439         17,309   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

New Mexico, USA

                    

Production

                    

Navajo Coal

     1,818         1,629         2,271         1,178         2,060         3,238         3,572   

San Juan Coal

     478         731         1,508         1,289         103         1,392         1,901   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     2,296         2,360         3,779         2,467         2,163         4,630         5,473   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales - local utility

     3,339         3,385         3,106         3,630         3,108         6,738         6,700   

NSW Energy Coal, Australia

                    

Production

     3,394         3,978         3,793         4,046         4,027         8,073         5,900   

Sales

                    

Export

     3,253         3,824         3,522         3,523         3,566         7,089         5,879   

Inland

     180         339         364         625         333         958         584   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     3,433         4,163         3,886         4,148         3,899         8,047         6,463   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Cerrejon Coal, Colombia

                    

Production

     2,316         2,609         2,538         2,852         2,753         5,605         4,742   

Sales - export

     2,672         2,149         2,853         2,901         2,784         5,685         5,448   

 

BHP Billiton Production Report for the half year ended 31 December 2011      Page 15   


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

      BHP Billiton Limited and BHP Billiton Plc
Date: January 18, 2012     By:  

/s/ Jane McAloon

    Name:   Jane McAloon
    Title:   Group Company Secretary