Form 10-K
Table of Contents

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

FORM 10-K

 

 

(Mark One)

 

x ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2011

 

¨ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from             to            

Commission File Number 000-52646

 

 

GEOVIC MINING CORP.

(Exact name of registrant as specified in its charter)

 

 

 

Delaware   20-5919886

(State or other jurisdiction of

incorporation or organization)

 

(I.R.S. Employer

Identification No.)

1200 17th Street, Suite 980

Denver, Colorado

  80202
(Address of principal executive offices)   (Zip Code)

Registrant’s telephone number, including area code: (303) 476-6455

 

 

Securities registered pursuant to Section 12(b) of the Exchange Act:

None

Securities registered pursuant to Section 12(g) of the Exchange Act:

Common Stock, par value $0.0001 per share

Title of each class to be so registered

Indicate by check mark whether the Registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.    Yes  ¨    No  x

Indicate by check mark if the Registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.    Yes  ¨    No  x

Indicate by check mark whether the Registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.    Yes  x    No  ¨

Indicate by check mark whether the Registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the Registrant was required to submit and post such files).    Yes  x    No  ¨

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of Registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.  x

Indicate by check mark whether the Registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company.

Large Accelerated Filer  ¨    Accelerated Filer  ¨    Non-accelerated Filer  ¨    Smaller Reporting Company  x

Indicate by check mark whether the Registrant is a shell company (as defined in Rule 12b-2 of the Act).    Yes  ¨    No  x

The aggregate market value of the Registrant’s common stock held by non-affiliates, computed by reference to the closing price of the common stock as of June 30, 2011, the last business day of the Registrant’s most recently completed second fiscal quarter, was approximately $29,322,296.

At March 22, 2012, there were 106,639,602 shares of the Registrant’s common stock outstanding.

DOCUMENTS INCORPORATED BY REFERENCE

Part III is incorporated by reference from the Registrant’s definitive Proxy Statement for its 2012 Annual Meeting of Stockholders to be filed pursuant to Regulation 14A, no later than 120 days after the end of the Registrant’s fiscal year.

 

 

 


Table of Contents

GEOVIC MINING CORP.

2011 ANNUAL REPORT ON FORM 10-K

Table of Contents

 

PART I

     5   

ITEM 1.

   BUSINESS      5   

ITEM 1A.

   RISK FACTORS      11   

ITEM 1B.

   UNRESOLVED STAFF COMMENTS      21   

ITEM 2.

   PROPERTIES      22   

ITEM 3.

   LEGAL PROCEEDINGS      36   

ITEM 4.

   MINE SAFETY DISCLOSURES      37   

PART II

     38   

ITEM 5.

   MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES      38   

ITEM 6.

   SELECTED FINANCIAL DATA      40   

ITEM 7.

   MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS      41   

ITEM 7A.

   QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK      45   

ITEM 8.

   FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA      46   

ITEM 9.

   CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE      46   

ITEM 9A.

   CONTROLS AND PROCEDURES      46   

ITEM 9B.

   OTHER INFORMATION      47   

PART III

     48   

ITEM 10.

   DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE      48   

ITEM 11.

   EXECUTIVE COMPENSATION      48   

ITEM 12.

   SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELEATED STOCKHOLDER MATTERS      48   

ITEM 13.

   CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS AND DIRECTOR INDEPENDENCE      48   

ITEM 14.

   PRINCIPAL ACCOUNTING FEES AND SERVICES      48   

PART IV

     49   

ITEM 15.

  

EXHIBITS AND FINANCIAL STATEMENT SCHEDULES

     49   

SIGNATURES

     52   

In this Annual Report on Form 10-K, all dollar amounts are in thousands of United States Dollars unless otherwise indicated.

 

2


Table of Contents

CAUTIONARY LANGUAGE ABOUT FORWARD-LOOKING STATEMENTS

Certain statements in this report constitute “forwarding-looking statements” within the meaning of Section 27A of the Securities Act of 1933, Section 21E of the Securities and Exchange Act of 1934 and applicable Canadian securities laws. Certain, but not necessarily all, of such forward-looking statements can be identified by the use of forward-looking terminology such as “believes,” “expects,” “may,” “will,” “should,” or “anticipates” or the negative thereof or other variations thereon or comparable terminology, or by discussions of strategy that involve risks and uncertainties. All statements other than statements of historical fact, included in this report regarding our financial position, business and plans or objectives for future operations are forward-looking statements. Without limiting the broader description of forward-looking statements above, we specifically note that statements regarding exploration and mine development, construction and expansion plans, costs, grade, production and recovery rates, permitting, financing needs, the availability of financing on acceptable terms or other sources of funding, if needed, and the timing of additional tests, feasibility studies and environmental permitting are all forward-looking in nature.

Statements contained in this annual report that are not historical facts are forward-looking statements that involve risks and uncertainties. Forward-looking statements include, but are not limited to, statements with respect to the estimation of mineral reserves and mineralized material; our expectations regarding the amount of capital required prior to production at the Nkamouna Project and our ability to source the required capital; success of exploration activities; permitting time lines; construction and capital costs; operating expenses; currency fluctuations; requirements for additional capital; our expectations regarding processing and marketing of future production from the Nkamouna Project; our ability to enter into off-take arrangements; government regulation of mining operations; environmental risks; unanticipated reclamation expenses; title disputes or claims; limitations on insurance coverage; commencement of mine production, anticipated expenditures in 2012; and our plans with respect to our expectations regarding securing a potential strategic investor for, or a sale of our interest in, the Nkamouna Project and future debt and equity financing for the Project. Forward-looking statements involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such risks and other factors include, among others, the risk factors discussed below in Item 1A—“Risk Factors,” and other factors described herein and in other filings with the U.S. Securities and Exchange Commission (the “SEC”) and Canadian securities regulatory authorities. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this annual report speak only as of the date hereof. The Company does not undertake any obligation to release publicly any revisions to these forward-looking statements to reflect new information, events or circumstances except as may be required under applicable securities laws.

CAUTIONARY NOTE REGARDING DISCLOSURE OF MINERAL PROPERTIES

Geovic Mining Corp. is subject to the reporting requirements of the Securities Exchange Act of 1934, as amended (“Exchange Act”), and applicable Canadian securities laws, and as a result we report our mineral reserves according to two different standards. Canadian reporting requirements for disclosure of mineral properties are governed by National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). The definitions of NI 43-101 are adopted from those given by the Canadian Institute of Mining, Metallurgy and Petroleum. U.S. reporting requirements are governed by the SEC Industry Guide 7 (“Guide 7”). These reporting standards have similar goals in terms of conveying an appropriate level of confidence in the disclosures being reported, but embody different approaches and definitions. Under Guide 7, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made.

 

3


Table of Contents

We disclose mineral reserves and mineral resources according to the definitions set forth in NI 43-101 and modify them as appropriate to conform to Guide 7 for reporting in the United States. In this Form 10-K, we use the term “mineralized material” to describe the amount of mineralization in mineral deposits that do not constitute “reserves” by United States standards. This is substantially equivalent to the total measured mineral resources and indicated mineral resources (disclosed as exclusive of reserves), which we disclose for reporting purposes in Canada. U.S. investors are cautioned that, while the terms “measured mineral resources,” “indicated mineral resources” and “inferred mineral resources” are recognized and required by Canadian securities laws, rules adopted by the SEC do not recognize them. U.S. investors are also cautioned not to assume that all or any part of measured or indicated resources will ever be converted into Guide 7 compliant reserves.

 

4


Table of Contents

PART I

 

ITEM 1. BUSINESS

The entity now known as Geovic Mining Corp. was incorporated under the Business Corporations Act (Alberta, Canada) on August 27, 1984, was continued into Ontario in 2001, and was domesticated as a Delaware corporation under the name “Geovic Mining Corp.” on November 21, 2006. In this Form 10-K, the “Company,” “Geovic Mining,” “we,” “our” and “us” refer to Geovic Mining Corp. and one or more of its subsidiaries as indicated by the context.

We completed a reverse take-over transaction (the “RTO”) on December 1, 2006, with the result that we hold 100% of the issued and outstanding shares of Geovic, Ltd., a Cayman Islands corporation (“Geovic”). Geovic owns 60.5% of Geovic Cameroon PLC (“GeoCam”), a private corporation existing under the laws of the Republic of Cameroon which holds our mining prospect in Cameroon.

Intercorporate Relationships

Geovic is our principal operating subsidiary, and employs all our employees. The following chart illustrates the inter-corporate relationships among the Company and its subsidiaries as of March 22, 2012.

 

LOGO

 

(1) GeoCam minority interest owners are described below under “GeoCam Shareholder and other Agreements.”

Our principal business is conducted through Geovic by which we hold our interest in rights to several cobalt-nickel-manganese deposits in the Republic of Cameroon in Africa through the ownership interest in GeoCam. Our principal business focus since 1994 has been to advance our interest in the deposits. GeoCam’s Mining Permit (the “Mining Permit”) establishes exclusive mining rights to develop the Nkamouna, Mada and other cobalt-nickel-manganese deposits within a 1,250 square kilometer area in southeastern Cameroon (the “Cameroon Properties”). The Cameroon Properties are described in Item 2. Properties. GeoCam plans to develop and mine the Nkamouna and Mada deposits (together, the “Nkamouna Project” or the “Project”) before the other deposits are developed.

 

5


Table of Contents

Business Operations

Qualified independent consulting firms identified and retained by either Geovic or GeoCam completed engineering pre-feasibility studies and technical reports on the Nkamouna deposit in 2006, a feasibility study in November 2007, a NI 43-101 compliant technical report in January 2008, a feasibility optimization study in September 2008 (“2008 OS”), an updated NI 43-101 compliant technical report on the Nkamouna Project in November 2009 (the “2009 Nkamouna Technical Report”), a final feasibility study (the “Feasibility Study”) in April 2011 and a NI 43-101 Technical Report describing the results of the Feasibility Study in June 2011.

Beginning in late 2008 and continuing through early 2011, several process improvement programs were initiated to enhance the Nkamouna Project’s economics and reduce technical and financial risks. These included adopting conventional leaching technology and demonstrating the processes through readily available batch and continuous pilot scale laboratory testing programs, which were completed in 2011 by independent third parties. These testing programs have validated the process improvements and planned production presented in the Feasibility Study.

In mid-2009 GeoCam retained three well-known, highly qualified and experienced metallurgical and chemical engineers to serve as its Technical Advisory Panel (“TAP”). The TAP was engaged to provide high-level metallurgical processing input to the Geovic technical design team as well as provide independent expert feedback to GeoCam and its shareholders. Based on recommendations of the TAP and the results of preliminary marketing performed, GeoCam intends to produce two intermediate products (a mixed cobalt and nickel sulfide product, referred to as MSP, and manganese carbonate) at the mine site. These intermediate products would be shipped offshore and sold in the international marketplace for processing into finished products. These decisions were made in an effort to limit initial process plant capital costs and process risk at the remote mine site, and to address product preferences expressed by potential off-take customers.

In December 2009 GeoCam engaged Lycopodium Pty Ltd. (“Lycopodium”), an independent international engineering firm based in Perth, Australia to prepare the Feasibility Study for the Nkamouna Project. The Feasibility Study was completed in April 2011. The Feasibility Study includes estimated construction and capital costs, operating expenses and future net cash flow from mining operations for the Nkamouna Project. With the Feasibility Study now complete, we are continuing to work with GeoCam to obtain Project financing and product sales contracts, including negotiating with potential strategic investors in the Nkamouna Project.

During 2011, GeoCam undertook the following activities to advance the Nkamouna Project:

 

   

Completed a Technical Report for the Nkamouna and Mada Deposits to meet the requirements of NI 43-101;

 

   

Progressed, tested and optimized the metallurgical processing to be utilized at the Nkamouna Project;

 

   

Completed specialty evaluations on elemental deportation in the metallurgical process, critical habitats and sensitive fauna species, and glauber salt and hydrosizer processes;

 

   

Assisted Lycopodium and other consultants to complete the Feasibility Study;

 

   

Completed an update to the Project Environmental and Social Assessment (“ESA”), which is aligned with the Feasibility Study;

 

   

Continued to work with the Public Liaison Committee and Nkamouna area stakeholders to guide and focus community development initiatives;

 

   

Continued to support socio-humanitarian programs in the local communities in the health, education, agriculture and animal husbandry disciplines;

 

   

Assisted with the due diligence of potential strategic partners who have indicated an interest in a potential equity investment and/or have indicated an interest in purchasing the commodities produced;

 

6


Table of Contents
   

Assisted with the due diligence efforts of the independent engineering and environmental and social consultants of potential project financing lenders, and with the selection and advancement of legal counsel activities supporting project financing; and

 

   

Arranged for numerous product samples to be shipped to potential offtake partners to determine compatibility with their metallurgical processes.

Please refer to Item 2. Properties for more detailed information on the Nkamouna Project and other deposits held by GeoCam, and by other subsidiaries of the Company.

GeoCam Shareholder and Other Agreements

Geovic is party to a 2007 shareholders agreement with the other GeoCam shareholders, Societe Nationale d’Investissement du Cameroun (“SNI”) (the owner of a 20% interest in GeoCam), and four Cameroonian individuals (collectively, the owners of a 19.5% interest in GeoCam and represented by SNI) (the “Shareholders Agreement”). The Shareholders Agreement reflects the historic ownership and management arrangements among the shareholders and sets forth the terms, conditions and fiscal arrangement for continued participation by the shareholders in GeoCam. The Shareholders Agreement includes provisions in accordance with Cameroon business laws for all shareholders to contribute their proportionate share of capital required by GeoCam to meet its annual operating expenditures, as approved periodically by the GeoCam Board of Directors.

As provided in the Shareholders Agreement, in 2007 GeoCam began to operate autonomously from Geovic. Geovic and GeoCam entered into annual Technical Services Contracts for each of 2008 through 2011 under which Geovic provided certain staff, services and management to assist GeoCam to carry out its budgeted work program at rates set forth in the Technical Services Contracts. SNI also provided services to GeoCam under similar annual agreements during those years.

All the Cameroon Properties are held by GeoCam, and the Mining Convention and Mining Permit are issued to GeoCam. Pursuant to the Shareholders Agreement, the GeoCam Board of Directors consists of five directors, three of whom are selected by Geovic and two by the other Cameroonian shareholders. Geovic is entitled to nominate the General Manager/Managing Director and one Deputy General Manager while other shareholders are entitled to nominate the second Deputy General Manager. Although we are a majority shareholder and our representatives form a majority of the Board of Directors of GeoCam, we generally seek concurrence from the other shareholders for material policy and operational decisions.

Nkamouna Project Financing Activities

In December 2009, we engaged Standard Chartered Bank as the Company’s financial advisor in connection with preparing and planning for project financing, reviewing documentation, considering early-stage efforts to locate potential purchasers of the MSP and manganese carbonate products we expect that GeoCam will produce, and related activities. In August 2010, GeoCam assumed the engagement with Standard Chartered Bank. Commencing in 2010, and continuing to the present time, we have met with various large international businesses that have indicated an interest in a potential strategic investment in the Project in order to secure the future off-take from the Nkamouna Project. Such a potential strategic investment, if it occurs, may offset some or the entire equity funding obligation of the GeoCam shareholders.

The Company and the other GeoCam shareholders have continued to discuss possible strategic investment arrangements with several large Asian companies, and during the third quarter through the date of this report we have negotiated with state owned companies in Asia. These discussions could lead to proposals under which the strategic investor would acquire a large interest in GeoCam or in the Nkamouna Project directly, for cash, and would assist GeoCam to raise the additional required funding to construct the Nkamouna Project and the investor would gain preferred access to Project offtake. Under such an arrangement our interest in the Nkamouna Project would be reduced, perhaps significantly, or eliminated. As of the date of this report, no such proposal has been finalized.

 

7


Table of Contents

If we are successful in selling some or all of our interest in the Project to a third party, our future requirement to fund GeoCam and Project construction would be reduced or possibly eliminated.

Cameroon Properties

We believe that the Nkamouna Project will be the largest primary cobalt producing mine in the world when placed in full production.

Our business plan has been to use our available management, technical expertise and talent to develop our interests in the Cameroon Properties into a high quality mining and mineral production operation. Assuming external financing in sufficient amounts to complete construction and start-up activities was available on a timely basis, we would continue to focus on the Nkamouna Project where our plan would be to begin initial mine production approximately three years after completion of Project financing. The remaining steps to production therefore include securing one or more qualified strategic investors for the Nkamouna Project and obtaining the financing required to construct and commission the mine and plant facilities. We expect that such a strategic investment will result in a significant dilution of our ownership interest and a change in control of the Project. In such event we may not be involved in future management of the Nkamouna Project.

We presently have no current revenue from operations and we expect to continue to generate losses and negative cash flows until after mine and processing operations begin on the Nkamouna Project. See Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

Change of Corporate Strategy

As discussed in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operation, we are seeking to 1) realize value for the Cameroonian assets and 2) shift the Company’s focus to a prospect generation and strategic investment business model in 2012 and beyond. Because our position in GeoCam will likely be significantly diminished or completely eliminated through strategic investment upon completion of a financing transaction, the future direction for the Company will be to identify new exploration prospects, minimally develop and prioritize existing and new prospects, and sell or joint venture further exploration and development of those prospects to others. The Company expects to take its exploration prospects to a level where they can be timely monetized through strategic investments by others who have the resources to complete advanced exploration, permitting and development.

Other Activities

We are also evaluating other mineral properties and prospects in the United States and elsewhere to diversify our business activities. We believe that opportunities exist to acquire interests suitable for mineral exploration and future development.

Through our subsidiary Geovic Energy Corp. we acquired uranium leases, exploration permits and claims in Colorado and Wyoming during 2007, 2008 and 2010. During 2011 we mapped and analyzed these and nearby properties using existing data and we are now holding these properties for possible sale to third parties as we do not expect to further explore or develop these properties at this time.

We identified chromite deposits in New Caledonia, a French overseas territory (collectivity) northeast of Australia in the South Pacific in 2009. In 2010 through our subsidiary Geovic Mineral Sands Corp. we applied for exploration licenses covering approximately 100 square kilometers on and offshore. These licenses were granted in early 2011 and we devoted the balance of the year to conducting requisite environmental impact surveys and meetings with local populations in areas near the planned exploration activities as required prior to authorization for exploration drilling. Once the final drilling authorizations are received, we plan to explore these areas later in 2012.

 

8


Table of Contents

In 2011 we conducted additional prospecting in southeastern Arizona near our existing state permits and federal mining claims. By year-end 2011 we held approximately 48 square miles of surface prospects for further exploration for gold under leases, exploration permits or claims.

In late 2010 and 2011 we filed mining claims on federal land in southeastern New Mexico where our prospecting activities during the year showed possible deposits of certain advanced metals and zirconium. We obtained drilling authorization on a small tract of the land covered by several of the federal mining claims and commenced a limited shallow drilling program in 2011, the results of which have not been determined as of the date of this report.

In 2011 we applied for exploration licenses in Papua New Guinea for areas where we believe there may be deposits of advanced and specialty metals. We were awarded an exploration permits for these areas in March 2012.

Please refer to Item 2. Properties for more information on these other mineral prospects.

Competitive Conditions

We expect that GeoCam will compete with other cobalt and nickel producers around the world, including those with projects now under development. Other producers with ongoing operations have established production and demonstrated feasibility and have greater financial strength than we do. These competitors include such current producers as Xstrata, Vale, Freeport, Sherritt/Dynatec and Glencore. Significant mines either producing or expected to produce cobalt as a by-product during the next few years include Ambatovy (Sherritt, Sumitomo, Korea Resources and SNC Lavalin), Weda Bay (Eramet), Tenke Fungurume (Freeport McMoRan, Lundin Mining Corp. and Gecamines), Goro Nouvelle-Calédonie (Vale), and Boleo (Baja Mining Corp.). Operating expenses, reserve quantities and qualities, operating efficiencies, and location may affect the long-term success of all competing producers, including GeoCam.

Social and Environmental Policies

Geovic Mining Corp. is committed to sustainable development and social responsibility. We understand that our long-term business security is directly related to the welfare of the people and communities in the areas where we operate. In the end, these are the people who should be the main beneficiaries of our activities. We are also committed to excellence in stewardship of the environment. We believe that a strong sense of corporate social and environmental responsibility is essential for our success.

Applicable environmental protection requirements will affect the financial condition, operating performance and earnings of the Company as a result of capital expenditures and operating costs required to meet or exceed these requirements. These expenditures and costs may also have an impact on our competitive position to the extent that our competitors may be subject to less rigorous requirements or may be less willing to voluntarily target a similarly high level of environmental and social performance. GeoCam is subject to ongoing obligations under its mining and environmental permits in Cameroon to provide social and educational assistance to persons and in areas impacted by the mining activities. These obligations will be handled both directly and by engaging third parties, such as GeoAid International (“GeoAid”), to provide specified services.

An ESA, comprised of an Environmental and Social Impact Assessment (“ESIA”) and an Environmental and Social Action Plan (“ESAP”), has been prepared to document the existing environmental and social conditions, describe the proposed operation, identify potential impacts, develop mitigation measures to reduce or minimize the impact of the operation, and the actions needed to assure implementation of the mitigation measures are undertaken at the Nkamouna Project. Knight Piésold and Co. (“Knight Piésold”) and Rainbow Environment Consult (“REC”) were retained by Geovic Ltd. in 2004 to develop the ESA, which was completed and submitted to the Ministry of Environment and Protection of Nature (the “Ministry”) in 2006 and approved by the Ministry in May 2007. Both Knight Piésold and REC continue to provide services to the Project today.

 

9


Table of Contents

Since approval of the ESA, GeoCam has been diligently moving the Project forward toward construction. As part of that process, a number of Project elements have been modified and optimized since finalizing the ESA in 2006. Consequently, Knight Piésold and REC prepared the “Geovic Cameroon PLC, Nkamouna Project, Environmental and Social Assessment 2010 Update” (the “Update Report”) dated March 31, 2010 based on more recent Project plans. The Update Report was presented to the Ministry in May 2010.

The Ministry notified GeoCam in September 2010 that the Update Report provides an appropriate demonstration that the Project continues to move forward and therefore remains in conformity with regulatory requirements. However, the Ministry required that GeoCam consolidate the 2007 ESA, the Update Report, and any other Project modifications that may be put forward in the final Feasibility Study into a single document. Following the issuance of the final Feasibility Study in April 2011, GeoCam finalized the consolidation of the updated ESA and reissued it to the Ministry at the end of April 2011. Given that the Ministry has already acknowledged that the Project remains in full conformity with the regulatory requirements, the review process for the Update Report is expected to be routine.

Geovic collaborates with GeoAid, an IRS-recognized 501(c)(3) non-profit humanitarian corporation. GeoAid has domestic operations in Oregon and on-going humanitarian and social programs in Cameroon. Its mission is focused on reducing poverty by meeting the needs of people and communities impacted by mining and extractive operations in the developing nations of the world. Originally conceived and fully funded by the Company, GeoAid now is an independent entity that partners with Geovic and other private donors to further its mission. This collaboration, along with services from other contractors, satisfies certain GeoCam ESAP commitments, but Geovic has been committed to GeoAid and its social and humanitarian initiatives since well before there was a regulatory requirement to do so, and GeoAid’s activities with the Nkamouna Project area go beyond GeoCam’s regulatory commitments.

GeoAid operates in Cameroon through its implementing partner, GeoAid Cameroon. GeoCam has retained GeoAid Cameroon under a service contract to assist with the planning, management, implementation, monitoring and reporting on certain of its community development initiatives. The Company also supports GeoAid at the corporate level. Corporate grants made to GeoAid are coupled with other private contributions such that GeoAid has successfully solicited significant gift-in-kind donations from several external donors. This resulted in significant added value for the people of Cameroon. This unique model of development and the partnership among Geovic, GeoCam and GeoAid achieves significant humanitarian and social assistance to beneficiaries in the Nkamouna Project area and throughout Cameroon at important cost-savings. Moreover, we continue to enjoy increasing goodwill at community and national levels for the Company and its subsidiaries.

Employees

All of our employees are employees of Geovic and our executive officers are also officers of Geovic. Geovic has 15 full time employees in its offices in the United States, and at year-end 2011, GeoCam had 22 full time employees and 10 contract workers in its administrative offices in Yaoundé and 23 contract workers and 5 full time employees at the Nkamouna Project operations location in the East Province in the Republic of Cameroon.

Offices

Our principal corporate head office is located at 1200 17th Street, Suite 980, Denver, Colorado 80202, Telephone (303) 476-6455. We also maintain an exploration office in Grand Junction, Colorado. GeoCam maintains its head office in the capital city of Yaoundé and a mine area office at Kongo Camp in the East Province, both in the Republic of Cameroon.

Available Information

Our website address is www.geovic.net. Available on this website under “Investor Relations” free of charge, are links to our annual reports on Form 10-K, quarterly reports on Form 10-Q including our interactive data files,

 

10


Table of Contents

current reports on Form 8-K, Forms 3, 4 and 5 filed on behalf of directors and executive officers and amendments to those reports after such materials are electronically filed with or furnished to the SEC.

Also posted on our website, and available in print upon request made by any stockholder to the Secretary, are charters for the Board’s Audit Committee, Human Resources and Compensation Committee, and Nominating and Corporate Governance Committee. Copies of the Code of Business Conduct and Ethics (“Ethics Code”) and our Whistleblower’s Policy are also posted on our website under the “About Geovic-Committee Charters” section. Within the time period required by the SEC, we will post on our website any modifications to the Ethics Code and any waivers applicable to senior officers as defined in the Ethics Code, as required by the Sarbanes-Oxley Act of 2002.

 

ITEM 1A. RISK FACTORS

We consider the risks set out below to be the most significant risks facing the Company, although these risks should not be considered to be comprehensive. If any of these risks materialize into actual events or circumstances or other possible additional risks and uncertainties of which we are currently unaware or which we consider not to be material in relation to our business, actually occur, our assets, liabilities, financial condition, results of operations (including future results of operations), business and business prospects, may be materially and adversely affected, and as a result, the trading price of our common stock and warrants could be materially and adversely impacted. These risk factors should be read in conjunction with other information set forth in this report, including our Consolidated Financial Statements and the related Notes.

We are an exploration stage company and have no history as an operating company. Any future revenues and profits are uncertain.

We have no history of mining or refining any mineral products or metals and none of our properties is currently producing. There can be no assurance that the Nkamouna Project will be successfully placed into production, produce minerals in commercial and processing quantities or otherwise generate operating earnings, or that we will secure a strategic investor in the Project or sell any or all of our interest in it. We will continue to incur losses at least until we sell some or all of our interest in the Project or mining activities successfully reach commercial production levels and generate sufficient revenue to fund continuing operations, which is estimated to be about three years after Project financing is obtained and construction commences on site. There is no certainty that we will produce revenue from any source, operate profitably or provide a return on investment in the future. If we are unable to generate revenues or profits, our stockholders might not be able to realize returns on their investment in our common stock. Even if we do achieve profitability, we may not be able to sustain or increase profitability on a quarterly, annual or sustaining basis.

We have a history of losses and if we are unable to secure additional financing our ability to continue as a going concern may be at risk.

As an exploration stage company, we have a history of losses, deficits and negative operating cash flows and do not plan on generating any revenue from operations in the foreseeable future. As of December 31, 2011, we had an accumulated stockholders’ deficiency of approximately $102.8 million. To date, we have been unable to secure project financing for our Nkamouna Project and the current economic environment, which is characterized by uncertain credit markets, investor uncertainty about how to safely invest funds and low investor confidence, has introduced additional risk and difficulty to our challenge to secure needed additional working capital. These factors, among others, could raise doubt about our ability to continue as a going concern. Our Consolidated Financial Statements included in this report do not include any adjustments related to recoverability and classification of asset carrying amounts or the amount and classification of liabilities that might result should we be unable to continue as a going concern.

We continue to actively seek project financing for our Nkamouna Project and new sources of working capital. We cannot assure we will be able to obtain sufficient additional funds when needed, or that such funds, if available, will be obtainable on terms satisfactory to us.

 

11


Table of Contents

We have limited cash resources.

Our consolidated cash balance at December 31, 2011 was $15.6 million. We have been closely monitoring our fixed and variable costs and intend to restrict such costs to those expenses that are necessary to complete activities related to securing project financing for our Nkamouna Project, identifying opportunities to generate cash from our existing exploration properties and identifying additional sources of working capital in support of such activities. We anticipate that the Company will be able to satisfy the cash requirements of its operations through at least the next twelve months with current cash resources, however, we may be unable to obtain long-term funding and our near-term expenses could be greater than projected. If we are unable to obtain additional capital, we will need to further curtail our operations in order to preserve working capital, which could materially harm our business and our ability to achieve cash flow in the future, including delaying or reducing implementation of certain aspects of our plans for developing the Nkamouna Project, and we may ultimately need to cease operations.

We continue to actively seek new sources of working capital. Our financial statements do not include any adjustments that might be necessary if we are unable to continue as a going concern.

Unless we obtain significant additional external financing, enter into a strategic alliance or sell all or a portion of our interest in GeoCam, we will be unable to develop the Nkamouna Project.

The Nkamouna Project requires capital start up and financing expenditures and contingency reserves of at least $800 million to construct mining and processing facilities and related infrastructure. We will require external debt and equity financing to fund development and construction of mining and processing facilities. The expected sources of external financing for these purposes include secured project debt incurred by GeoCam, convertible debt of the Company or GeoCam and equity placements by GeoCam or the Company. In addition, the Company may consider the sale of some or all of its interest in GeoCam and/or GeoCam may consider a sale of an interest in GeoCam or in one or more of the other Cameroon deposits, GeoCam could enter into a strategic alliance with another company or we may utilize some combination of these alternatives. We intend that GeoCam will seek financing from international institutions with significant experience in financing large natural resource ventures in remote locations such as southeastern Cameroon. Such financiers will likely require GeoCam and its owners to comply with costly conditions as a requirement to completion of project financing, including significant additional equity contributions to GeoCam. The financing options chosen may not be available on acceptable terms, or at all. The failure to obtain adequate financing on a timely basis will have a material adverse effect on development of the Nkamouna Project, our growth strategy, results of operations and future financial condition.

The development of the Nkamouna Project will require the commitment of substantial financial resources. The amount and timing of these costs will depend on a number of factors, some of which are beyond our control.

We will be subject to all of the risks associated with establishing new mining operations and business enterprises including: the availability of funds to finance construction and development activities; timing and cost of the construction of mining and processing facilities; the efficacy of planned mineral processing; the availability and costs of skilled labor and mining equipment; the availability and cost of appropriate processing materials and equipment; the need to obtain in a timely manner additional governmental approvals and permits; the likely terms of off-take agreements or metal sales contracts; potential opposition from non-governmental organizations, environmental groups or local groups in Cameroon which may delay or prevent development activities; and potential increases in construction and operating costs due to changes in the cost of fuel, power, equipment, materials and supplies. Further, the costs, timing and complexities of mine construction and development are increased by the remote location of the Cameroon Properties. Accordingly, our activities may not result in profitable mining operations and we may fail to successfully establish or maintain mining operations or profitably produce metals at any of our properties.

 

12


Table of Contents

The actual capital costs and mine operating costs to be incurred in connection with opening the Nkamouna Project may be significantly higher than anticipated.

The Feasibility Study completed in April 2011 estimates construction costs and related expenses, contingency reserves and financing fees at approximately $800 million, which is significantly higher than was estimated in earlier studies. Estimated future operating expenses are also higher than estimates made in previous studies. These and similar cost and expense increases are beyond our control, and will require significantly more capital to bring the Nkamouna Project into production and could result in a decrease in our anticipated future return from operations. Our actual capital costs and operating costs may be higher than we presently anticipate.

Our plan to change the focus of our business may not be successful. We may not be successful in monetizing our exploration prospects.

Our present plan is to liquidate some or all of our interest in the Nkamouna Project and begin to generate mineral exploration prospects suitable for transfer to others in the mineral development business. We presently hold interests in several exploratory prospects that must be advanced to a point that others would have an interest in acquiring them. We may be unable to sell our current prospects to third parties and we may be unsuccessful in generating other mineral prospects for such purposes. If we are unable to monetize prospects we would be unsuccessful in our plans for future business operations.

Market events and economic conditions may adversely affect our business and the mining industry.

International credit markets or Canadian, United States, Cameroon or global economic conditions, could, among other things, impede access to capital or increase the cost of capital, which would have an adverse effect on our ability to fund the working capital and other capital requirements of GeoCam. Unprecedented disruptions in credit and financial markets in 2008 and 2009 had a significant material adverse impact on a number of financial institutions and limited access to capital and credit for many companies, particularly resource companies such as the Company. While these disruptions have improved, the global economy remains unpredictable, particularly due to the growing debt in the United States and the financial instability of certain European countries. It could be more difficult or more expensive for GeoCam to obtain capital and financing for construction and for operations. Access to capital and financing may not be available on terms acceptable to the Company or at all. Nkamouna Project development modifications may be necessary or desirable to secure lending commitments which would also delay the completion of any financing. All delays in completing financing for the Project will delay mine construction, anticipated production activities and future revenue.

Inflation or deflation, changing tax laws, and fluctuating interest rates may make project development more difficult. These factors have had a significant effect on Cameroon’s economy in recent years. Economic conditions may have an adverse effect on the overall performance of the Company. In addition, various economic conditions could increase the risk that financial projections for the Nkamouna Project may not be realized as expected.

The share prices of junior natural resource companies, including Geovic Mining, experienced large declines in value from 2008, stabilizing in 2010, and again declining in 2011. Market forces are likely to make it difficult or impossible for the Company to raise equity capital except on terms which results in severe dilution to existing stockholders, or at all. Therefore, there can be no assurance that significant fluctuations in the trading price of the Company’s common stock will not continue, or that such fluctuations will not materially adversely impact the Company’s ability to raise equity.

 

13


Table of Contents

General economic conditions may adversely effect our growth and profitability.

A worsened slowdown in the economy and other economic conditions, including but not limited to, consumer spending, employment rates, business conditions, continued inflation, increases in fuel and energy costs, consumer debt levels, interest rates, and tax rates may adversely affect our growth and profitability. Specifically:

 

   

the global economic slowdown could impact the cost and availability of financing and our overall liquidity;

 

   

the volatility of commodity prices could impact our future revenues, profits, losses and cash flow;

 

   

increasing energy prices, commodity and consumables prices and adverse currency exchange rates could impact our production costs;

 

   

volatility of global stock markets could impact the valuation of our equity and other securities; and

 

   

increasing construction related costs could increase and adversely affect economics of the Nkamouna Project.

These factors, among others, could have a material adverse effect on our financial condition and results of operations.

GeoCam may fail to secure Nkamouna Project financing if lenders or their advisors conclude that the ore processing techniques considered in the Feasibility Study are too risky or are otherwise not feasible.

In response to observations that raised questions about the efficacy of a few aspects of planned ore processing considered in previous feasibility studies, beginning in 2010, we modified certain of the metallurgical processes planned to be utilized and decided that GeoCam will not refine final metal products from the Nkamouna Project ore at the project site. If potential lenders are not ultimately assured that the modified metallurgical processes will allow the processing facilities to operate successfully as designed, Nkamouna Project debt or other financing may be delayed until further enhancement testing is performed or funding could be unavailable altogether.

If we lose key personnel or are unable to attract and retain additional experienced personnel, we may be unable to establish and develop our business.

Our development in the future will be highly dependent on the efforts of our key management employees, namely, Michael Mason, Barbara Filas, William A. Buckovic, Timothy Arnold, Gary Morris, Greg Hill, (currently Chief Executive Officer, President, Executive Vice President, Chief Operating Officer, Senior Vice President, and Chief Financial Officer, respectively), and Phillip Mason, General Manager of GeoCam and other key employees that we or GeoCam may hire in the future. Loss of any of these executives could have a material adverse effect on our operations and future success. We do not have and currently have no plans to obtain key man insurance with respect to any of our key employees.

The other shareholders of GeoCam may fail to pay their share of future GeoCam capital.

Under the Shareholders Agreement, all GeoCam shareholders agreed to fund their proportionate share of capital and operating costs. However, it is possible that the minority shareholders will be unable or unwilling to provide their respective share of future GeoCam funding, and we may be required to delay the Project.

Our lack of operating experience may cause difficulty in managing our growth.

Geovic has owned a majority interest in GeoCam since its inception more than a decade ago. Geovic employees have managed the exploration of the GeoCam deposits and negotiated the terms of the required Cameroon government approvals and permits and financings we have completed. While we hold a significant

 

14


Table of Contents

interest in the Project, we will continue to provide many of such services to GeoCam. Our ability to manage our continued growth will require us to improve and expand our management and our operational and financial systems and controls. If our management is unable to manage our growth and the development of the Cameroon Properties effectively, our business and financial condition could be adversely affected.

GeoCam’s dependence on many outside service providers to place the Nkamouna Project into production may delay mine opening or operation.

GeoCam’s ability to place the Nkamouna Project into production will be dependent to a large part upon using the services of appropriately experienced employees, consultants and contractors working under our supervision and agreements with other major resource companies that can provide required expertise or equipment. In 2010 we recruited and hired a new General Manager for GeoCam with senior level mining and operating experience. Also, a significant local work force will be trained, few of whom currently have any related experience. We may not have available to us, or we may be unable to retain on satisfactory terms, the necessary expertise, equipment or local workers to build the GeoCam facilities and place the Nkamouna Project into production.

Our development activities in Cameroon may not be commercially successful.

We currently have no producing properties. Substantial expenditures are required to develop the Nkamouna Project, to drill and analyze for additional ore reserves, to construct facilities to implement the metallurgical processes to extract metal from the mined ore and to develop the mining and processing facilities and infrastructure at each deposit site chosen for mining and future financing required to commence mining operations may not be obtained on a timely or cost-effective basis or on terms acceptable to us.

The prices of cobalt, nickel and manganese are subject to fluctuations which could adversely affect the realizable value of our assets, future results of operations and cash flow.

Our principal assets are deposits of cobalt, nickel and manganese in the Nkamouna and other six deposits held by GeoCam. Our potential future cash flow is expected to be, in large part, derived from the mining, processing and sale of cobalt, nickel, manganese and related mineral products from the Cameroon Properties or from the outright sale or joint venture of some or all of our interest in these properties. The value of these deposits, and the value of any potential production therefrom, will vary in proportion to changes in cobalt, nickel and manganese prices. The prices of these commodities have fluctuated widely, peaked and declined significantly in 2008, partially recovered through 2010, and were again lower at the end of 2011. These commodity prices are affected by numerous factors beyond our control, including, but not limited to, available production from other mines, worldwide economic conditions, international economic and political trends, realized or expected levels of inflation, currency exchange fluctuations, central bank activities, interest rates, global or regional consumption patterns and speculative activities. The effect of these factors on the prices of cobalt, nickel and manganese and therefore the economic viability of the Nkamouna Project, cannot be accurately predicted. Significant future decreases of the cobalt price, and to a lesser extent, nickel and manganese, would adversely affect asset values, future cash flows, revenue and profits if the Nkamouna Project is placed into production.

GeoCam may not be able to produce and sell mineral products at profitable prices. Our future operations are, therefore, more exposed to the impact of future decreases in commodity prices. Conversely, forward sales contracts would limit potential upside market swings. Such upside price swings could have a significant benefit to companies that take added market risk and sell produced mineral product on the open spot metals market. There are no central markets for the intermediate cobalt, nickel and manganese products we intend to produce and sell, and these products will likely be sold under metal sales agreements for process plant off-take with one or more companies. Prices under these agreements would be related to prevailing market prices at time of delivery. Selling intermediate products produced at mine site, while reducing process risk and required capital

 

15


Table of Contents

expense, will also likely result in lower operating profit and cash flow from the mining and processing operations. There may be reduced demand or no market for intermediate products that are expected to be produced at the Nkamouna Project site.

Our mining exploration, planned development and operating activities are inherently hazardous and may not be insured or insurable.

Mineral exploration and development involves many risks and hazards that even a combination of experience, knowledge and careful evaluation may not be able to overcome. The business of mining is subject to certain types of risks and hazards, including reserve and resource estimates, processing risks, environmental hazards, metallurgical and process risks, industrial accidents, flooding, fire, metal theft, personal injuries, accidents, and periodic disruptions due to force majeure events and inclement weather. Workers are subject to risks associated with large mining equipment operations, slope instability, exposure to indigenous disease, steam and hazardous chemicals, as well as local social unrest. Disruption of exploration, development and production operations may occur. The hazards and risks normally incidental to exploration, development and production of minerals, may result in work stoppages, damage to property and possible environmental damage. The nature of these risks is such that liabilities might exceed any liability insurance policy limits. It is also possible that the liabilities and hazards might not be insurable, or, that we could elect not to insure Geovic Mining or GeoCam against such liabilities due to high premium costs or other reasons, in which event, we could incur significant costs that could have a material adverse effect on our financial condition.

Our present mineralized material and future reserve estimates may be inaccurate which could adversely affect the estimated value of our future mining activities.

There is a high degree of uncertainty attributable to the calculation of mineralized material and reserves and ore grades dedicated to future production because such estimates are expressions of judgment based on knowledge, experience and industry practice, and estimates of reserves may prove to have been inaccurate. Estimates which were valid when made may change significantly when new information becomes available. Accordingly, development and mining plans may have to be altered in a way that adversely affects the Company’s operation and profitability. There is a risk that full scale production activities may indicate technical and commercial shortcomings to whatever operating methodology is installed. Consequently, actual results may vary materially and adversely affect projected values given to reserves.

Until reserves are actually mined and processed, the quantity of ore and grades must be considered as an estimate only. In addition, the quantity of reserves and ore may vary depending on metal prices. Any material change in the quantity of reserves, grade or overburden stripping ratio or price of cobalt, nickel and manganese may affect the economic viability of our properties. In addition, metal recoveries obtained in pilot-scale tests may not be duplicated during production.

Our Nkamouna Project could become subject to financing or other delays while conformance with our Biodiversity Management Plan (BMP) and Equator Principles is achieved; Estimates of mineral resources or mineralized material could be impacted.

Environmental permits required to construct and operate the Nkamouna Project were received by GeoCam from the government of Cameroon in 2007 and reaffirmed in September 2010. Included in these authorizations was our commitment to a number of follow-on environmental, social, health and safety obligations, including preparation of a BMP and delineation of critical habitats, if they exist within the project area. The Equator Principles are a credit risk management framework for determining, assessing and managing environmental and social risk in project finance transactions. International lending institutions voluntarily subscribe to the Equator Principles and commit to providing loans to projects only where the borrower can and will comply with certain social and environmental expectations. Accordingly, borrowers such as GeoCam must demonstrate that their projects can and will conform to the Equator Principles. Among those expectations is the obligation to protect

 

16


Table of Contents

biodiversity and important natural habitats. An independent expert was engaged by GeoCam in mid-2011 as a part of our ongoing BMP implementation to determine whether or not endangered species and/or critical habitat may be affected by the Nkamouna Project. The advisor reported that great apes and other important fauna species use the area and that certain wetlands around a portion of the Mada area of the Project may represent higher value habitat. Subsequently, a panel of qualified independent experts reviewed the advisor’s work and recommended that additional studies be carried out to better enumerate animal presence and the importance of the habitat to the species before mitigation measures are applied. These additional studies could indicate that additional mitigation measures are required. In addition, there are risks that prospective lenders could require additional mitigation or other actions not presently anticipated before funding project debt, thus potentially delaying financing and construction activities while such actions are undertaken and increasing our preconstruction costs. Also, areas included within the mine permit area could be withdrawn from future mine development activities as a means of offsetting adverse Project impacts. Such a decision could reduce our present reserves and mineralized material and/or may result in other areas being withdrawn either within or outside of the Mining Concession.

We face intense competition in the mining industry.

The mining industry in general, and cobalt mining in particular, are intensely competitive in all phases. A significant number of new cobalt-producing projects have been announced in recent years and if placed in production, the resulting increased supplies of cobalt could adversely affect prices available for our expected production. Competitors include large established mining companies with experience and expertise and with greater financial and technical resources, and as a result we may be unable to obtain financing, or sell mined and processed products on terms we consider acceptable. We compete with other mining companies in the recruitment and retention of qualified managerial and technical employees and in the raising of capital. If we are unable to raise sufficient capital, our exploration and development programs may be jeopardized or we may not be able to develop or operate our projects. Also, our decision to produce and sell intermediate products is likely to reduce significantly the number of customers for our metals produced.

There presently is a lack of required infrastructure in Cameroon which could delay or prevent completion of our mine development activities or increase operating costs.

Completion of the development of the Nkamouna Project is subject to various infrastructure requirements, including the availability and timing of acceptable arrangements for site access, power, water, housing, transportation and other facilities at the project site. The lack of availability on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay development. There can be no assurance that construction will be commenced or completed on a timely basis, if at all, that the resulting operations will achieve the anticipated production or that the construction costs and ongoing operating costs associated with the development will not be higher than anticipated.

Challenges to our title to mineral properties in which we may have an interest could affect our exploration or development rights.

GeoCam could be deemed noncompliant with terms or conditions of its Cameroon mining and other permits and authorizations. There may be challenges to title to other mineral properties that we currently control or which we may acquire in the future. Our exploration activities in New Caledonia may not lead to other required permits from the government. If there are title defects with respect to any of our properties, we might be required to satisfy additional government requirements, compensate other persons or perhaps reduce our interest in the affected property or lose our interest completely. Also, in any such case, the investigation and resolution of title issues would divert our management’s time from ongoing exploration and development programs.

 

17


Table of Contents

Our exploration and development operations are subject to continuously evolving environmental regulations, which could result in incurrence of additional costs and operational delays.

All phases of our operations are subject to environmental regulation. Environmental legislation is evolving in countries and local jurisdictions in a manner which will likely require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, and a heightened degree of responsibility for companies and their officers, directors and employees. Future changes in environmental regulation, if any, could adversely affect our projects.

Acquisition of mineral rights from governmental agencies in the United States requires compliance with applicable regulations and could add costs and delays to future development.

We intend to continue to acquire properties or mineral rights in the United States. All mineral development in the United States is subject to regulation and compliance regardless of land tenure. Development projects are regulated at the state level, and in some states, also at the county level, and we must comply with the regulations relating to mining; land use; air quality; water quality, quantity and supply; and solid and hazardous wastes in the state within which the properties are located. If a state does not have an established program for regulating air, water and waste (pursuant to the federal Clean Air Act, Clean Water Act and the Resource Conservation and Recovery Act), then the U.S. Environmental Protection Agency will have direct regulatory jurisdiction. Depending on the state, there may be other applicable federal regulatory programs that also apply beyond those enacted by the state.

Mineral development (and other) actions on public lands managed by federal land management agencies such as the Bureau of Land Management (“BLM”) or the United States Forest Service (“USFS”) are obliged to file an acceptable plan of operations which is then subject to an environmental impact evaluation under the National Environmental Policy Act (“NEPA”). The NEPA process requires the completion of either an environmental assessment or an environmental impact statement prior to approval of the plan of operations. Whether on public or private land, mining companies must comply with all relevant federal, state and county requirements and will be required to post a bond or other surety to guarantee the cost of post-mining reclamation.

Federal, state, and local regulatory requirements including public disclosure processes and opportunities for stakeholders to appeal regulatory decisions, or changes to these requirements, could add significant additional cost and delays to any mining project we undertake in the United States. Permitting rules and/or discharge limits established at the federal, state, or local level may impose limitations on our production levels warranting additional capital expenditures in order to comply with the rules.

We may develop conflicts of interest with other natural resource companies with which one of our directors may be affiliated.

Certain of our directors are also directors and officers of other natural resource companies. Consequently, there exists the possibility for such directors to be in a position of conflict. We expect that decisions made by any of such directors relating to the Company will be made in accordance with their duties and obligations to deal fairly and in good faith with the Company and such other companies.

Many factors beyond our control could adversely affect our future profitability.

The cost, timing and complexities of mine construction and development are increased by the remote location of the Cameroon Properties. It is common in new mining operations to experience unexpected problems and delays during construction, development, mine start-up and ramp-up to full commercial production. Also, ongoing cost and expense increases being faced throughout the mining and natural resources industries are beyond our control. Accordingly, our activities may not result in timely or profitable mining operations, and we may fail to successfully establish mining operations or profitably produce metals at any of our properties. In

 

18


Table of Contents

addition, the progress of ongoing exploration and development, the results of consultants’ analysis and recommendations, the rate at which operating losses are incurred, and the Company’s acquisition of additional properties will also impact the magnitude of the cost and timing of Company expenditures.

If we are unable to comply readily with present or future laws and regulations of the Republic of Cameroon, development activities could be delayed and profitability not achieved or reduced.

The current and future development of the GeoCam Properties requires permits from various Cameroon governing authorities. Future operations will be subject to a number of existing laws and regulations such as labor standards, environmental reclamation, land use and safety. GeoCam must receive a Land Lease for that portion of the mine permit area to be used for the Nkamouna Project. It must also obtain authorization to develop an on-site rock quarry if suitable aggregate is not purchased from external sources. These and other permits required to construct and operate a mining and processing facility may contain terms and conditions that are difficult or expensive to meet. Such laws and regulations may adversely affect the profitability of GeoCam’s operations.

Political unrest or changes in Cameroon or nearby countries could interfere with our mining rights and development or financing activities.

Mine exploration, development and production activities are subject to regional, political, community and other risks of doing business, including risks inherent in contracts with government owned entities such as unilateral cancellation or renegotiation of contracts, licenses or other mining rights.

The political risk in sub-Saharan Africa is significant. GeoCam’s rights to explore and develop mineral deposits in Cameroon are always subject to the continued political stability of the Republic of Cameroon and its government. In March 2008 Cameroon experienced some domestic strikes and political unrest that subsided within weeks. Also, political unrest or upheaval in adjoining countries could adversely affect our development activities with respect to the Nkamouna Project, and, if significant, would likely increase the costs of long term financing of the mining and processing activities. Further, GeoCam may not be able to finance or operate the Nkamouna Project at all if future state or regional political upheavals occur in Cameroon.

Potential violations of the Foreign Corrupt Practices Act (“FCPA”) by GeoCam, its agents or representatives could have a material adverse impact on our financial condition and results of operations.

The FCPA prohibits payments of, promises to pay, or authorizations to pay, money, gifts or anything of value to officials of foreign governments, in order to “obtain or retain” business. Payments or gifts to a third party, such as an agent or sales representative, while knowing (or having reason to know) that all or part of the money or gift will be offered or given to such an official, are also prohibited. If employees violate the FCPA, the violation creates severe potential criminal and civil liability for themselves and the affiliated U.S. company. The types of conduct prohibited by the FCPA are not always clear. As a result, caution is required when doing business through foreign consultants, commercial representatives or agents, or with businesses that are owned, in whole or in part, by foreign governments or that have personal or family ties to government officials. We do not oversee the day to day operations of employees or representatives of GeoCam. Although we emphasize compliance with the FCPA to all our employees and representatives and those of GeoCam, there remains a risk of violation in Cameroon or in the other countries where we may have operations.

We may fail to maintain the adequacy of internal control over financial reporting as required by the Sarbanes-Oxley Act.

In 2008 we documented and tested our internal controls and procedures in order to satisfy the requirements of Section 404 of the Sarbanes-Oxley Act of 2002 (“SOX”). SOX requires an annual report by management of the effectiveness of the Company’s internal control over financial reporting. Management evaluated the

 

19


Table of Contents

Company’s disclosure controls and procedures and concluded that they were not effective as of December 31, 2008. Also, the Company’s Chief Executive Officer and Chief Financial Officer evaluated our internal control over financial reporting and determined that material weaknesses existed as of December 31, 2008.

We implemented a number of actions during 2009 to remediate the weaknesses and improve our internal control over financial reporting. Our management evaluated our disclosure controls and procedures and our internal controls over financial reporting as of December 31, 2009 and concluded that disclosure controls and procedures were effective and that internal control over financial reporting was effective to provide reasonable assurance regarding the reliability of our financial reporting and the preparation of our financial statements in accordance with US GAAP. Our management reached similar conclusions as of December 31, 2010 and 2011.

We may be unable to ensure in the future that we have effective internal controls over financial reporting or effective disclosure controls and procedures as defined by applicable rules. Because the financial statements of GeoCam are consolidated, GeoCam financial reporting is also subject to SOX. Our failure to satisfy the requirements of Section 404 of SOX on an ongoing, timely basis could result in the loss of investor confidence in the reliability of our financial reporting and disclosure, which in turn could harm our business and negatively impact the trading price of our common shares. In addition, difficulties in maintaining satisfactory controls and procedures could harm our future reported operating results or cause us to fail to meet our reporting obligations. Any future acquisitions of other businesses may provide us with challenges in implementing the required internal processes, procedures and controls in the acquired operations. Acquired companies may not have effective disclosure control and procedures or internal control over financial reporting that are as thorough or effective as those required by securities laws currently applicable to us.

No evaluation can provide complete assurance that our internal control over financial reporting will detect or uncover all failures of our personnel to disclose material information otherwise required to be reported. The effectiveness of our controls and procedures could also be limited by simple errors or faulty judgments. In addition, should we expand in the future, the challenges involved in implementing appropriate internal controls over financial reporting will increase and will require that we continue to improve our internal controls over financial reporting. Although we intend to devote substantial time and incur substantial costs, as necessary, to ensure compliance, we cannot be certain that we will be successful in complying with Section 404 of SOX on an ongoing basis.

Risks related to ownership of our stock

The market price of our common stock and warrants may be adversely affected by market volatility due in part to the current instability in the financial markets.

Our common stock price and warrant prices have decreased significantly since 2007. We cannot predict if or when current adverse economic conditions will be resolved or what the affect such instability may be on the price of our common stock and warrants.

Conditions beyond our control may cause wide price fluctuations in the market price of our common stock and warrants.

The market price of our common stock and warrants may be subject to wide fluctuations in response to many factors, including worldwide economic conditions and commodities prices, variations in our operating results, divergence in financial results from investors’ expectations, changes in performance estimates, changes in our business prospects, changes in mineral reserve or resource estimates, results of exploration, changes in results of mining operations, legislative changes, our liquidity and likely ability to achieve financing for the Nkamouna Project and other events and factors outside our control.

 

20


Table of Contents

Future sales of our securities in the public or private markets could adversely affect the trading price of our common stock and warrants and our ability to continue to raise funds in new stock offerings.

Future sales of substantial amounts of our securities in the public or private markets, or the perception that such sales could occur, could adversely affect prevailing trading prices of our common stock and warrants and could impair our ability to raise capital through future offerings of securities.

We do not intend to pay cash dividends in the near future.

Our Board of Directors determines whether to pay cash dividends on our issued and outstanding shares. The declaration of dividends would depend upon our future earnings, our capital requirements, our financial condition and other relevant factors. Our Board of Directors does not intend to declare any dividends on our shares for the foreseeable future. We anticipate that we will retain any future earnings to finance the growth of our business and for general corporate purposes.

Provisions of our Certificate of Incorporation, By-laws and Delaware law could defer a change of our management which could discourage or delay offers to acquire us.

Provisions of our Certificate of Incorporation, By-laws and Delaware law may make it more difficult for someone to acquire control of us or for our stockholders to remove existing management, and might discourage a third party from offering to acquire us, even if a change in control or in management might be beneficial to our stockholders. For example, our Certificate of Incorporation allows us to issue different series of shares of preferred stock without any vote or further action by our stockholders and our Board of Directors has the authority to fix and determine the relative rights and preferences of each series of preferred stock. As a result, our Board of Directors could authorize the issuance of a series of preferred stock with holders having the preferred right to our assets upon liquidation, preferred voting rights, preferred dividends before dividends are paid on common stock and/or redemption preferences or other preferred rights.

 

ITEM 1B. UNRESOLVED STAFF COMMENTS

None

 

21


Table of Contents
ITEM 2. PROPERTIES

Asbolane. The key mineral in the Nkamouna and Mada deposits, which hosts the cobalt, most of the manganese and a little less than half the nickel.

Breccia. A zone composed of broken fragments of minerals or rock cemented together by a fine-grained matrix.

Ferralite. Limonitic laterite, sometimes pulverulent, mottled, with varied shades of black, yellow, brown and red. Often foliated, reflecting relict serpentinite textures. Thickness varies from a few meters to tens of meters, averaging near 8 meters. Main ore unit, consistently mineralized with good metal grades near the top where black manganese zones occur, moderate to low cobalt grades lower in the unit.

Ferricrete breccia. Beneath the upper laterite is a nearly ubiquitous horizon of iron-rich concretions, ranging in size from one or two centimeters across, to blocks larger than a meter across. The ferricrete breccia averages 6 to 8 meters thick, and was often divided into two or three units by project geologists. A unit can contain very high cobalt grades, particularly at the base.

Gangue. The commercially worthless material that surrounds, or is closely mixed with, a wanted mineral in an ore deposit.

Hydrometallurgical process. One of several metallurgical processes that uses water and other liquids, chemicals and reagents for the leaching and recovery of soluble metals from ore.

Laterite. Soil types rich in iron and aluminum, formed in hot and wet tropical areas. They develop by intensive and long-lasting weathering of the underlying parent rock.

Leach and Recovery Circuit. That part of the mineral processing facility that accomplishes the hydrometallurgical process.

Manganese precipitate. Manganese compounds produced by precipitation from leach solutions.

Mine Permit. Republic of Cameroon Mining Permit Decree dated April 11, 2003.

Mining Convention. Mining Convention between The Republic of Cameroon and Geovic Cameroon, S.A., dated July 31, 2002.

Physical upgrade (PUG) circuit. More commonly known as a wash plant, designed to use water to remove much of the gangue from the run of mine mineralized material before processing in the leach and recovery circuit.

Saprolite. A chemically weathered rock. Saprolites form in the lower zones of soil profiles and represent deep weathering of the bedrock surface.

Serpentinite. Bedrock, olive green to dark green, may be fractured and fissile, with silica-filled fractures. Uniformly low metals grades except in rare cases where garnierite-like nickeliferous silicates fill fractures.

Tailings storage facility. A containment system comprised of a compacted, earthen structure or dike and a prepared basin area that is used to contain solid tailings and water from the mineral beneficiation process.

Tailings disposal. A method for disposing of tailings, waste rejects, and water from a processing operation into the tailings facility.

Tonne. One metric tonne is 1000 kilograms, or 2,204.6 pounds.

 

22


Table of Contents

Description of Mineral Projects

THE NKAMOUNA PROJECT

Geovic’s 60.5% owned subsidiary Geovic Cameroon PLC (GeoCam) received and published the Nkamouna Co-Ni-Mn Project Feasibility Study authored by Lycopodium Minerals Pty Ltd (Lycopodium) with contributions by SRK Consulting (U.S.), Inc. (SRK), Knight Piésold and Co. (Knight Piésold) and GeoCam (the “Feasibility Study”) in April 2011. Geovic then engaged SRK to prepare a Technical Report (the “2011 Technical Report”) for the Nkamouna and Mada Deposits (or the “Project”) to meet the requirements of Canadian National Instrument 43-101 (NI 43-101) and for the further development and advancement of the Project. The information below is summarized from the Feasibility Study and the 2011 Technical Report. Jeffrey Volk, CPG, FAusIMM, MSc and Bret Swanson, BE Mining, MAusIMM, both of SRK and Brett Malcolm Crossley, BAS (Chemistry), MAusIMM, of Lycopodium served as Qualified Persons for the 2011 Technical Report.

Property Description and Location

The Nkamouna and Mada deposits are located in southeastern Cameroon (Figure 1.), approximately 640 road kilometers east of the port city of Douala and 400 road kilometers east of the capital of Yaoundé, in the Haut Nyong Division, East Province.

The Nkamouna and Mada deposits are two of seven separately named laterite plateaus forming a crescent-shaped array, which extends 80 km north to south and 45 km east to west. The irregularly shaped laterite plateaus lie within the 1,645 km2 boundary defined by the Mine Permit, within which GeoCam has exclusive right to mine up to 1,250 km2. The plateaus are Nkamouna, Mada, Rapodjombo, North Mang, South Mang, Messea and Kondong, and all are included within the Mine Permit area (Figure 2.).

The Nkamouna Cobalt-Nickel-Manganese Project includes development of the Nkamouna and Mada deposits utilizing open-cut mining methods, physical upgrading and hydrometallurgical processing and associated Project infrastructure at the Project site. GeoCam holds the Mining Permit. Most of the Mining Permit lands are zoned “mineral exclusive” lands, and assign exclusive rights to the cobalt, nickel and related materials within the Mining Permit to GeoCam.

 

23


Table of Contents

 

LOGO

Figure 1: General Location Map for the Nkamouna Project

 

24


Table of Contents

 

LOGO

Figure 2: Location of Mine Permit Boundary

 

25


Table of Contents

Environmental and Social Initiatives

GeoCam has integrated preventative engineering and mitigation strategies with respect to social and environmental programs since beginning the exploration phase of the Project. Planned mining and production related facilities use industry proven and/or laboratory-demonstrated technologies that are considered industry best practices. Also, international requirements such as Equator Principles and International Finance Corporation (IFC) Performance Standards have guided the preparation of the Environmental and Social Assessment (ESA), and activities undertaken to preserve the health and safety of the workforce and local communities.

The following are the main potential impacts of the Project:

 

   

Loss of natural flora and fauna habitats due to land clearance for mining activities and the construction of processing facilities and support infrastructure for the operations;

 

   

Alteration of land topography and form due to mining exploitation;

 

   

Increase in soil erosion due to soil grading and the construction of Project facilities;

 

   

Increase in metal and/or dissolved solid load in surface and ground water due to unexpected releases of process solutions or soil erosion;

 

   

Increase of illegal hunting activities due to population influx;

 

   

Dissemination of dust in the air due to intensive traffic of vehicles; and

 

   

Increase in job opportunities for local resident population.

Geology

Southeastern Cameroon lies within a region of metamorphosed Proterozoic rocks ranging in age from 2,500 to 600 million years (My) and extending across parts of several west-central African countries. The Cameroon laterite profiles are similar to those observed elsewhere in humid tropical environments and show a strong vertical zonation, which reflects the transition from unweathered host rock at the base, to highly leached residues at the surface. The Cameroon laterites consist of two layers of iron-rich laterite separated by an iron-rich ferricrete breccia. The laterite under the breccia includes the limonitic ferralite above saprolite zones, which are more typical of humid tropical laterite profiles.

The cobalt-nickel-manganese deposits are hosted in residual laterites formed by prolonged tropical weathering of base rock serpentinites. Large areas of mineralized laterite, each several square kilometers in extent, are included on low-relief mesas or plateaus underlain by ultramafic rocks that stand above the surrounding dissected lowlands. The Nkamouna and Mada deposits are two such plateaus. Ultramafic rocks underlie all the plateaus, with some areas of schist, phyllite, and quartzite. The surrounding lowlands are underlain by schists, phyllites, quartzites, and meta-volcanics of the Intermediate Series.

Mineralized Material

This section describes geologic modeling and estimates of mineralized material for the Nkamouna Project as described in the 2011 Technical Report.

Nkamouna/Mada Geologic Model

Total mineralized material was calculated for the Nkamouna and Mada deposits using a three-dimensional block model to estimate cobalt, nickel, and manganese grade for individual blocks with dimensions of 10 by 10-meters horizontal by 1-meter vertical. In addition, lithology codes and ore classification codes were determined for each block. Licensed geologic modeling software was used for the estimation.

Basic statistics showed that there are three cobalt grade populations, including low-grade (poorly mineralized), mid-grade (mineralized), and high-grade (strongly mineralized). Manganese was found to have

 

26


Table of Contents

grade distributions similar in shape, but higher grade than cobalt, consistent with the strong correlation between cobalt and manganese in the asbolane. Nickel appears to be more evenly distributed than cobalt and manganese and was found to have two grade zones, mid-grade (mineralized) and high-grade (strongly mineralized).

Basic statistics were run within the grade zones to confirm the grade distributions and variograms were run to confirm continuity of grades within the zones.

The Nkamouna Project mineralized material is summarized in Table 1 below. These estimates of mineralized material include the results of all exploratory drilling on the Nkamouna and Mada deposits.

Table 1

Nkamouna/Mada Mineralized Material Statement

 

           Average Grade  
     Tonnes (kt)     Co (%)      Ni (%)      Mn (%)  

Total Mineralized Material(1)

     52,467 (2)      0.19         0.64         1.18   
  

 

 

   

 

 

    

 

 

    

 

 

 

Note: Mineralized Material is not mineral reserves and does not have demonstrated economic viability.

 

(1) Reflects weighted averages of estimates prepared by SRK that were included in the 2011 Technical Report and the Feasibility Study. Those estimates included, for the Nkamouna deposits: 80,723ktonnes of ore (including the reserves described below), cobalt 0.23%, Nickel 0.67% and manganese 1.25%. For the Mada deposits, the estimates were: 39,876ktonnes of ore (also including the reserves below), cobalt 0.23%, Nickel 0.59% and manganese 1.43%. These estimates have been rounded to reflect the relative accuracy of the estimates.
(2) Reported at cut-off grades of 0.12% and 0.23% cobalt contained within ferralite and breccia, respectively. Estimated reserves for the Nkamouna Project set forth below are exclusive of in the mineralized material set forth in the above table.

Mine Plan

The mine plan for the Nkamouna Project targets mining and physical upgrading at a rate of approximately 10,000 to 20,000 tons per day using small excavators and articulated dump trucks (ADT’s). The ore will be transported from the pit face to run-of-mine (ROM) stockpiles located near the Nkamouna plant site, the southern extent of Mada and an emergency stockpile between the two. From the stockpiles, the ore will be blended to the desired feed grade and transported to a physical upgrade (PUG) plant using front-end loaders and haul trucks. Waste will be removed using bulldozers and side casting of rehandle with long boom excavators.

Reserves

The proven and probable reserves for the Nkamouna Project are summarized in Table 2.

Table 2

Nkamouna and Mada Reserves (as of December 31, 2010)(1)

 

     Ore  Tonnes
(kt)(1)
    Co Grade  (4)
(%)
     Mn  Grade(4)
(%)
     Ni  Grade(4)
(%)
 

Total Proven and Probable

     68,132 (2)(3)(5)      0.26         1.48         0.66   
  

 

 

   

 

 

    

 

 

    

 

 

 

 

(1) Reflects estimates prepared by SRK and included in the 2011 Technical Reports and the Feasibility Study. These estimates included, for ferralite ore: 57,097 ktonnes of ore, cobalt 0.23%, nickel 0.69% and manganese 1.30%; and for breccia ore: 11,035 ktonnes of ore, cobalt 0.42%, nickel 0.54% and manganese 2.37%.

 

27


Table of Contents
(2) Reserves are based on an assumed cobalt price of US$57,761/ton (US$26.20/lb), nickel price of US$19,208/ton (US$8.713/lb) and a manganese carbonate price of US$1,360/ton (US$0.544/lb). Cobalt and nickel prices reflect the three-year average prices for the period ending December 31, 2010, the last date used in the Feasibility Study. Manganese carbonate prices were assumed at 40% of the US$3,000/ton current price for manganese. Full mining Recovery is assumed. Mine reserves are not diluted. These estimates have been rounded to reflect the relative accuracy of the estimates.
(3) Cut-off grades are not representative of internal or break-even calculations but rather stockpile grade bin classification above 0.12% Co for ferralite and 0.2% Co for breccia.
(4) In-situ grade does not reflect the average metallurgical recovery of 58.66% cobalt, 16.43% nickel and 53.06% manganese.
(5) Reserves shown represent 100% interest of the GeoCam’s Nkamouna Project. The Company holds 60.5% of GeoCam.

Ore tonnes which lie within the final pit design shape are classified as proven or probable reserves based on the geological classification for measured and indicated resources. Proven reserves are measured resources within the design pit shape and probable reserves are indicated resources within the design pit shape. Inferred material which lies within the pit design is not included in the reserve statement and is treated as waste. Ore reserves are based on the economic balance between the value per tonne of run-of-mine rock against the costs to mine and process each tonne. The value is based on estimated metal concentration, estimated metal value and process recovery. The costs include mining, processing, overhead and rehabilitation.

For the Nkamouna and Mada deposits, a variable cut-off grade strategy was designed to accelerate the mining of the deposit early in the mine life but still provide adequate stockpile storage for a twenty one year process life. As such, the true definition of economic value for a block model block was not used as the differentiation of ore and waste. This is possible given the large quantum of potential resource, i.e. not reserve limited (within the mining region) and strategic planning decisions governing mine cash flow.

Metallurgy

The metallurgical evaluation centered on the selected process flow sheet and the objective was to establish the design parameters in order to engineer the selected process. This was achieved by conducting small-scale batch experiments for each of the unit processes followed by combination of the unit processes in continuous pilot scale testing campaigns.

The extensive test work provided confirmation of the selected metallurgical process flow sheet and acceptable recoveries and product qualities were achieved during the continuous pilot plant campaigns at expected reagent consumption levels.

The metallurgical evaluation provided all the required data to design the process plant and auxiliaries. The reagent consumptions for the operating cost estimates were derived from the metallurgical test work campaigns.

Process and Plant

The process plant will consist of two process circuits, namely the physical upgrade (PUG) circuit, more commonly known as a wash plant, and the leach and recovery circuit.

Physical Upgrade Circuit

The objective of the planned physical upgrade (PUG) circuit is to remove most of the non-economic material, thereby significantly reducing the throughput of the leach and recovery circuit. This is generally achieved by selectively recovering the asbolane from the gangue material based on the physical characteristics of the harder, coarser and denser cobalt, nickel and manganese-bearing asbolane, compared to the finer, more friable gangue material.

 

28


Table of Contents

Leach and Recovery Circuit

The objective of the leach and recovery circuit will be to recover cobalt and nickel as a mixed sulfide product and manganese as a manganese carbonate product from the PUG concentrate. The steps of the individual sub-circuits within the planned leach and recovery circuit are presented in the table below.

The steps and objectives of the Leach and Recovery Circuit

 

Sub Circuit

  

Objective

Concentrate grinding    To grind the PUG concentrate in an open circuit configuration to a very fine product size
Leach    To leach cobalt, nickel and manganese from the PUG concentrate
Primary purification    To precipitate iron and aluminum from the pregnant leach solution (PLS)
Counter current decantation (CCD)    To recover leach solution containing cobalt, nickel and manganese from barren solids
CCD tailings processing    To collect and pump tailings to CCD tailings facility
Leach and purification area scrubber    To scrub off-gasses from the leach and primary purification tanks
Secondary purification   

To precipitate more iron and aluminum from the PLS stream

To remove precipitated Fe and Al from the PLS stream

Sulfide precipitation   

To precipitate cobalt and nickel from the PLS as a mixed sulfide

To recover the precipitated sulfide from the barren stream

To filter and wash and package the mixed sulfide product to remove entrained process solution from the sulfide product

Tertiary purification   

To precipitate the remaining iron and aluminum from the PLS stream

To remove the precipitated iron and aluminum from the PLS stream

Manganese carbonate precipitation -1   

To precipitate 95% of the leached manganese as manganese carbonate

To remove the precipitated manganese carbonate product from the solution

To filter and wash and package the manganese carbonate product

Manganese carbonate precipitation -2   

To precipitate the remaining 5% of the leached manganese as manganese carbonate

To remove the precipitated manganese carbonate product from the solution

To filter the manganese carbonate precipitate

Tailings Storage Facilities

The Tailings Storage Facilities (TSFs) will provide separate storage for PUG tailings and CCD tailings. The TSFs will be built within the Napene Creek drainage basin and immediately to its north. Stored tailings will essentially fill the upper end of the Napene Creek basin. The location reduces offsite run-on to the facilities thus limiting the need to handle excess waters over the Project.

Feasibility Study

The Feasibility Study was initiated in early 2010 and completed and accepted in April 2011 for a total cost in excess of $10.7 million paid to the report preparer, Lycopodium, and a number of other contractors and consultants associated with its completion. Among other conclusions, the Feasibility Study found that the Nkamouna Project is feasible with an estimated net present value at an 8% discount rate of approximately $669 million ($405 million net to Geovic’s 60.5% interest) over a 23 year Project life, on total free cash flow (before debt service) of $2.1 billion during that period. These estimates were made using three year average prices as of December 31, 2010 for cobalt and nickel and current market prices as of that date for manganese carbonate. The Feasibility Study also estimated initial capital and start-up expenditures of approximately $617 million (including 10% contingency).

 

29


Table of Contents

Markets and Metal Prices

Cobalt is a metal used in many diverse industrial and military applications with the leading uses in rechargeable batteries (approximately 21 percent) and super-alloys (approximately 20 percent) principally for gas turbine engines. Cobalt is also used to make specialty magnets (7 percent); other alloys used for corrosion and wear resistance (16 percent); catalysts for the petroleum and chemical industries (11 percent); drying agents for paints, varnishes, and inks and adhesives for radial tires (9.5 percent); porcelain enamels, dyes and pigments (11 percent); and magnetic recording media (4.5 percent).

Cobalt prices are published by Metal Bulletin (www.metalbulletin.com). Commencing February 22, 2010, cobalt began trading on the London Metal Exchange (LME). Nickel is a principal metal also traded on the LME and has total price transparency. Prices are quoted on the LME (www.lme.com) for 99.8 percent US Spot cathode nickel and cobalt. The Nkamouna Project will produce a cobalt-nickel mixed sulfide product and a magnesium carbonate product. Both products will likely be sold at prices slightly less than the pure metal.

The following table reflects the reported annual spot prices for high-grade cobalt and nickel as reported by Metal Bulletin for Cobalt for 2007-2010 and London Metals Exchange for nickel for each of the last five years and for cobalt in 2011, and the last reported prices for 2011.

 

     Year end
2011
     Average Annual Prices  
         2011      2010      2009      2008      2007  

Price per pound cobalt

   $ 14.70       $ 17.47       $ 21.32       $ 17.88       $ 39.41       $ 29.94   

Price per pound nickel

   $ 8.32       $ 10.38       $ 9.89       $ 6.64       $ 9.57       $ 16.88   

Other Mining Leases and Claims

We are also engaged in the strategic acquisition, exploration and development of other mineral properties to diversify our portfolio of mineral exploration and development opportunities. To that end we actively leased mineral properties, permitted properties and staked mining claims as described below.

New Caledonia Properties

In 2009 we formed a subsidiary in New Caledonia, a French overseas island (collectivity) northeast of Australia in the South Pacific, to explore for chromite. Prospecting licenses covering up to 120 square kilometers were issued by the government. Once the licenses were issued Geovic collected and analyzed more than 400 surface mineral samples and ranked the prospects according to development potential. The onshore prospecting program resulted in the discovery of several potentially large tonnage high-grade chromite accumulations. The subsidiary applied for, and in early 2011 was awarded, 31 exploration licenses covering 100 square kilometers. Figure 3 shows the location of these licensed areas.

 

 

30


Table of Contents

LOGO

Figure 3 Exploration Licenses

Environmental baseline studies were conducted within each license area in 2011 to establish site-specific exploration impacts and mitigation requirements prior to drilling. Subsequently, following regulatory approval to commence exploration (some approvals received in first quarter 2012; balance are expected in 2012), onshore and offshore drill campaigns are planned to assess the quality and extent of chromite deposits on the licensed areas. The initial drilling program is targeted to commence in the second half of 2012, and continue as cash resources are available. We anticipate that initial estimates of mineralized material will be made in late 2012 or early 2013.

The chromite prospects of interest to Geovic occur in unconsolidated coastal sand deposits, some very remote, where chromite has been separated from ultramafic host rock, and concentrated with other heavy minerals by river and wave action. This has resulted in well-sorted deposits occurring as dark bands of heavy mineral sand up to several meters thick near the mouths of large river systems and along nearby beaches and back-beach areas.

Based on preliminary testing of bulk samples collected under the prospecting licenses, Geovic believes that the chromite sands can be readily separated from the rest of the heavy mineral sand.

 

31


Table of Contents

As of March 1, 2012 we hold the following exploration licenses in New Caledonia:

New Caledonia—Exploration Licenses

 

Province

   Licenses      Acres (gross)      Sq km (gross)  

North

     12         9,884         40   

South

     19         14,827         60   
  

 

 

    

 

 

    

 

 

 

Total

     31         24,711         100   
  

 

 

    

 

 

    

 

 

 

Arizona Properties

Geovic conducted a surficial sampling survey from 2009 through 2011 within state mining leases and federal mining claims we hold in the Whetstone Mountains in southeastern Arizona. During the sampling program, Geovic discovered surface gold mineralization discontinuously along a nine-mile trend, in what appears to be a hot springs, quartz-hosted, micro-fine gold mineralization in regional detachment faults. Such settings are often sites for hosting shallow, bulk-tonnage disseminated gold deposits.

The gold identified to date is recognized as a high level, low temperature gold-arsenic-antimony-mercury assemblage of near surface emplacement. The mineralization is closely associated with extensive silica flooding and veining and related clay alteration and replacement of sediments, volcanics, and older basement rocks.

Based on this early exploration, the Company sought additional state leases and established additional federal mining claims in the area, and now holds over 48 square miles of surface prospects. Figure 4 show the location of these areas. We expect to further explore these areas in 2012.

 

32


Table of Contents

 

LOGO

Figure 4. Arizona Prospect Acreage

 

33


Table of Contents

As of March 1, 2012 we hold the following undeveloped interest in the following properties in Arizona:

Undeveloped Arizona Prospects

Whetstone Project

 

    

Number

   Gross and Net Acres  

Federal Mining Claims

   37      764   

State Mineral Exploration Permits

   54      30,178   

Colorado/Wyoming Properties

We also hold fee mineral leases over known uranium deposits in the Denver-Cheyenne Basin of northeastern Colorado and southeastern Wyoming. These mineral leases cover acreage believed to host historical uranium deposits at depths ranging from 120 feet to 600 feet below the surface. These deposits were evaluated by other operators in the 1970s and 1980s, including PowerCo, AMAX, Wyoming Minerals and Unocal. Through the leases it now holds, Geovic Energy has control over certain historically identified mineralized areas within eastern Weld County, Colorado and Goshen County, Wyoming.

As of March 1, 2012 we hold undeveloped interests in the following properties in Colorado and Wyoming:

Undeveloped Uranium Prospects

Denver-Cheyenne Basin

 

     Number of Federal
Claim-BLM
   Number of
Leases
   Gross
Acres
   Net
Acres
   County

Mineral Exploration Permits and Leases

   22       12,240    12,240    Weld County, CO

Mineral Fee Leases

      121    57,508    16,557    Weld County, CO

Mineral Fee Leases

      85    95,227    46,940    Goshen County, WY

Federal Mining Claims

   54       1,115    1,115    Goshen County, WY

We are now holding these properties for possible sale to third parties as we do not expect to further explore or develop these properties at this time.

New Mexico Properties

In 2010 we staked federal mining claims in an area where a prospecting survey showed a potential for recoverable zirconium and certain advanced metals. Our Cornudas Mountain project in southern Otero County, New Mexico is located near the Texas – New Mexico border about 90 miles northeast of El Paso, Texas. The advanced metal suite includes zirconium-hafnium; tantalum-tin-niobium; and yttrium-advanced metals. Detailed surface geologic mapping and sampling have confirmed the geological potential of the higher grade resource areas and limited low-impact exploratory drilling has been carried out to further assess that potential. Additional exploration may be warranted. Some of the mining claims are in an area designated by the BLM as an “Area of Critical Environmental Concern.” Our exploration or development of the prospect areas may be restricted by these or other environmental concerns.

If our prospect evaluation is successful we envisage development as a small-scale, low impact, high value operation due to the combined metal dollar value of the mineral concentrate, and the apparent relative ease of recovery. The suite of advanced metal elements being sought have experienced increases in value due to limited supplies and accelerated demand in the high tech industrial sector. We intend to establish additional claims in the area to provide better coverage of the potentially mineralized area, and to further explore these claims in late 2012, depending on our level of available exploration funding.

 

34


Table of Contents

As of March 1, 2012 we hold undeveloped interests in the following mining claims in New Mexico:

Undeveloped New Mexico Prospects

Cornudas Project

 

     Number of Federal Claims-BLM      Gross and Net Acres  

Mining Claims-Undeveloped

     196         4,049   

California Properties

In 2011 we staked 100 federal mining claims in an area where prospecting surveys showed potential for recoverable yttrium and associated rare earth elements. The occurrences are located south of Twentynine Palms California. We have conducted no exploration activities on this prospect.

Undeveloped California Prospects

Music Valley Project

 

     Number of Federal Claim-BLM      Gross and Net Acres  

Mining Claims-Undeveloped

     100         2,066   

Papua New Guinea

In March 2012 the Company was notified by the Mineral Resources Authority of the government of Papua New Guinea that the Company has been awarded a two-year exploration license pursuant to applications filed by the Company in 2011. Earlier visits to the areas included in the license indicated possible deposits of advanced and specialty metals. No exploration has been undertaken by the Company as of the date of this report.

 

35


Table of Contents
ITEM 3. LEGAL PROCEEDINGS

In November 2009, five management level consultants or employees of GeoCam filed lawsuits against GeoCam in Cameroon, claiming approximately $2.2 million as compensation and damages as a result of termination of their services by GeoCam in connection with a reduction in workforce in February and March 2009. In April 2010 the litigation was dismissed. In July 2010 the litigation was re-filed in other jurisdictions and, on June 3, 2011, the High Court of Abong-Mbang before which four of the matters were pending entered judgments in favor of the four claimants totaling CFA 780,339,500 (approximately $1.6 million at December 31, 2011). On November 14, 2011, the High Court of Mfoundi, Yaoundé before which the fifth matter was pending entered a judgment in favor of the claimant totaling CFA 118,804,219 (approximately $0.24 million at December 31, 2011). GeoCam has filed appeals with the Court of Appeal of the Court of Appeal East Region at Bertoua in the four matters and to the Court of Appeal of the Center Region at Yaoundé in the fifth matter. These appeals stayed enforcement of the judgments pending resolution of the appeals. The Company believes all contractual and other obligations to the individuals were satisfied at the time of termination and that the appeals will ultimately be resolved favorable to GeoCam. GeoCam intends to vigorously defend its position throughout the appellate process.

Executive Officers

The following table sets forth certain information, as of March 22, 2012, with respect to our executive officers.

 

Name

   Age     

Position

Michael T. Mason(1)

     67       Chairman, Chief Executive Officer

Barbara A. Filas(2)

     56       President

John E. Sherborne(3)

     67       Executive Vice President

William A. Buckovic(4)

     62       Director, Executive Vice President, President of Geovic Ltd.

Greg C. Hill(5)

     62       Executive Vice President, Chief Financial Officer

Gary R. Morris(6)

     67       Senior Vice President, President of Geovic Mineral Sands

Alan W. Peryam(7)

     66       Senior Vice President, General Counsel

Shelia I. Short(8)

     60       Corporate Secretary

Phillip R. Mason(9)

     52       General Manager of Geovic Cameroon, PLC

Brian C. Mazeski(10)

     39       Controller, Principal Accounting Officer

Timothy D. Arnold(11)

     55       Chief Operating Officer

 

(1) Mr. Michael Mason has been Chief Executive Officer since January 21, 2011 and Chairman of the Board of Directors since February 14, 2012. He has been Managing Partner and owner of Mineral Services, LLC, a metals marketing consulting firm, from 1996 to the present. Mr. Mason was a Director of ECU Silver Mining Inc. from April 2001 until its merger with Golden Minerals Corp. in August 2011, and has been a director of Golden Minerals Corp. since that time.
(2) Ms. Filas has been President since January 21, 2011. She was previously Senior Vice President, Corporate Development from February 2009 until June 2009, when she was appointed Executive Vice President and Chief Administrative Officer. Prior to joining the Company, Ms. Filas was the President of Knight Piésold and Co., a privately held Colorado corporation that provides civil, geotechnical and environmental engineering consulting services to the mining industry, including the Company. In her 30 year career, she has held engineering and environmental positions in consulting and with operating mining companies.
(3)

Mr. Sherborne was President, New Ventures division from January 2011 through February 14, 2012, and Chief Executive Officer from March 2004 until January 21, 2011. He joined Geovic, Ltd., the Company’s present subsidiary, as Executive Vice President, Corporate Development in 2002 and was previously a

 

36


Table of Contents
  consultant to Geovic. He was appointed as CEO of Geovic in March 2004 and Chairman in August 2004. He was Chief Executive Officer of the Company from December 2006 until January 2011. He has held senior management positions in international energy and mineral resources businesses for more than 30 years before joining Geovic. Mr. Sherborne will retire March 30, 2012.
(4) Mr. Buckovic is the founder and was President of Geovic Ltd. from 1994 until 2009, and presently is Executive Vice President of the Company and Geovic Ltd. He became President of the Company upon completion of the RTO in December 2006, and Executive Vice President in 2009. Mr. Buckovic has been active for over 37 years in the mineral exploration and development business, including the discovery of several major mineral deposits.
(5) Mr. Hill has been Executive Vice President and Chief Financial Officer since January 1, 2010, and was Senior Vice President and CFO for Geovic, Ltd. and the Company from October 2007 until December 2009, and he was Acting CFO of Geovic, Ltd. from August 2006 and for the Company from December 1, 2006 until October 2007. Mr. Hill has also been the President of Englewood Capital, LLC, a private consulting company since November 2001.
(6) Mr. Morris has been Senior Vice President, Geovic Ltd. since January 2001 and Senior Vice President of the Company since December 1, 2006. Mr. Morris was Managing Director of Geovic Cameroon PLC through May, 2008 and Chairman of the Board of Geovic Cameroon PLC until February 17, 2009.
(7) Mr. Peryam has been Senior Vice President and General Counsel of Geovic Mining Corp. since October 2008. From June 1, 2007 to December 31, 2008 he was the owner of Alan Peryam LLC and of counsel to the law firm of Zupkus & Angell P.C. From 1974 through May 31, 2007 Mr. Peryam was in private practice of law in Denver, Colorado.
(8) Ms. Short has been Corporate Secretary since December 1, 2006 and Executive Assistant and Secretary of Geovic, Ltd. since July 2000.
(9) Mr. Phillip Mason has been Managing Director of Geovic Cameroon PLC since September 1, 2010. He has over 30 years mining management experience, 20 of which have been in rural African mining environments. Prior to joining GeoCam, Mr. Mason was Managing Director for IGE Resources in Angola from 2009-2010; Country Manager for Amoriholdings in the Democratic Republic of Congo from 2006 until 2009; Operations Director for Sengaminees Amari from 2005 to 2006, and Chief Engineer for ITM Mining in Angola from 2002 until 2005.
(10) Mr. Mazeski has been Controller since April 11, 2011. Mr. Mazeski was previously controller of Uranium One Americas Inc., a multinational mining company, from May 2006 until April 2011, corporate controller of Evergreen Energy Inc., of Denver Colorado, a small public company involved in clean coal technology, from May 2006 until 2008, and controller for Rentech, Inc., of Denver Colorado, a public company involved in clean energy solutions, from 2004 through 2006. Mr. Mazeski also worked as a senior audit associate in a large public accounting firm from 1996 to 2001.
(11) Mr. Arnold has been Chief Operating Officer since January 21, 2011. He was Manager of the Mt. Hope and Liberty molybdenum projects for General Moly Inc. in Elko Nevada from 2008 until joining the Company. Between 2001 and 2008, He was Vice President and General Manager for Coeur d’Alene Mines at its Kensington Mine (Coeur Alaska Inc.) and Rochester Mine (Coeur Rochester, Inc.).

 

ITEM 4. MINE SAFETY DISCLOSURES

Pursuant to Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act and Item 104 of Regulation S-K, issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States are required to disclose in their annual reports filed with the SEC information regarding specified health and safety violations, orders and citations, related assessments and legal actions, and mining-related fatalities. During the fiscal year ended December 31, 2011, our U.S. exploration properties were not subject to regulation by the Federal Mine Safety and Health Administration under the Federal Mine Safety and Health Act of 1977.

 

37


Table of Contents

PART II

 

ITEM 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

Price Range of Common Shares

Our Common Stock, $.0001 par value per share, is traded in the over-the-counter bulletin board (“OTC-BB”) under the symbol: “GVCM” and on the Toronto Stock Exchange (“TSX”) under the symbol GMC. Our stock is not traded or quoted on any automated quotation system. The following table sets out the reported high and low closing prices on the TSX and high and low bid prices on the OTC-BB for the periods indicated as reported by the OTC-BB and TSX.

 

          OTC-BB
(US$)
     Toronto Stock Exchange
(CDN$)
 
          High      Low      High      Low  

2012

   1st quarter (through March 22, 2012)      0.20         0.13         0.21         0.14   

2011

   4th quarter      0.32         0.15         0.32         0.145   
   3rd quarter      0.41         0.20         0.375         0.21   
   2nd quarter      0.73         0.31         0.69         0.31   
   1st quarter      0.74         0.42         0.75         0.42   

2010

   4th quarter      0.98         0.62         0.99         0.65   
   3rd quarter      0.81         0.55         0.83         0.58   
   2nd quarter      0.89         0.55         0.89         0.60   
   1st quarter      0.93         0.64         0.97         0.66   

On March 22, 2012, the last reported sale price of our Common Stock on the OTC-BB was $0.14 and on the TSX was Cdn $0.14. As of March 22, 2012, there were 106,639,602 shares issued and outstanding, and we had approximately 420 registered stockholders of record.

Dividends

We have never paid dividends. While any future dividends will be determined by our Board of Directors after consideration of earnings, financial condition and other relevant factors, it is currently expected that any available cash resources will be utilized in connection with our ongoing business operations.

Price Range of Warrants

We have one remaining class of outstanding publicly traded warrants, traded on the Toronto Stock Exchange. We issued 2,999,996 warrants December 1, 2006 all of which expired November 30, 2011, 10,800,000 warrants March 7, 2007, which expired March 6, 2012 and 4,792,100 warrants in connection with an offering completed April 27, 2007 which will expire April 26, 2012 (“GMC.WT.B”). The outstanding warrants have an exercise price of Cdn$5.00 per share. The following table sets out the reported high and low closing sales prices for the outstanding warrants for the last two fiscal years, as reported by the TSX.

 

Series and Year

         (Cdn$)  
           High      Low  

Warrant GMC.WT.B

        

2012

   1st quarter (as of March 22, 2012)      na         na   

2011

   1st quarter      0.020         0.005   
   2nd quarter      na         na   
   3rd quarter      0.015         0.005   
   4th quarter      0.005         0.005   

2010

   1st quarter      0.04         0.01   
   2nd quarter      0.03         0.005   
   3rd quarter      0.09         0.01   
   4th quarter      0.12         0.035   

 

38


Table of Contents

On March 22, 2012, the last reported sale prices of Warrant GMC.WT.B was Cdn$0.005. On that date there were outstanding 4,792,100 Warrants.

Transfer Agent for Shares and Warrants

The registrar and transfer agent for the Company’s Common Stock is Computershare Trust Company Inc., 250 Royall Street, Canton, Massachusetts 02021 and Computershare Trust Company of Canada, 100 University Avenue, 9th Floor, Toronto, Ontario, Canada MSJ 2Y1 is co-transfer agent. The registrar and transfer agent for the warrants is Computershare Trust Company of Canada, 2nd floor, 510 Burrard Street, Vancouver, British Columbia, V6C 3B9.

Performance Chart

The following chart compares the total cumulative Stockholder return, assuming dividend reinvestment, for C$100 invested in shares of Geovic Mining Corp. on December 31, 2006 with the cumulative total return, assuming dividend reinvestment, of the S&P/TSX Composite Index and the S&P TSX Global Mining Index for the period from December 31, 2006 to December 31, 2011. The historic performance of the share price, as set out in the graph, does not necessarily indicate future price performance.

 

LOGO

 

    Dec. 31/2006     Dec. 31/2007     Dec. 31/2008     Dec. 31/2009     Dec. 31/2010     Dec. 31/2011  

Value based on $100 invested in Geovic Mining Corp.

  $ 100        63.77        18.87        24.15        27.17        6.42   

Value based on $100 invested in S&P/TSX Composite

  $ 100        107.16        69.63        91.00        104.14        92.61   

Value based on $100 invested in S&P/TSX Global Mining Index

    N/A   $ 100        60.29        91.97        115.68        85.48   

 

* Index has only been in existence since June 2007

Note: All figures in this table are in Canadian dollars. At March 22, 2012, the exchange rate quoted by Oanda Corporation (www.oanda.com), was $1.00 to C$0.99.

 

39


Table of Contents
ITEM 6. SELECTED FINANCIAL DATA

Set forth below is selected consolidated financial information for each of the five years ended December 31, 2007 through 2011. We selected the balance sheet data and statement of operations information for the five years from our audited financial statements.

You should read the information presented below in conjunction with “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and our Consolidated Financial Statements and related notes included elsewhere in this Report.

Selected Financial Data

(in thousands, except per share amounts)

 

     Year Ended December 31,  
     2011     2010     2009     2008     2007  

Statement of Operations Data

          

Exploration costs

   $ 10,894      $ 16,299      $ 10,966      $ 27,464      $ 9,189   

General and administrative

     7,154        7,798        8,236        6,382        3,276   

Stock based compensation

     729        784        972        2,466        2,111   

Change in fair value of warrants

     (129     (662     116        —          —     

Interest and bank charges

     37        60        55        152        59   

Depreciation

     936        895        734        244        76   

Mineral property impairment

     —          —          —          3,244        —     

Interest income

     (57     (6     (112     (1,132     (3,235

Other income

     (864     —          —          —          —     

Income tax expense (benefit)

     —          —          (75     (436     (414

Consolidated net loss

     (18,767     (25,168     (20,892     (38,384     (11,062

Net loss attributed to noncontrolling interest

     (3,949     (6,884     (4,601     (11,501     (3,214

Net loss attributed to Geovic stockholders

     (14,818     (18,284     (16,291     (26,883     (7,848

Weighted average outstanding shares

     104,964        103,829        103,016        102,399        92,047   

Loss per share

     (0.14     (0.18     (0.16     (0.26     (0.09

Balance sheet data (end of period):

          

Cash and cash equivalents

     15,554        32,383        49,153        64,184        78,479   

Total assets

     19,860        36,942        54,129        70,524        82,936   

Total liabilities

     2,248        4,668        5,224        6,351        1,794   

Stockholders’ equity

     7,666        21,617        39,040        55,029        79,264   

Summary of Quarterly Results

The table below sets forth quarterly results for the eight quarters ending December 31, 2011:

 

    2011     2010  
    Fourth     Third     Second     First     Fourth     Third     Second     First  

Exploration costs

  $ 2,401      $ 2,878      $ 2,925      $ 2,690      $ 5,151      $ 4,256      $ 4,379      $ 2,513   

General and administrative

    1,613        1,830        1,887        1,824        2,476        1,674        1,923        1,725   

Stock based compensation

    (18     174        177        396        72        121        154        437   

Change in fair value of warrants

    —          —          (2     (127     (73     30        (347     (272

Interest and bank charges

    7        8        9        13        16        17        15        12   

Depreciation

    233        233        248        222        234        220        217        224   

Interest income

    (9     (20     (18     (10     (2     (2     (1     (1

Income tax expense (benefit)

    —          —          —          —          —          —          —          —     

Net loss attributed to noncontrolling interest

    (842     (897     (1,131     (1,079     (2,167     (1,742     (1,890     (1,085

Net loss attributed to Geovic stockholders

    (2,853     (3,868     (4,093     (4,004     (5,707     (4,574     (4,450     (3,553

Loss per share

    (0.03     (0.04     (0.04     (0.04     (0.05     (0.04     (0.04     (0.03

 

40


Table of Contents
ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Overview

This Management’s Discussion and Analysis (“MD&A”) is intended to provide an analysis of our capital resources and liquidity at year end 2011, and financial results for the years ended December 31, 2011 and 2010 compared to previous years. All amounts are presented in United States dollars unless indicated otherwise. Reference should also be made to the financial statements and related notes and other information appearing elsewhere in this report, and the Company’s other disclosure materials filed from time to time on www.sec.gov and the Company’s website at www.geovic.net. As used in this report, unless the context otherwise indicates, references to “we”, “our”, “ours” and “us” refer to Geovic Mining Corp. and its subsidiaries collectively.

Business

We are engaged in the business of planning to develop a cobalt, nickel, and manganese mining project in Cameroon through GeoCam, our majority-owned (60.5%) subsidiary incorporated under the laws of the Republic of Cameroon. We also explore for exploitable deposits of other minerals. We hold the following early stage exploration prospects: exploration licenses in New Caledonia (chromite); state exploration permits in Arizona (gold); mineral leases and mining claims in Colorado and Wyoming (uranium); mining claims in New Mexico and California (rare earth and other specialty metals); and an exploration license in Papua New Guinea (advanced and specialty metals).

Our future success will be largely dependent on mining and processing the reserves in the Nkamouna Project or selling some or all of our interest in the Project. We do not have available financial resources necessary to construct and open the mine and we are actively seeking third party sources of funding. A feasibility study we initiated for the Nkamouna Project in December 2009 was completed in April 2011. The feasibility study estimates approximately $617 million of initial capital costs, including contingencies, to construct and start-up the Project. The GeoCam financial advisor estimates that the total of capital, financing, working capital, contingency and start-up costs will be approximately $698 million, based on estimates included in the feasibility study. Additionally, cost overrun requirements of lenders to the project are estimated to be approximately $100 million.

Since the feasibility study was completed, we have devoted most of our efforts to seeking and evaluating a means to finance the Nkamouna Project. We have considered many possible alternatives, and we continue to focus our attention on joint ventures or similar arrangements, including a sale of a significant portion or all of our interest in the Project, with one or more strategic investors who would agree to assist in financing and to purchase much of the cobalt, nickel and manganese products from the Project. We have had active negotiations with large state-owned companies in two Asian countries during 2011. Another option being considered is more conventional project debt and equity financing arrangements under which we would be required to raise significant amounts of equity, although this option is unlikely to be achieved.

We also face other significant issues affecting development and operation of the Nkamouna Project, such as operating the Project through GeoCam as an autonomous Cameroonian entity, GeoCam’s ability to recruit, train and retain a qualified and stable local workforce and mining professionals to manage its development, construction and operation, and the logistical challenges of operating the Project in a relatively undeveloped, remote area in Cameroon.

We are the majority shareholder of GeoCam. We generally do not take major strategic actions at GeoCam without general concurrence by the other shareholders who are collectively represented by SNI. We view a good working relationship with the other shareholders of GeoCam as fundamental to the future success of the Nkamouna Project. Under the Shareholder Agreement GeoCam is operated as an autonomous entity and we select three of the five GeoCam directors and two directors are selected by the other shareholders.

 

41


Table of Contents

We are seeking to 1) realize value for the Cameroonian assets and 2) shift the Company’s focus to a prospect generation and strategic investment business model in 2012 and beyond. Since our position in GeoCam will likely be significantly diminished or completely eliminated through strategic investment upon completion of a financing transaction, the future direction for the Company will be to identify new exploration prospects, minimally develop and prioritize existing and new prospects, and sell or joint venture further exploration and development of those prospects to others. The Company expects to take prospects to a level where they can be timely monetized through strategic investments by others who have the resources and staying ability to complete advanced exploration, permitting and development.

Capital Resources and Liquidity

Our cash resources and ability to access additional financing will be critical to our financial condition until we begin to receive operating revenue. Spending activity for the Nkamouna Project since late 2010 has been mostly limited to expenditures to independently confirm the feasibility of the Project, to enhance the likely development of the Nkamouna Project, to reduce process risk and to prepare for future financing. We plan to continue this approach until we are reasonably satisfied that Nkamouna Project financing in required amounts can be secured.

At December 31, 2011 we had approximately $15.6 million of cash and cash equivalents on a consolidated basis compared to $32.4 million at December 31, 2010, a decrease of approximately $16.8 million. Our cash is invested in U.S. dollar deposits and highly liquid money market funds and in the Cameroon branch of a large international bank.

New mining projects such as the Nkamouna Project are typically financed using a combination of debt secured by the project and owners’ equity. Our plan has been to attempt to finance the capital costs, startup expenses and financing costs of the Project in such a manner. In conventional project debt financing, GeoCam would be required to furnish, as equity, more than 40% of the total estimated costs for the Nkamouna Project as a condition to securing loans for the balance of the costs. GeoCam’s financial advisor has estimated that our share of GeoCam equity to complete such debt financing for the Project would be approximately $225 million, which reflects the amount of equity capital we would be required to contribute to GeoCam as a condition to debt financing.

With our assistance, GeoCam engaged a large international bank as its financial advisor in August 2010. In early 2011 we engaged a large multi-national investment banking firm as financial advisor to advise and assist the Company in discussions with strategic partners for the Nkamouna Project and to review financing alternatives and our equity requirements in connection with financing the Project. Monthly advisor fees to both advisors were suspended indefinitely as of March 1, 2012.

Based on the estimated capital and start-up costs of the Nkamouna Project, we presently do not have sufficient capital resources available to meet anticipated equity requirements. Our ability to raise additional capital for this purpose would depend on a number of factors, many of which are partly or wholly outside of our control, including the state of world-wide financial, commodity and other markets, the market trading price of our common stock and demand for future access to the cobalt resources in the Nkamouna Project.

During 2010 and through the present, we have met with various large international businesses with respect to the potential purchase of future off-take from, and possible investment in, the Nkamouna Project. The Company and the other GeoCam shareholders have continued to discuss possible strategic investment arrangements with several large Asian companies, and during the third quarter through the present we have negotiated with state owned companies in Asia. These discussions could lead to proposals under which the strategic investor would acquire a large interest in GeoCam or in the Nkamouna Project directly, for cash, and would assist GeoCam to raise the additional required funding to construct the Nkamouna Project and the investor would gain preferred access to Project offtake. Any such cash paid by the strategic investor for our interest could

 

42


Table of Contents

be available to fund all or a portion of our remaining project equity requirements. Under such an arrangement our interest in the Nkamouna Project would be reduced, perhaps significantly, or eliminated. As of the date of this Report, no such proposal has been finalized.

We are also discussing other arrangements, including direct placement of our equity securities in private transactions with third parties, and a transfer of some or all of our ownership of GeoCam to one or more investors. Terms of any equity financing by the Company, if available, would be dilutive to our present stockholders.

We are currently investigating all strategic alternatives available to us. If we are unable to raise our share of equity required as a condition to Project debt financing or secure a strategic investment by another qualified party, construction of the Nkamouna Project would be delayed.

We do not anticipate generating operating revenue until operations at the Nkamouna Project begin, which could be at least three years after completion of required financing arrangements. If we are successful in selling some or all of our interest in the Project to a third party, our future requirement to fund GeoCam and Project construction would be reduced. Some or all of the proceeds from such a sale could be available for other purposes. We believe that our cash resources will satisfy our capital and liquidity requirements for pre-construction operations and other Company expenses into the second quarter of 2013, depending on GeoCam’s level of activity. The GeoCam pre-construction cash expenditures are presently expected to total approximately $3.6 million for 2012.

GeoCam’s operating expenses are paid through capital increases approved by the shareholders of GeoCam and funded in accordance with the respective ownership interests prior to the capital increase. We will be obligated to fund 60.5% of future GeoCam capital increases. We anticipate further capital increases at GeoCam during 2012, and that approximately $2.1 million of our available cash will be used during 2012 to pay our share of pre-construction operating expenses in Cameroon.

We expect our 2012 general and administrative expenses to total approximately $6.5 million, not including any transaction costs related to a potential sale of some or all of our interest in the Nkamouna Project. We also expect to spend up to $2.1 million for exploration of mineral properties, or investment in other resource entities, in the United States and elsewhere. We expect that a significant portion of our cash resources will be expended or committed for these purposes through early 2013 or later and that our cash balances will continue to decrease from quarter to quarter. Based on our current planned 2012 expenditures, we anticipate that our 2012 year end consolidated cash and cash equivalents will be approximately $3 to $4 million.

We expect that we will work with the other shareholders of GeoCam to reach an agreement with a third party on financing transactions for the Nkamouna Project in mid to late 2012. We have budgeted a lower level of general and administrative and operating expenditures for 2012 to reflect our lower liquidity and relatively limited cash. We have also identified other areas where we can further reduce our expenses during the last half of 2012 if we have not progressed toward financing the Nkamouna Project or selling some or all of our interest in the Project by mid-year. We have taken these steps with a view to assuring that our cash resources will satisfy our cash requirements into the second quarter of 2013.

Management and the Board of Directors have already begun to implement a number of cash conservation strategies for the Company and GeoCam. The most significant cost reductions compared to previous years is our reduction of expenditures at GeoCam. With the completion of the Feasibility Study in 2011, GeoCam no longer incurs the significant costs of technical evaluations, consultant and testing fees and travel that contributed to that study. We have since reduced Project expenses to incur only necessary expenditures, primarily limited to securing the site, reclaiming exploration disturbances, environmental monitoring, and supporting potential financial and strategic investor due diligence efforts. This has significantly reduced the anticipated level of GeoCam cash requirements for 2012.

 

43


Table of Contents

In addition, we reduced the size of our Board of Directors to five persons, eliminated two consulting positions, agreed with a financial advisor to discontinue its services at least until a financing transaction is underway, eliminated much of our mineral and corporate marketing activities and limited travel and office expenses. A senior executive is retiring and we are looking to amicably reduce certain other financial obligations that are subject to contractual obligations through negotiations and mutually acceptable resolution. Finally we have decided to defer most exploration activities planned for New Caledonia until a financing or sale transaction for the Nkamouna Project is underway. This downsizing and deferral is being implemented to reduce financial commitments and overheads and poise the Company for success going forward.

Neither the Company, nor GeoCam, has any material debt or other similar obligations or commitments. We believe that our present capital resources will be sufficient to satisfy the Company’s existing capital and liquidity requirements described above into the second quarter of 2013, not including any equity requirements in connection with any Project debt financing by GeoCam. We have no standby financing arrangements currently in place.

Off-Balance Sheet Arrangements

We have no off balance sheet arrangements that are reasonably likely to have a current or future effect on our financial condition, revenues, results of operations, liquidity or capital expenditures.

Results of Operations

2011 compared to 2010

We have no material current revenue and expect to continue to generate losses and negative cash flows from operations for the foreseeable future. Until and unless we sell some or all of our interest in the Nkamouna Project or project financing for the Project is secured and construction commences, we expect to reduce our operating and other expenditures from those in 2011.

We had a net loss attributed to Geovic stockholders of $14.8 million for the year ended December 31, 2011, a decrease of $3.5 million from the net loss of $18.3 million in 2010. The decrease in the loss in 2011 was mainly due to lower expenses for the Feasibility Study and related activities in Cameroon that were incurred throughout 2010 and were mostly concluded in Q1 2011.

For 2011, our exploration costs decreased by $5.4 million (33%) to $10.9 million compared to $16.3 million for the prior year. The decrease was mainly a result of significantly higher 2010 property evaluation costs in Cameroon, such as consultants engaged to work on the Feasibility Study, pilot studies and related activities. Most of this work was completed by the first quarter of 2011, and resulted in a $6.5 million decrease for 2011. The decrease was partially offset by early stage project financing costs incurred in 2011 as well as an increase in exploration costs for New Caledonia, New Mexico, and Papua New Guinea.

General and Administrative expenses in the United States decreased by $0.6 million to $7.2 million compared to $7.8 million in 2010. The decrease is largely due to approximately $0.7 million of employee severance costs incurred in 2010.

Stock compensation expense decreased approximately $0.1 million to $0.7 million compared to $0.8 million in 2010. In 2010 and in 2011 we made annual grants of options under the Stock Option Plan to officers, directors and employees and we also granted restricted stock awards and restricted stock units to directors in 2011. Due to a lower market price for our shares in 2011, the fair value of the options awarded in 2011 was lower than the prior year.

The change in fair value of warrants was a benefit of $0.1 million in 2011 compared to a benefit of $0.7 million in 2010. This change is mainly related to the decrease in the remaining expected life of the warrants and lower share prices. The fair value of the warrants is $0 as of the end of 2011.

 

44


Table of Contents

Other Income was $0.9 million in 2011 as GeoCam rented idle equipment to a third party for $0.5 million and we wrote-off a liability of $0.4 million related to a repayment obligation that would have been due to the U.S. Trade and Development Agency for a 2001 grant used for an early mining feasibility study. When the 10 year measurement and reporting periods under the grant expired, Geovic was relieved of its repayment obligation.

Interest income increased to $57,000 in 2011 compared to $6,000 in 2010 as interest rates we received on our cash investments were higher in 2011.

The net loss attributed to the non-controlling interest decreased by $3.0 million to $3.9 million compared to $6.9 million for the prior year due to smaller loss incurred by GeoCam as a result of the decreased expenditures in Cameroon.

2010 compared to 2009

We had a net loss attributed to Geovic of $18.3 million for the year ended December 31, 2010, an increase of $2.0 million from the net loss of $16.3 million in 2009. The increase in the loss in 2010 was mainly due to expenses for the Feasibility Study and related activities in Cameroon.

For 2010, our exploration costs increased by $5.3 million (49%) to $16.3 million compared to $11.0 million for the prior year. The increase was mainly a result of property evaluation costs in Cameroon, such as consultants engaged to work on the Feasibility Study, pilot studies and related activities, increasing by $4.5 million. Exploration office costs increased by $0.6 million.

General and Administrative expenses decreased by $0.4 million to $7.8 million compared to $8.2 million in 2009. The decrease was largely due to lower professional fees offset by an increase in employee severance costs and financial advisor fees.

Stock compensation expense decreased approximately $0.2 million to $0.8 million compared to $1.0 million in 2009. In both 2010 and 2009 we made annual grants of options under the Stock Option Plan to officers, directors and employees. The fair value of the options awarded in 2010 was lower than the prior year due primarily to lower market prices for our common stock.

The change in fair value of warrants was a credit of $0.7 million in 2010 compared to a charge of $0.1 million in 2009. This change was mainly related to the decrease in the remaining expected life of the warrants and lower share prices.

Depreciation was $0.2 million higher in 2010, reflecting higher gross asset values in 2010.

Interest income decreased to $6,000 in 2010 compared to $0.1 million in 2009 as interest rates we received on our cash investments were significantly lower in 2010 and our cash decreased by approximately $16.8 million in 2010.

The net loss attributed to the non-controlling interest increased by $2.3 million to $6.9 million compared to $4.6 million for the prior year due to increased losses in GeoCam resulting from increased expenditures incurred by GeoCam.

 

ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Not applicable to Registrant.

 

45


Table of Contents
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

The following financial information is included as part of this Annual Report on Form 10-K.

 

     Page  

Consolidated Financial Statements:

  

Report of Independent Registered Public Accounting Firms

     F-2   

Consolidated Balance Sheets at December 31, 2011 and 2010

     F-3   

Consolidated Statements of Operations for the Years Ended December 31, 2011, 2010 and 2009

     F-4   

Consolidated Statements of Stockholders’ Equity for the Years Ended December  31, 2011, 2010 and 2009

     F-5   

Consolidated Statements of Cash Flows for the Years Ended December 31, 2011, 2010 and 2009

     F-6   

Notes to Consolidated Financial Statements

     F-7   

 

ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE.

There were no changes in or disagreements with accountants on accounting and financial disclosure during the last three fiscal years.

 

ITEM 9A. CONTROLS AND PROCEDURES

Evaluation of Disclosure Controls and Procedures

The Company maintains disclosure controls and procedures (as defined in Rule 13a-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)), that are designed to ensure that information required to be disclosed in the reports that we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in Securities and Exchange Commission rules and forms, and that such information is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

Our management is responsible for establishing and maintaining our disclosure controls and procedures. Our Chief Executive Officer and Chief Financial Officer participated with our management in evaluating the effectiveness of our disclosure controls and procedures as of December 31, 2011.

Based on our management’s evaluation (with the participation of our Chief Executive Officer and Chief Financial Officer), our Chief Executive Officer and Chief Financial Officer have concluded that, as of December 31, 2011 our disclosure controls and procedures were effective to provide reasonable assurance that the information required to be disclosed by us in the reports we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

Management’s Report on Internal Control over Financial Reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f), to provide reasonable assurance regarding the reliability of our financial reporting and the preparation of financial statements for external purposes in accordance with US GAAP. Under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer, we conducted an evaluation of the design and operational effectiveness of our internal control over financial reporting as of December 31, 2011 based on the framework in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (“COSO”).

 

46


Table of Contents

Our management, including our Chief Executive Officer and Chief Financial Officer, does not expect that our disclosure controls or our internal control over financial reporting will prevent or detect all errors or all fraud. A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance that the control system’s objectives will be met. The design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Further, because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that misstatements due to error or fraud will not occur or that all control issues and instances of fraud, if any, within the company have been detected. These inherent limitations include the realities that judgments in decision-making can be faulty and that breakdowns can occur because of simple error or mistake. Controls can also be circumvented by the individual acts of some persons, by collusion of two or more people, or by management override of the controls. The design of any system of controls is based in part on certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Projections of any evaluation of controls effectiveness to future periods are subject to risks. Over time, controls may become inadequate because of changes in conditions or deterioration in the degree of compliance with policies or procedures.

A material weakness is a control deficiency, or combination of control deficiencies, in internal control over financial reporting such that there is a reasonable possibility that a material misstatement of the annual or interim financial statements will not be prevented or detected on a timely basis. Management’s assessment identified no material weaknesses in our internal control over financial reporting as of December 31, 2011.

Therefore, our management concluded that, as of December 31, 2011, our internal control over financial reporting was effective.

Changes in Internal Control over Financial Reporting

Management has evaluated, with the participation of the Chief Executive Officer and Chief Financial Officer, whether any changes in our internal control over financial reporting that occurred during our last fiscal quarter have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting. Based on the evaluation, management has concluded that no changes in our internal control over financial reporting have materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

 

ITEM 9B. OTHER INFORMATION

We have no information to report pursuant to Item 9B.

 

47


Table of Contents

PART III

 

ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

The information required by this item is incorporated herein by reference to the 2012 Proxy Statement for the Annual Meeting of Stockholders, which will be filed with the SEC not later than 120 days after December 31, 2011. Certain information concerning our executive officers is included immediately before Item 4.

 

ITEM 11. EXECUTIVE COMPENSATION

The information required by this item is incorporated herein by reference to the 2012 Proxy Statement for the Annual Meeting of Stockholders, which will be filed with the SEC not later than 120 days after December 31, 2011.

 

ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELEATED STOCKHOLDER MATTERS

The information required by this item is incorporated herein by reference to the 2012 Proxy Statement for the Annual Meeting of Stockholders, which will be filed with the SEC not later than 120 days after December 31, 2011.

 

ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS AND DIRECTOR INDEPENDENCE

The information required by this item is incorporated herein by reference to the 2012 Proxy Statement for the Annual Meeting of Stockholders, which will be filed with the SEC not later than 120 days after December 31, 2011.

 

ITEM 14. PRINCIPAL ACCOUNTING FEES AND SERVICES

The information required by this item is incorporated herein by reference to the 2012 Proxy Statement for the Annual Meeting of Stockholders, which will be filed with the SEC not later than 120 days after December 31, 2011.

 

48


Table of Contents

PART IV

 

ITEM 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES

(a) Documents filed as part of this Form 10-K

1. Financial Statements and Supplementary Data

 

     Page  

Report of Independent Registered Public Accounting Firm

     F-2   

Consolidated Balance Sheets at December 31, 2011 and 2010

     F-3   

Consolidated Statements of Operations for the Years Ended December 31, 2011, 2010 and 2009

     F-4   

Consolidated Statements of Stockholders’ Equity for the Years Ended December  31, 2011, 2010 and 2009

     F-5   

Consolidated Statements of Cash Flows for the Years Ended December 31, 2011, 2010 and 2009

     F-6   

Notes to Consolidated Financial Statements

     F-7   

2. Financial Statement Schedules (not applicable)

(b) See Exhibit Index below

(c) Not applicable

Exhibits

The following exhibits are filed as part of this Annual Report:

 

Exhibit
Number

  

Description

    3.1    Certificate of Domestication of the Registrant, dated November 21, 2006, incorporated by reference to Exhibit 3.1 to Form 10 Registration Statement filed May 14, 2007.
    3.2    Certificate of Incorporation of the Registrant, dated November 21, 2006, incorporated by reference to Exhibit 3.2 to Form 10 Registration Statement filed May 14, 2007.
    3.3    Bylaws of Registrant, incorporated by reference to Exhibit 3.3 to Form 10 Registration Statement filed May 14, 2007.
    4.1    Warrant Indenture dated April 20, 2007 between Geovic Mining Corp and Pacific Corporate Trust Company, incorporated by reference to Exhibit 4.4 to Form 10 Registration Statement filed May 14, 2007.
    4.2    Geovic Mining Corp. Audit Committee Charter Adopted April 30, 2007, incorporated by reference to Exhibit 4.5 to Form 10 Registration Statement filed May 14, 2007.
  10.1    Republic of Cameroon Mining Permit Decree, Dated April 11, 2003, incorporated by reference to Exhibit 10.4 to Form 10 Registration Statement filed May 14, 2007.
  10.2    Mining Convention Between The Republic of Cameroon and Geovic Cameroon, S.A., dated July 31, 2002, incorporated by reference to Exhibit 10.5 to Form 10 Registration Statement filed May 14, 2007.
  10.3    Geovic Cameroon Plc Shareholders Agreement, dated April 9, 2007, incorporated by reference to Exhibit 10.6 to Form 10 Registration Statement filed May 14, 2007.

 

49


Table of Contents

Exhibit
Number

  

Description

  10.4    Executive Employment Agreement of William A. Buckovic, dated January 1, 2008, including amendment effective January 1, 2010, incorporated by reference to Exhibit 10.9 for Form 10-K filed March 30, 2010.
  10.5    Executive Employment Agreement of John E. Sherborne Jr., dated January 1, 2008, including amendment effective January 1, 2010, incorporated by reference to Exhibit 10.11 for Form 10-K filed March 30, 2010.
  10.6    Executive Employment Agreement of Greg Hill, dated January 1, 2008, including amendment effective January 1, 2010, incorporated by reference to Exhibit 10.12 for Form 10-K filed March 30, 2010.
  10.7    Executive Employment Agreement of Barbara A. Filas, dated February 16, 2009, including amendment effective January 1, 2010, incorporated by reference to Exhibit 10.13 for Form 10-K filed March 30, 2010.
  10.8    Executive Employment Agreement of Alan W. Peryam, dated October 1, 2008, including amendment effective January 1, 2010, incorporated by reference to Exhibit 10.14 for Form 10-K filed March 30, 2010.
  10.9    Executive Employment Agreement of Gary R. Morris, dated January 1, 2007, including amendment effective January 1, 2010, incorporated by reference to Exhibit 10.15 for Form 10-K filed March 30, 2010.
  10.10    Executive Employment Agreement of Shelia I. Short, dated January 1, 2007, including amendment effective January 1, 2010, incorporated by reference to Exhibit 10.17 for Form 10-K filed March 30, 2010.
  10.11    Geovic Mining Corp. Second Amended and Restated Stock Option Plan, amended as of January 21, 2011, incorporated by reference to Exhibit 10.14 to Form 10-K filed March 29, 2011.
  10.12    Agreement on Settlement of Governance and past Financial Situation of Geovic Cameroon PLC dated 31 December 2007, incorporated by reference to Exhibit 10.19 to Form 10-K filed March 31, 2008.
  10.13    Charter of Compensation Committee for Geovic Mining Corp., incorporated by reference to Exhibit 10.22 to Form 10-K filed March 31, 2008.
  10.14    Charter for Nominating and Corporate Governance Committee for Geovic Mining Corp., incorporated by reference to Exhibit 10.23 to Form 10-K filed March 31, 2008.
  10.15    Geovic Mining Corp. 2010 Stock Award Plan, incorporated by reference to Exhibit 10.1 on Form 8-K filed June 15, 2010.
  10.16    Michael Mason Employment Agreement, dated January 21, 2011, incorporated by reference to Exhibit 10.22 to Form 10-K filed March 29, 2011.
  10.17    Timothy Arnold Employment Agreement, dated January 21, 2011, incorporated by reference to Exhibit 10.23 to Form 10-K filed March 29, 2011.
  10.18    Office Lease Agreement between CCP/MS SSIII Denver Tabor Center I Property Owner LLC and Geovic Mining Corp. dated August 21, 2008, incorporated by reference to Exhibit 99.2 to Current Report on Form 8-K filed October 8, 2008.
  10.19    Whistle-Blower Policy adopted December 21, 2009, incorporated by reference to Exhibit 10.30 from 10-K filed March 30, 2010.
  21.1    Subsidiaries of the Registrant, incorporated by reference to Exhibit 10.19 to Form 10-K filed March 29, 2011.

 

50


Table of Contents

Exhibit
Number

  

Description

  23.1    Consent of Ernst & Young LLP.*
  23.2    Consent of Knight Piésold*
  23.3    Consent of SRK Consulting (United States.), Inc.*
  23.4    Consent of Lycopodium Minerals Pty. Ltd.*
  31.1    Rule 13A-14(A) Certification of CEO.*
  31.2    Rule 13A-14(A) Certification of CFO.*
  32.1    Section 1350 Certification—CEO.*
  32.2    Section 1350 Certification—CFO.*
101.INS    XBRL Instance Document
101.SCH    XBRL Taxonomy Extension Schema Document
101.CAL    XBRL Taxonomy Extension Calculation Linkbase Document
101.DEF    XBRL Taxonomy Definition Linkbase Document
101.LAB    XBRL Taxonomy Extension Label Linkbase Document
101.PRE    XBRL Taxonomy Extension Presentation Linkbase Document

 

* Filed herewith.

 

51


Table of Contents

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this Report to be signed on its behalf by the undersigned thereunto duly authorized on March 28, 2012.

 

Geovic Mining Corp.

Registrant

By:

 

/s/    MICHAEL T. MASON        

Name:   Michael T. Mason
Title:   Chief Executive Officer

Pursuant to the requirements of the Securities Exchange Act of 1934, this Report has been signed below by the following persons on behalf of the registrant in the capacities indicated and on the dates indicated.

 

Signature

  

Title

 

Date

/s/    MICHAEL T. MASON        

Michael T. Mason

  

Chairman, Chief Executive Officer

(Principal Executive Officer)

  March 28, 2012

/s/    BARBARA A. FILAS        

Barbara A. Filas

   President   March 28, 2012

/s/    WILLIAM A. BUCKOVIC        

William A. Buckovic

   Executive Vice President and Director   March 28, 2012

/s/    GREG HILL        

Greg Hill

  

Chief Financial Officer

(Principal Financial Officer)

  March 28, 2012

/s/    BRIAN C. MAZESKI        

Brian C. Mazeski

  

Controller

(Principal Accounting Officer)

  March 28, 2012

/s/    ROBERT J. (DON) MACDONALD        

Robert J. (Don) MacDonald

   Director   March 28, 2012

/s/    GREGG SEDUN        

Gregg Sedun

   Director   March 28, 2012

/s/    PAUL D. ROSE        

Paul D. Rose

   Director   March 28, 2012

 

52


Table of Contents

Consolidated Financial Statements

Geovic Mining Corp.

(an exploration stage company)

December 31, 2011

(Stated in U.S. dollars)

 

F-1


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

Report of Independent Registered Public Accounting Firm

The Board of Directors and Shareholders of Geovic Mining Corp.

We have audited the accompanying consolidated balance sheets of Geovic Mining Corp. and subsidiaries as of December 31, 2011 and 2010, and the related consolidated statements of operations, shareholders’ equity, and cash flows for each of the three years in the period ended December 31, 2011. These financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these financial statements based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. We were not engaged to perform an audit of the Company’s internal control over financial reporting. Our audits included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company’s internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, the financial statements referred to above present fairly, in all material respects, the consolidated financial position of Geovic Mining Corp. and subsidiaries at December 31, 2011 and 2010, and the consolidated results of their operations and their cash flows for each of the three years in the period ended December 31, 2011, in conformity with U.S. generally accepted accounting principles.

/s/ Ernst & Young LLP

Denver, Colorado

March 28, 2012

 

F-2


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

CONSOLIDATED BALANCE SHEETS

(In thousands)

 

     December 31,  
     2011     2010  
ASSETS     

Current assets:

    

Cash and cash equivalents

   $ 15,554      $ 32,383   

Restricted cash

     98        —     

Prepaid expenses

     577        538   

Other

     273        101   
  

 

 

   

 

 

 

Total current assets

     16,502        33,022   

Property, plant and equipment, net [note 5]

     3,102        3,830   

Deposits

     256        90   
  

 

 

   

 

 

 

Total assets

   $ 19,860      $ 36,942   
  

 

 

   

 

 

 
LIABILITIES     

Current liabilities:

    

Accrued liabilities and other payables

   $ 1,394      $ 3,644   
  

 

 

   

 

 

 

Total current liabilities

     1,394        3,644   

Other liabilities

     497        547   

Related party payable [note 13 (c)]

     357        348   

Share-based payment liability [note 7]

     —          129   
  

 

 

   

 

 

 

Total liabilities

     2,248        4,668   
  

 

 

   

 

 

 

Commitments and contingencies [note 14]

    

EQUITY

    

Common stock, par value of $0.0001, 200 million shares authorized and 106.4 million and 104.3 million shares issued and outstanding in 2011 and 2010, respectively

     11        10   

Additional paid-in capital

     110,430        109,564   

Deficit accumulated during the exploration stage

     (102,775     (87,957
  

 

 

   

 

 

 

Total controlling stockholders’ equity

     7,666        21,617   

Noncontrolling interest [note 10]

     9,946        10,657   
  

 

 

   

 

 

 

Total equity

     17,612        32,274   
  

 

 

   

 

 

 

Total liabilities and equity

   $ 19,860      $ 36,942   
  

 

 

   

 

 

 

The accompanying notes are an integral part of these financial statements

 

F-3


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

CONSOLIDATED STATEMENTS OF OPERATIONS

(In thousands, except share and per share amounts)

 

     Years ended December 31,     Unaudited
period  from
Nov. 16, 1994
(inception) to
Dec. 31, 2011
 
     2011     2010     2009    

EXPENSES (INCOME)

        

Exploration costs [note 4]

   $ 10,894      $ 16,299      $ 10,966      $ 89,053   

General and administrative

     7,154        7,798        8,236        38,445   

Stock based compensation [notes 6-7]

     729        784        972        18,586   

Change in fair value of warrants [note7]

     (129     (662     116        (675

Interest and bank charges

     37        60        55        391   

Depreciation

     936        895        734        3,589   

Mineral property impairment

     —          —          —          3,244   
  

 

 

   

 

 

   

 

 

   

 

 

 

Total expenses

     19,621        25,174        21,079        152,633   

Other income

     (864     —          —          (864

Loss on asset disposal

     67        —          —          67   

Interest income

     (57     (6     (112     (4,853
  

 

 

   

 

 

   

 

 

   

 

 

 

Net loss before income taxes

     (18,767     (25,168     (20,967     (146,983

Income tax expense (benefit) [note 11]

     —          —          (75     (65
  

 

 

   

 

 

   

 

 

   

 

 

 

Consolidated net loss

     (18,767     (25,168     (20,892     (146,918
  

 

 

   

 

 

   

 

 

   

 

 

 

Less: Net loss attributed to the noncontrolling interest

     (3,949     (6,884     (4,601     (30,149
  

 

 

   

 

 

   

 

 

   

 

 

 

Net loss attributed to Geovic stockholders

   $ (14,818   $ (18,284   $ (16,291   $ (116,769
  

 

 

   

 

 

   

 

 

   

 

 

 

Net loss per share

   $ (0.14   $ (0.18   $ (0.16  
  

 

 

   

 

 

   

 

 

   

Weighted average shares outstanding

     104,963,741        103,829,109        103,016,274     
  

 

 

   

 

 

   

 

 

   

The accompanying notes are an integral part of these financial statements

 

F-4


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

CONSOLIDATED STATEMENTS OF

STOCKHOLDERS’ EQUITY

(in thousands, except share amounts)

 

     Common Stock      Additional
paid-
in capital
    Deficit     Noncontrolling
Interest
    Total  
     Shares      Amount           

Balance, December 31, 2008

     102,943,446       $ 10       $ 122,396      $ (67,377   $ 9,144      $ 64,173   
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

   

 

 

 

Cumulative effect of adoption of ASC 815-40 [note 8]

     —           —           (14,670     13,995        —          (675

Stock options exercised [note 6]

     130,600         —           6        —          —          6   

Stock-based compensation [note 6]

     —           —           971        —          —          971   

Noncontrolling interest contribution

     —           —           —          —          5,322        5,322   

Net loss for year

     —           —           —          (16,291     (4,601     (20,892
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

   

 

 

 

Balance, December 31, 2009

     103,074,046       $ 10       $ 108,703      $ (69,673   $ 9,865      $ 48,905   
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

   

 

 

 

Issuance of common stock [note 13]

     139,000         —           —          —          —          —     

Stock options exercised [note 6]

     1,079,366         —           77        —          —          77   

Stock-based compensation [note 6]

     —           —           784        —          —          784   

Noncontrolling interest contribution

     —           —           —          —          7,676        7,676   

Net loss for year

     —           —           —          (18,284     (6,884     (25,168
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

   

 

 

 

Balance, December 31, 2010

     104,292,412       $ 10       $ 109,564      $ (87,957   $ 10,657      $ 32,274   
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

   

 

 

 

Stock options exercised [note 6]

     1,855,342         1        137        —          —          138   

Stock-based compensation [note 6]

     210,000         —           729        —          —          729   

Noncontrolling interest contribution

     —           —           —          —          3,238        3,238   

Net loss for year

     —           —           —          (14,818     (3,949     (18,767
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

   

 

 

 

Balance, December 31, 2011

     106,357,754       $ 11       $ 110,430      $ (102,775   $ 9,946      $ 17,612   
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

   

 

 

 

The accompanying notes are an integral part of these financial statements

 

F-5


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

CONSOLIDATED STATEMENTS OF CASH FLOWS

(In thousands)

 

     Years ended December 31,     Unaudited
period  from
Nov. 16, 1994
(inception) to
Dec. 31, 2011
 
     2011     2010     2009    

OPERATING ACTIVITIES

        

Consolidated net loss

   $ (18,767   $ (25,168   $ (20,892   $ (146,918

Adjustments to reconcile net loss to net cash used in operating activities:

        

Depreciation expense

     936        895        734        3,589   

Stock-based compensation expense

     729        784        972        18,586   

Change in fair value of warrants

     (129     (662     116        (675

Loss on disposal of assets

     67        —          —          67   

Mineral property impairment

     —          —          —          3,244   

Changes in non-cash operating working capital:

        

(Increase) decrease in income tax receivable

     —          —          458        —     

Increase in restricted cash

     (98     —          —          (98

(Increase) in prepaid expenses

     (39     (76     (18     (577

Decrease (increase) in other assets

     (172     96        475        (165

(Increase) decrease in deposits

     (101     (71     4        (300

Increase (decrease) in accrued liabilities and other payables

     (2,250     221        (1,753     1,394   

Increase (decrease) in income tax payable

     —          —          —          —     

Increase (decrease) in other liabilities

     (50     (135     (341     497   

Increase in related party payables

     9        20        176        357   
  

 

 

   

 

 

   

 

 

   

 

 

 

Cash used in operating activities

     (19,865     (24,096     (20,069     (120,999

INVESTING ACTIVITIES

        

Purchases of property, plant and equipment

     (393     (427     (290     (6,877

Proceeds on sale of assets

     54        —          —          54   

Acquisition of mineral leases

     —          —          —          (3,244
  

 

 

   

 

 

   

 

 

   

 

 

 

Cash used in investing activities

     (339     (427     (290     (10,067

FINANCING ACTIVITIES

        

Noncontrolling interest contribution

     3,238        7,676        5,322        40,095   

Cash paid to rescind exercise of stock options

     —          —          —          (15

Proceeds from issuance of common stock and preferred stock

     —          —          —          95,589   

Proceeds from issuance of stock purchase warrants

     —          —          —          16,168   

Proceeds from exercise of stock options and stock purchase warrants

     137        77        6        2,528   

Stock issue costs

     —          —          —          (7,745
  

 

 

   

 

 

   

 

 

   

 

 

 

Cash provided by financing activities

     3,375        7,753        5,328        146,620   

Net increase (decrease) in cash and cash equivalents

     (16,829     (16,770     (15,031     15,554   

Cash and cash equivalents, beginning of year

     32,383        49,153        64,184        —     
  

 

 

   

 

 

   

 

 

   

 

 

 

Cash and cash equivalents, end of year

   $ 15,554      $ 32,383      $ 49,153      $ 15,554   
  

 

 

   

 

 

   

 

 

   

 

 

 

SUPPLEMENTAL INFORMATION

        

Income Taxes Paid

   $ —        $ —        $ —        $ —     

The accompanying notes are an integral part of these financial statements

 

F-6


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

1. NATURE OF BUSINESS AND CONTINUANCE OF OPERATIONS

Geovic Mining Corp. (the “Company”) is incorporated under the laws of the state of Delaware. The Company owns 100% of the shares of Geovic, Ltd. (“Geovic”), a company that has been in the mining exploratory stage since its inception on November 16, 1994. The Company is an exploration stage company in the process of planning to develop its mineral properties through its subsidiaries. As an exploration stage entity we would require further technical analysis and financing in order to bring our properties into development.

Geovic is engaged in the business of exploring for cobalt, nickel and related minerals through its majority-owned (60.5%) subsidiary, Geovic Cameroon, PLC (“GeoCam”), a financially dependent public limited company duly organized and incorporated under the laws of the Republic of Cameroon.

The Company is also engaged in the worldwide exploration of energy and mineral resources directly or indirectly through its ownership of Geovic Energy Corp. and Geovic Mineral Sands Corp., formed in 2007 and 2009 respectively under the laws of the State of Colorado, Geovic France SAS, formed in December 2008 under the laws of France, and Geovic Nouvelle-Calédonie SAS, formed in March 2009 under the laws of New Caledonia.

As an exploration stage company, we have a history of losses, deficits and negative operating cash flows and may continue to incur losses in the future. We continue to evaluate our cash position and cash utilization. Our cash resources and ability to access additional financing will be critical to our financial condition until we begin to receive operating revenue, which may not be until operations at the Nkamouna Project begin, which could be at least three years after completion of required financing arrangements.

Based on the estimated capital and start-up costs of the Nkamouna Project, we presently do not have sufficient capital resources available to meet anticipated equity requirements. Our ability to raise additional capital for this purpose would depend on a number of factors, many of which are partly or wholly outside of our control, including the state of world-wide financial, commodity and other markets, the market trading price of our common stock and demand for future access to the cobalt resources in the Nkamouna Project. We are currently investigating all strategic alternatives available to us, including selling some or all of our interest in the Project to a third party.

We have been closely monitoring our fixed and variable costs and intend to restrict such costs to those expenses that are necessary to complete activities related to securing project financing for the Nkamouna Project, identifying opportunities to generate cash from our existing exploration properties and identifying additional sources of working capital and general administrative costs in support of such activities. Management and the Board of Directors have already begun to implement a number of cash conservation strategies for the Company and GeoCam. The most significant cost reductions compared to previous years are our reduction of expenditures at GeoCam. With the completion of the Feasibility Study in 2011, GeoCam no longer incurs the significant costs of technical evaluations, consultant and testing fees and travel that contributed to that study. We have since reduced Project expenses to incur only necessary expenditures, primarily limited to securing the site, reclaiming exploration disturbances, environmental monitoring, and supporting potential financial and strategic investor due diligence efforts. This has significantly reduced the anticipated level of GeoCam cash requirements for 2012.

In addition, we reduced the size of our Board of Directors to five persons, eliminated two consulting positions, agreed with a financial advisor to discontinue its services at least until a financing transaction is underway, eliminated much of our mineral and corporate marketing activities and limited travel and office

 

F-7


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

expenses. A senior executive is retiring and we are looking to amicably reduce certain other financial obligations that are subject to contracts through negotiations and mutually acceptable resolution. Finally we have decided to defer most exploration activities planned for New Caledonia until a financing or sale transaction for the Nkamouna Project is better understood. This downsizing and deferral is being implemented to reduce financial commitments and overheads and poise the Company for success going forward.

We are seeking to 1) realize value for the Cameroonian assets and 2) shift the Company’s focus to a prospect generation and strategic investment business model in 2012 and beyond. Since our position in GeoCam will likely be significantly diminished or completely eliminated through strategic investment upon completion of a financing transaction, the future direction for the Company will be to identify new exploration prospects, minimally develop and prioritize existing and new prospects, and sell or joint venture further exploration and development of those prospects to others. The Company expects to take prospects to a level where they can be timely monetized through strategic investments by others who have the resources to complete advanced exploration, permitting and development.

Our consolidated cash balance at December 31, 2011 was $15.6 million. We anticipate that the Company will be able to satisfy the cash requirements of its operations into the second quarter of 2013 with current cash resources, however, we may be unable to obtain long-term funding and our near-term expenses could be greater than projected. If we are unable to obtain additional capital, we will need to further curtail our operations in order to preserve working capital, which could materially harm our business and our ability to achieve cash flow in the future, including delaying or reducing implementation of certain aspects of our plans for developing the Nkamouna Project.

2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

Basis of presentation

This summary of significant accounting policies is presented to assist in understanding the Company’s financial statements. The consolidated financial statements and notes are representations of the Company’s management, which is responsible for their content. These accounting policies conform to United States generally accepted accounting principles (“US GAAP”) and have been consistently applied in the preparation of the financial statements. Certain prior year amounts have been reclassified to conform to the current year presentation.

Principles of consolidation

The consolidated financial statements include the accounts of the Company and its more than 50% owned subsidiaries. All significant intercompany transactions and balances have been eliminated in consolidation.

Use of estimates

The preparation of these financial statements in conformity with US GAAP, requires management to make estimates and judgments that affect the reported amounts in the consolidated financial statements and accompanying notes. The Company bases its estimates and judgments on historical experience and on various other assumptions that it believes are reasonable under the circumstances. These estimates are based on management’s knowledge about current events and expectations about actions the Company may undertake in the future. Actual results could differ materially from those estimates.

 

F-8


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

Exploration and development costs

Exploration costs are expensed as incurred. When it has been established that a mineral deposit can be commercially mined and a decision has been made to formulate a mining plan (which occurs upon completion of a positive economic analysis of the mineral deposit), the costs subsequently incurred to develop the mine prior to the start of mining operations will be capitalized. Capitalized amounts may be written down if future undiscounted cash flows, including potential sales proceeds, related to a mineral property are estimated to be less than the carrying value of the property. To date, no amounts have been capitalized in respect of development activities.

Mineral property acquisition costs

Mineral property acquisition costs are capitalized until the viability of the mineral interest is determined. Capitalized acquisition costs are expensed in the period in which it is determined that the mineral property has no future economic value.

Capitalized amounts may be written down if future cash flows, including potential sales proceeds, related to the property are estimated to be less than the carrying value of the property. Management of the Company reviews the carrying value of each mineral property interest periodically, and whenever events or changes in circumstances indicate that the carrying value may not be recoverable, the amount is adjusted.

Stock-based compensation

The Company accounts for its stock-based compensation in accordance with ASC 718 Stock Compensation. Under the fair value recognition provisions of ASC 718, stock-based compensation is measured at the grant date based on the value of the awards and the value is recognized on a straight-line basis over the requisite service period (usually the vesting period). ASC 718 requires the recognition of the equity component of deferred compensation as additional paid-in-capital. ASC 718 also requires the Company to estimate forfeitures in calculating the cost related to stock-based compensation as opposed to recognizing these forfeitures and the corresponding reduction in expense as they occur.

Cash and cash equivalents

Cash and cash equivalents consists of liquid investments with an original maturity of 3 months or less.

Restricted Cash

As of December 31, 2011, restricted cash is comprised of cash that has been pledged as collateral for a standby letter of credit related to drilling reclamation obligations and as collateral for a corporate purchase card program.

Property, plant and equipment, net

Property, plant and equipment are stated at cost less depreciation. Depreciation is computed on the straight-line method using the following lives:

 

Buildings and leasehold improvements

   10 to 20 years

Machinery and equipment

   5 to 7 years

Vehicles

   5 years

Furniture and equipment

   5 years

 

F-9


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

Equipment in transit and buildings under construction are not depreciated until placed into service.

Asset Retirement Obligations

The Company records the fair value of an asset retirement obligation as a liability in the period in which it incurs a legal obligation associated with the retirement of tangible long-lived assets that results from the acquisition, construction, development or normal use of the assets with a corresponding increase in the carrying amount of the related long-lived asset. This amount is then depreciated over the estimated useful life of the asset. Over time, the liability is increased to reflect an interest element (accretion expense) considered in its initial measurement at fair value. The amount of the liability will be subject to re-measurement at each reporting period. Currently, the Company has no asset retirement obligation.

Income taxes

Deferred income taxes are provided for temporary differences arising from differences between the financial statement amount and tax basis of assets and liabilities existing at each balance sheet date using enacted tax rates anticipated to be in effect when the related taxes are expected to be paid or recovered. A valuation allowance is established if it is more likely than not that a deferred tax asset will not be realized. In determining the need for a valuation allowance, the Company considers projected realization of tax benefits based on expected levels of future taxable income, available tax planning strategies and its overall deferred tax position.

ASC 740-10-25, Accounting for Uncertainty in Income Taxes prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken in a tax return. Under ASC 740-10-25, a company can recognize the benefit of an income tax position only if it is more likely than not (greater than 50%) that the tax position will be sustained upon tax examination, based solely on the technical merits of the tax position. ASC 740-10-25 also provides guidance on de-recognition, classification, interest and penalties, accounting in interim periods, disclosure and transition.

Foreign currency remeasurement

The Company and its subsidiaries, all of which are considered to be integrated, use the United States Dollar (“USD”) as their functional currency. Current assets and liabilities denominated in foreign currencies are remeasured into the USD at the rates of exchange prevailing on the balance sheet date. Other nonmonetary consolidated balance sheet items are remeasured into the USD at the rate prevailing on the respective transaction dates. The resulting foreign exchange gains and losses are included in exploration costs on the statement of operations. For 2011, the Company recorded a gain of approximately $0.1 million. For 2010 and 2009 the Company recorded losses of approximately $0.9 million and $125, respectively.

Loss per share

Loss per share is computed by dividing net loss attributed to Geovic stockholders by the weighted average number of common shares outstanding during the year. Stock options and warrants will be dilutive when the Company has income from continuing operations and when the average market price of the common shares during the period exceeds the exercise price of the options and warrants. Due to the net loss attributed to Geovic for all periods presented, the stock options and warrants have been anti-dilutive and, therefore, not included in the loss per share calculations.

 

F-10


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

3. RECENT ACCOUNTING PRONOUNCEMENTS

In January 2010, the FASB issued authoritative guidance, which requires additional disclosures and clarifies certain existing disclosure requirements regarding fair value measurements. This guidance is effective for interim and annual reporting periods beginning after December 15, 2009. The Company adopted this guidance effective January 1, 2010. However, none of the specific additional disclosures were applicable at December 31, 2011.

In May 2011, the FASB issued guidance clarifying previous guidance related to fair value measurement. This guidance is effective during interim and annual periods beginning after December 15, 2011. It is effective for the Company’s interim period beginning on January 1, 2012. Early application is not permitted. The adoption of this guidance is not expected to have a material impact on the Company’s consolidated financial position, results of operations or disclosures.

4. EXPLORATION COSTS

GeoCam gained exclusive rights to exploitation of the cobalt and nickel deposits with the granting of a Mining Convention by the government of Cameroon on August 1, 2002. The Mining Convention grants GeoCam the exclusive rights to mine, process, and export cobalt, nickel and related substances from lands subject to a Mining Permit, which was granted by decree on April 11, 2003. The Mining Convention, which has a primary term of 25 years, sets forth all legal and fiscal provisions governing the mining operation. It is renewable under certain conditions for the life of the resource.

The following is a summary of the exploration costs incurred by the Company:

 

     2011      2010      2009      Unaudited
period from
Nov. 16, 1994
(inception) to
Dec. 31, 2011
 

Cameroon, Africa:

           

Property evaluation

   $ 4,270       $ 10,103       $ 5,634       $ 52,876   

Office costs

     4,421         4,977         4,297         29,705   
  

 

 

    

 

 

    

 

 

    

 

 

 
     8,691         15,080         9,931         82,581   
  

 

 

    

 

 

    

 

 

    

 

 

 

Other projects:

           

Colorado and Wyoming

     90         251         67         2,066   

Arizona

     347         533         150         1,295   

New Mexico

     561         —           —           561   

New Caledonia

     839         352         670         1,861   

Papua New Guinea

     266         —           —           266   

Other projects

     100         83         148         423   
  

 

 

    

 

 

    

 

 

    

 

 

 
     2,203         1,219         1,035         6,472   
  

 

 

    

 

 

    

 

 

    

 

 

 

Total Exploration Costs

   $ 10,894       $ 16,299       $ 10,966       $ 89,053   
  

 

 

    

 

 

    

 

 

    

 

 

 

 

F-11


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

5. PROPERTY, PLANT AND EQUIPMENT, NET

As of December 31, property, plant and equipment consisted of the following:

 

     2011     2010  

Cameroon, Africa:

    

Machinery and equipment

   $ 3,149      $ 3,149   

Vehicles

     1,012        989   

Buildings

     412        412   

Furniture and equipment

     526        529   

Equipment in transit

     14        66   
  

 

 

   

 

 

 
     5,113        5,145   

Less accumulated depreciation

     (2,287     (1,729
  

 

 

   

 

 

 
     2,826        3,416   
  

 

 

   

 

 

 
United States:     

Machinery and equipment

   $ 115      $ 8   

Furniture and equipment

     536        618   

Other

     143        143   
  

 

 

   

 

 

 
     794        769   

Less accumulated depreciation

     (518     (355
  

 

 

   

 

 

 
     276        414   
  

 

 

   

 

 

 
   $ 3,102      $ 3,830   
  

 

 

   

 

 

 

During the year ended December 31, 2011, GeoCam rented idle equipment to a third party and recorded $532 as other income in our consolidated statements of operations as a result of this transaction.

6. STOCK BASED COMPENSATION

Stock options

The Company adopted a stock option plan which was amended in June 2007, 2008 and 2009 (the “Company Option Plan”), under which 18,700,000 Company shares were reserved for issuance upon exercise of options granted under the Company Option Plan. The Company Option Plan is intended to provide a means whereby the Company and its subsidiaries can attract, motivate and retain key employees, consultants, and service providers who can contribute materially to the Company’s growth and success, and to facilitate the acquisition of shares of the Company’s common stock. The Company Option Plan provides for incentive stock options meeting the requirements of Section 422 of the Internal Revenue Code and nonqualified stock options that do not meet the requirements for incentive stock options. The Company Option Plan requires the option exercise price per share purchasable under the option to be equal to the greater of the closing price of the Company’s common shares on the Toronto Stock Exchange the day before or date of grant for all nonqualified stock options and incentive stock options. The Company has historically issued new shares when share-based awards are exercised.

 

F-12


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

The following table and related information summarizes the Company’s stock options and the stock option activity for the three years ended December 31, 2011, 2010 and 2009:

 

     Options Outstanding      Weighted
Average
Remaining
Contractual
Term (Years)
     Aggregate
Intrinsic
Value
(000’s)
 
     Options Available
for  Grant
    Number
Outstanding
    Weighted
Average
Exercise Price
per Share*
       

Available and outstanding at December 31, 2008

     4,913,082        13,786,918        0.76         

Granted

     (1,525,000     1,525,000        0.58         

Exercised

     130,600        (130,600     0.05         

Forfeited

     36,000        (36,000     1.31         

Expired

     72,000        (72,000     1.81         
  

 

 

   

 

 

   

 

 

       

Available and outstanding at December 31, 2009

     3,626,682        15,073,318        0.74         

Granted

     (1,725,000     1,725,000        0.84         

Exercised

     1,079,366        (1,079,366     0.07         

Expired

     14,000        (14,000     1.68         
  

 

 

   

 

 

   

 

 

       

Available and outstanding at December 31, 2010

     2,995,048        15,704,952        0.80         

Granted

     (1,720,000     1,720,000        0.70         

Exercised

     1,855,342        (1,855,342     0.07         

Forfeited

     1,200,000        (1,200,000     1.33         

Expired

     800,000        (800,000     1.30         
  

 

 

   

 

 

   

 

 

       

Available and outstanding at December 31, 2011

     5,130,390        13,569,610      $ 0.81         5.73       $ 256   
  

 

 

   

 

 

         

Exercisable at December 31, 2011

       11,970,110      $ 0.82         5.32       $ 256   

Vested or expected to vest at December 31, 2011

       13,055,904      $ 0.81         5.60       $ 256   

 

* Some of the options are granted with Canadian dollar exercise prices, and the weighted average prices reflect the U.S. dollar equivalent prices.

The following stock option grants were issued by the Company during the three years ended December 31, 2011, 2010 and 2009 respectively:

 

   

The Company granted 1,720,000 options under the Company Option Plan [2010—1,725,000, 2009—1,525,000]. The Company recorded compensation expense of $491 relating to vesting of the grants [2010—$784, 2009—$972]. The options vest 40% upon grant and 30% on each of the first and second anniversaries of the date of grant. As of December 31, 2011, there was $85 of total unrecognized compensation expense related to non-vested stock based compensation granted under the Company Option Plan which is expected to be recognized over a weighted average period of 0.9 years.

 

   

The weighted-average fair value per share of options granted under the Company’s Options Plan during 2011 was $0.40 [2010—$0.47, 2009—$0.35]. The total intrinsic value of share options exercised was $348 [2010—$708, 2009—$56]. The total cash received from the exercise of stock options was $137 [2010—$77, 2009—$6].

 

F-13


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

The fair value of all stock options granted was estimated at the date of grant using a Black-Scholes option pricing model with the following assumptions for the years ended December 31:

 

     2011     2010     2009  

Expected dividend

     0.00%        0.00%        0.00%   

Risk-free interest rate

         1.9% - 2.6%            2.1% - 2.6%            0.9% - 2.8%   

Expected volatility*

     67.0% - 67.7%        68.6% - 69.7%        63.4% - 69.4%   

Expected life (in years)

     5.5           5.5           1.7 - 5.5      

 

* For the years ended December 31, 2011, 2010, and 2009 volatility was estimated based on combining the Company’s historical volatility with the historical volatilities of certain other comparable exploration stage mining companies.

The company estimates expected forfeitures at the grant date and compensation expense is recorded only for those awards expected to vest. The estimate of expected forfeitures is reevaluated at the balance sheet date.

Option pricing models require the input of highly subjective assumptions, particularly as to the expected price volatility of the market value of the underlying stock. Changes in these assumptions can materially affect the fair value estimate and therefore it is management’s view that the existing models do not necessarily provide a single reliable measure of the fair value of the Company’s equity instruments.

Stock awards

The Company adopted the 2010 Company Stock Award Plan (the “Stock Award Plan”) that was approved in June 2010. The Common Stock that may be issued pursuant to Stock Awards shall not exceed 2,000,000 shares of Common Stock. The Common Stock subject to the Stock Award Plan shall be authorized and unissued stock. Stock Awards may be granted to Employees, Directors, Officers and Consultants. Stock Awards may be granted as Restricted Stock Awards or Restricted Stock Units. The fair value of restricted stock is calculated by multiplying the number of restricted shares by the closing price of our common stock on grant date. During the year ended December 31, 2011, we granted 210,000 Restricted Stock Awards to certain members of the executive management team and the Board of Directors. The Restricted Stock Awards vest 40% on the grant date (January 21, 2011), 30% on the 1st anniversary of the grant date, and 30% on the 2nd anniversary of the grant date. For the year ended December 31, 2011, the Company recognized compensation expense of $120 related to the Restricted Stock Awards. Also during the year ended December 31, 2011, we issued 180,000 Restricted Stock Units to certain members of the Board of Directors. The Restricted Stock Units will vest on the first anniversary of the grant date. The shares will be issued to the recipient on the earlier of their termination date or on the third anniversary of the grant date. For the year ended December 31, 2011, the Company recognized compensation expense of $118 related to the Restricted Stock Units. We issued no restricted stock awards or units prior to 2011.

 

F-14


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

The following table summarizes our restricted stock grant activity for the year ended December 31, 2011:

 

     Restricted Stock
Awards
    Restricted Stock
Units
 

Outstanding, beginning of period

     —          —     

Granted

     210        180   

Vested

     (173     (170

Forfeited and expired

     —          —     
  

 

 

   

 

 

 

Outstanding, end of period

     37        10   
  

 

 

   

 

 

 

Outstanding and expected to vest as of December 31, 2011

     37        10   

As of December 31, 2011, total unrecognized compensation expense related to Restricted Stock Awards is $25. This expense is expected to be recognized over a weighted-average period of 0.96 years. As of December 31, 2011, total unrecognized compensation expense related to Restricted Stock Units is $7. This expense is expected to be recognized over a weighted-average period of 0.05 years. The aggregate intrinsic value of Restricted Stock Awards and Restricted Stock Units outstanding and expected to vest is $6 and $2, respectively, at December 31, 2011. The weighted-average grant date fair value for both Restricted Stock Awards and Restricted Stock Units was $0.69.

7. STOCKHOLDERS’ EQUITY

Preferred stock

The Company is authorized to issue 50 million shares of preferred stock, with a par value of $0.0001. There are no shares of preferred stock outstanding as of December 31, 2011.

Stock Purchase Warrants

On January 1, 2009, the Company adopted new provisions of ASC 815, Derivatives and Hedging. The Company applied the newly adopted provisions of ASC 815 to its outstanding stock purchase warrants, which resulted in a $14.7 million reduction in additional paid-in capital offset by a $14.0 million reduction in the deficit and established a share-based payment liability of $675. ASC 815 requires the Company to adjust the share-based payment liability to the fair value each reporting period. The fair value adjustment for the stock purchase warrants did not materially affect net loss or loss per share in the consolidated statement of operations for the years ended December 31, 2011, 2010, or 2009.

 

F-15


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

The following table and related information summarizes the Company’s stock purchase warrants at December 31, 2011 and the stock purchase warrant activity for the three years ended December 31, 2011, 2010 and 2009:

 

     Number
Outstanding
    Weighted-Average
Exercise Price
per Share
 

Warrants outstanding at December 31, 2008

     21,067,637      $ 2.99   

Expired

     (298     2.25   
  

 

 

   

 

 

 

Warrants outstanding at December 31, 2009

     21,067,339      $ 2.99   

Expired

     (2,175,243     2.93   
  

 

 

   

 

 

 

Warrants outstanding at December 31, 2010

     18,892,096      $ 2.99   

Expired

     (3,299,996     2.31   
  

 

 

   

 

 

 

Warrants outstanding at December 31, 2011

     15,592,100      $ 3.14   
  

 

 

   

 

 

 

The Company recorded compensation expense of $0 relating to vesting of grants [2010—$0, 2009—$1]. The Company also recorded $(129) in 2011 [2010—$(662), 2009—$116] for the change in the fair value of the warrants that have exercise prices that are denominated in Canadian dollars.

The warrants outstanding at December 31, 2011 expire as follows: 10,800,000 March 2012 and 4,792,100 April 2012.

8. DERIVATIVE INSTRUMENTS

On January 1, 2009, the Company adopted ASC 815, Determining Whether an Instrument (or Embedded Feature) is Indexed to an Entity’s Own Stock. As part of the adoption of ASC 815, the Company determined that the stock purchase warrants denominated in Canadian dollars are not indexed to its stock, and therefore the value was recorded as a liability.

The Company recorded the following cumulative effect of change in accounting principle:

 

     Increase/(Decrease)  
     Share-Based
Payment  Liability
     Additional
Paid-in  Capital
    Deficit  

Balance as of December 31, 2008

   $ —         $ 15,748      $ (67,377

Record January 1, 2009, stock purchase warrants liability fair value

     675         —          (675

Reclassification of accumulated stock purchase warrant expense

     —           (14,670     14,670   
  

 

 

    

 

 

   

 

 

 

Cumulative Change in Balances as of January 1, 2009

   $ 675       $ 1,078      $ (53,382
  

 

 

    

 

 

   

 

 

 

 

F-16


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

Derivative Liabilities

The Company currently does not hold derivative instruments to manage its exposures to commodity prices. The Company evaluates all of its financial instruments to determine if such instruments are derivatives or contain features that qualify as embedded derivatives. All derivative financial instruments are recognized in the balance sheet at fair value. Changes in fair value are recognized in earnings if they are not eligible for hedge accounting or other comprehensive income if they qualify for cash flow hedge accounting.

A Black-Scholes option-pricing model was used to obtain the fair value of the Company’s stock purchase warrants using the assumptions described in note 6 at December 31, 2011 and 2010. The fair value of outstanding derivative instruments not designed as hedging instruments on the accompanying Consolidated Balance Sheets were as follows for the years ended December 31, 2011 and 2010:

 

Derivative Instruments

   Balance Sheet Location    2011      2010  

Stock purchase warrants

   Share—based payment liabilities    $ —         $ 129   

The effect of derivative instruments not designed as hedging instruments on the accompanying consolidated statements of operations was immaterial for the year ended December 31, 2011.

9. FAIR VALUE MEASUREMENTS

ASC 820, Fair Value Measurements and Disclosures, defines fair value as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date and establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy, as defined below, gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities and the lowest priority to unobservable inputs.

 

   

Level 1, defined as observable inputs such as quoted prices in active markets for identical assets.

 

   

Level 2, defined as observable inputs other than Level 1 prices. These include quoted prices for similar assets or liabilities in an active market, quoted prices for identical assets and liabilities in markets that are not active, or other inputs that are observable or can be corroborated by observable market data for substantially the full term of the assets or liabilities.

 

   

Level 3, defined as unobservable inputs in which little or no market data exists, therefore requiring an entity to develop its own assumptions.

The fair value of the share-based payment liability, is based on unobservable inputs in which little or no market data exists included the fair value of the Company’s stock purchase warrants as described in note 8, therefore it is classified as Level 3. The following table summarizes the change in the fair values of the share-based payment liability categorized as Level 3:

 

Beginning balance, December 31, 2008

   $ 675   

Change in fair value 2009

     116   

Change in fair value 2010

     (662

Change in fair value 2011

     (129
  

 

 

 

Balance at December 31, 2011

   $ —     
  

 

 

 

 

F-17


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

10. NONCONTROLLING INTEREST

On September 2, 2008, GeoCam shareholders approved a GeoCam capital increase for 2008 of CFA francs 30.34 billion equivalent to approximately $67 million, to be issued in multiple cash calls made by the GeoCam Board of Directors. The capital increase was based on GeoCam’s 2008 budget and Geovic’s pre-2007 capital advances made for GeoCam. At March 31, 2010 all of the 2008 capital increase had been paid by or for the accounts of the shareholders of GeoCam, including Geovic, in their respective ownership interests prior to the capital increase.

In May, 2010 GeoCam shareholders approved a capital increase equivalent to approximately $11 million for 2010 and in December an additional $13 million for the remainder of 2010 and 2011.

During the year ended December 31, 2010 GeoCam completed 5 cash calls, equivalent to approximately $19.4 million. In the cash calls Geovic paid approximately $11.7 million, representing 60.5% of the cash calls and the noncontrolling interest paid cash of approximately $7.7 million.

During the year ended December 31, 2011 GeoCam completed 2 cash calls, equivalent to approximately $8.2 million. In the cash calls Geovic paid approximately $5.0 million, representing 60.5% of the cash calls and the noncontrolling interest paid cash of approximately $3.2 million.

At December 31, 2011 there are no approved cash calls remaining, however, GeoCam may approve another capital increase in 2012.

The noncontrolling interest balance of approximately $9.9 million at December 31, 2011 [2010—$10.7 million, 2009—$9.9 million] represents the balance from the capital increases contributed by the noncontrolling interest as described above. The difference between the original amounts contributed and the balance at December 31, 2011 represents the noncontrolling interest share of the actual expenditures from January 1, 2007 through December 31, 2011.

11. INCOME TAXES

Income taxes

Pretax loss from continuing operations in 2011, 2010, and 2009 are as follows (in thousands):

 

     2011      2010      2009  

Domestic loss before taxes

   $ 7,053      $ 6,817      $ 8,431   

Foreign loss before taxes

     11,714        18,351        12,536  
  

 

 

    

 

 

    

 

 

 

Total loss before taxes

   $ 18,767      $ 25,168      $ 20,967   
  

 

 

    

 

 

    

 

 

 

Our income tax benefits consisted of the following (in thousands):

 

     2011      2010      2009  

Current:

        

United States Federal and State

   $ —         $ —         $ (75

Foreign

     —           —           —     
  

 

 

    

 

 

    

 

 

 

Total current income tax benefits

   $ —         $ —         $ (75
  

 

 

    

 

 

    

 

 

 

 

F-18


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

Reconciliation of statutory tax rates and income tax benefits at those rates to the effective income tax rates and income tax benefits reported in the statement of earnings is as follows (in thousands):

 

     2011     2010     2009  

Tax at US statutory rate

     35   $ (6,569     35   $ (8,809     35   $ (7,341

State taxes net of federal benefit

       (279       (295       (347

Non-deductible expenses

       154          116          205   

Change in valuation allowance

       2,854          2,722          3,568   

Foreign tax rate differences

       1          1          1   

Tax holiday

       3,499          6,100          4,077   

Other

       340          165          (238
  

 

 

   

 

 

   

 

 

 
     $ —          $ —          $ (75
  

 

 

   

 

 

   

 

 

 

The Company’s 60.5% owned subsidiary, GeoCam, is currently in the exploration phase of mining operations in Cameroon. GeoCam is currently under a tax regime under which certain Cameroon tax benefits are available. While in the exploration phase, it’s the Company’s understanding that GeoCam is under a tax holiday with a 0% tax rate. Also, once GeoCam enters the operational phase and for 12 years thereafter, they will be subject to income taxes at 50% of the statutory rate. The tax holiday had no impact on earnings per share for the year ended December 31, 2011. If the Cameroon tax authorities determine our understanding of the tax holiday is not correct and GeoCam had generated tax assets, these would be offset by a full valuation allowance.

Deferred income taxes reflect the tax consequences on future years of temporary differences between the tax basis of assets and liabilities and their financial reporting basis and are reflected as current or non-current depending on the classification of the asset or liability generating the deferred tax. The deferred tax provision for the periods shown represents the effect of changes in the amounts of temporary differences during those periods.

Significant components of the Company’s deferred tax assets are as follows:

 

     December 31,  
     2011     2010     2009  

Deferred income tax assets:

      

Exploration costs

   $ 3,649      $ 2,880      $ 2,372   

Net operating loss and tax credit carryforwards

     12,145        9,735        7,206   

Accrued Expenses

     69        71        58   

Stock-based compensation

     —          215        543   

Excess of capital loss over capital gain

     3        3        3   
  

 

 

   

 

 

   

 

 

 

Deferred income tax asset

     15,866        12,904        10,182   

Deferred income tax liabilities:

      

Unrealized foreign currency exchange

     (1     —          —     

Stock based compensation

     (107     —          —     
  

 

 

   

 

 

   

 

 

 

Deferred income tax liability

     (108     —          —     

Valuation allowance

     (15,758     (12,904     (10,182
  

 

 

   

 

 

   

 

 

 

Net deferred income tax asset (liability)

   $ —        $ —        $ —     
  

 

 

   

 

 

   

 

 

 

 

F-19


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

The Company has net operating losses in the United States, France, and New Caledonia. As a result, these entities have net deferred tax assets. The Company has provided a valuation allowance to reduce these deferred tax assets based on the uncertainty of generating future taxable income.

The net operating losses available as of December 31, 2011 to offset future taxable income in the United States, France, and New Caledonia are $28.2 million, $166, and $1.5 million, respectively. The income tax rate for France is 33.33%, and the income tax rate for New Caledonia is 35%. The net operating losses generated in the U.S. expire beginning in 2020 if not utilized. The net operating losses generated in France expire beginning in 2013. The net operating losses generated in New Caledonia may be carried forward indefinitely. The net operating losses may be subject to Section 382 limitations.

The consolidated financial statements do not reflect a carry-forward benefit of $201 associated with windfall stock option expense which arose in the period from January 1, 2011 to December 31, 2011 [2010—$77, 2009—$7]. In accordance with the Financial Accounting Standard Board’s Standard No. 123(R), the Company is not permitted to benefit from stock option expense until it is a cash taxpayer. The Company is not expected to be a cash taxpayer in the United States in the immediate future.

As of December 31, 2011, we had no unrecognized tax benefits and recognized $0 in interest and penalties in income tax expense in accordance with ASC Topic 740.

We are subject to examination by numerous taxing authorities in jurisdictions such as Cameroon, France and the U.S. We are generally no longer subject to U.S. federal, state and local, or non-U.S. income tax examinations by taxing authorities for years before 2008.

12. LOSS PER SHARE

Basic loss per share has been computed by dividing the net loss applicable to the Company’s common stockholders by the weighted average number of shares of common stock outstanding during each period. Diluted loss per share is computed by including the dilutive effect of common stock that would be issued assuming exercise of the outstanding stock options and stock purchase warrants. Excluded from the computation of diluted loss per share for the three years ended December 31, 2011, 2010, and 2009 are shares underlying outstanding options because the effect would have been anti-dilutive as the Company incurred losses from continuing operations in each of these periods.

13. RELATED PARTY TRANSACTIONS

 

[a] On June 15, 2009, Geovic, Ltd., entered into an agreement with Mineral Services, LLC which was amended effective December 31, 2009 and June 15, 2010, related to project development, technical, financing, and marketing services. Mineral Services, LLC is owned by Michael Mason, a director of the Company. Total fees paid to Mineral Services, LLC under the agreement during 2011 were $6 [2010 – $112; 2009 – $58]. Michael Mason became Chief Executive Officer of the Company on January 21, 2011 and, as a result, the consulting agreement was cancelled at that time.

 

[b]

Geovic held an option granted in 2006 to acquire the 0.5% ownership interest in GeoCam held by William A. Buckovic, an officer and director of the Company and Geovic. Under the option agreement, Geovic was obligated to pay all GeoCam capital increases on behalf of Mr. Buckovic to maintain his ownership interest in GeoCam. Effective September 2010, the Company exercised its right to acquire the 0.5% ownership

 

F-20


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

  interest in GeoCam by issuing 139,000 shares of the Company with an estimated fair value of approximately $85 to Mr. Buckovic. As the shares were issued for no cash proceeds nor generated any change in noncontrolling interest, no change in equity is reflected in the financial statements. As a result of exercising the right to purchase the 0.5% ownership interest in 2010, the Company fully owned the 60.5%. During the year ended December 31, 2011 Geovic paid $0 in the cash calls on behalf of a related party [2010—$55; 2009—$67].

 

[c] GeoCam entered into a professional and management services contract with Société Nationale d’Investissement du Cameroun (“S.N.I.”), the holder of 20% and representative of other holders of an additional 19.5% of the outstanding shares of GeoCam. The services are for government relations and administrative matters related to project development. GeoCam has expensed $328 during 2011 under the service contract [2010 – $328, 2009—$328]. In addition, we incurred $31 of other expenses with S.N.I. in 2011 [2010 – $20, 2009—$0].

14. COMMITMENTS AND CONTINGENCIES

 

[a] In November 2009, five management level consultants or employees of GeoCam filed litigation in Cameroon, claiming approximately $2.2 million as compensation and damages as a result of termination of their services by GeoCam in connection with a reduction in workforce in February and March 2009. In April 2010 the litigation was dismissed. In July 2010 the litigation was brought before another jurisdiction and, on June 3, 2011, the court before which four of the matters were pending entered judgments in favor of the four claimants totaling CFA 780,339,500 (approximately $1.6 million at December 31, 2011). On November 14, 2011, the court before which the fifth matter was pending entered a judgment in favor of the claimant totaling CFA 118,804,219 (approximately $239 at December 31, 2011). GeoCam has filed appeals in all five matters which stayed enforcement of the judgments pending resolution of the appeals. However, the Company believes all contractual and other obligations to the individuals were satisfied and that the appeals will ultimately be resolved favorably to GeoCam. Given the judgments, we believe it is reasonably possible that the outcome will be unfavorable to GeoCam, but we do not believe that an unfavorable outcome is probable, therefore, we have not accrued any amounts for these judgments in our consolidated financial statements.

 

[b] In December 2009 the Company engaged a financial advisor in connection with the financing of the Nkamouna project. The Company agreed to pay a fixed retainer fee of $50 per month and a $0.8 million success fee upon completion. The terms of the agreement were based on the assumption that the completion would occur by December 2010. A replacement agreement with GeoCam was entered into August 2010 with substantially the same terms except the new agreement extended the date of the expected completion of financing. Subsequent to yearend, the $50 per month retainer obligation has been mutually suspended at least until a financing transaction is underway.

 

[c] In January 2011, the Company engaged a financial advisor to advise it with respect to the Company’s obligations in connection with financing of the Nkamouna Project and to assist in developing arrangements with strategic investors. The Company agreed to pay a fixed retainer fee of $50 per month plus reimbursement of expenditures, and a minimum success fee of $1.0 million based on a sliding scale depending on the size of any financing transaction. Subsequent to yearend, the $50 per month retainer obligation has been mutually suspended at least until a financing transaction is underway.

 

[d] GeoCam has engaged legal counsel in connection with expected Project financing, payable monthly with fees limited to approximately GBP 0.5 million in 2011 (equivalent to approximately $0.8 million at December 31, 2011). GeoCam has expensed $472 during 2011 for these services.

 

F-21


Table of Contents

Geovic Mining Corp.

(an exploration stage company)

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(dollars in thousands, except per share amounts or as otherwise stated)

 

[e] GeoCam is obligated under its mining permit to provide persons living in the region of the permitted area with social, sports, education and health infra-structure to promote their well being. This obligation has been met by contracting with GeoAid International Inc. and/or its affiliate GeoAid Cameroon (“GeoAid”), non-profit international humanitarian organizations. During the year ended December 31, 2011 the Company contributed $0.4 million [2010—$0.4 million; 2009—$0.6 million] to GeoAid. While the Company is not legally obligated to contribute a specific amount, the Company in 2011, 2010 and 2009 was a primary financial contributor to GeoAid.

 

[f] GeoCam, entered into purchase orders for mining equipment in 2008 for obligations totaling €615 and deposited €99 toward the purchases. In 2009, GeoCam requested delay of the delivery of the equipment to 2010 or thereafter. The sellers agreed to accept the delay and keep the deposit for future use. No formal agreement to delay delivery has been completed. No liabilities were accrued in 2010 or 2011 for these commitments. In 2010, GeoCam utilized €55 of the deposits toward vehicle purchases.

 

[g] GeoCam received a letter from the Minister of Industry, Mines and Technological Development of the Republic of Cameroon on March 20, 2006 requesting payment of surface area taxes of approximately $500 and a penalty of the same amount for the period from 2003 to 2005. GeoCam has disputed this amount based on its interpretation of the Mining Convention signed on July 31, 2002 that GeoCam is only committed to pay this surface area tax once commercial exploitation begins.

GeoCam has further disputed the amount of surface area subject to tax which would reduce the estimated liability to approximately $470.

GeoCam deposited with the Cameroon tax authority approximately $100 on September 30, 2006 corresponding to the surface area tax for 2003. On November 30, 2006, GeoCam deposited with the Cameroon tax authority a further $300 corresponding to the surface area tax for 2004, 2005 and 2006. The deposit is not recorded as an asset on our consolidated balance sheets.

 

[j] The Company is committed to future minimum rent and lease payments under operating lease agreements for office space in Denver and Grand Junction, Colorado, USA, and Yaoundé, Cameroon. The Company leases all its facilities and certain assets under operating leases. Minimum future rental obligations existing under these operating leases at December 31, 2011 are as follows:

 

2012

   $  272   

2013

     185   

2014

     —     

2015 & Thereafter

     —     

Rent expense for 2011, 2010 and 2009 was $464, $487 and $383, respectively.

 

F-22