UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, DC 20549

FORM 10-Q

[X]    Quarterly Report Pursuant to Section 13 or 15(d) of the Securities
Exchange Act of 1934
For the quarterly period ended June 30, 2007

OR

[ ]    Transition Report Pursuant to Section 13 or 15(d) of the Securities
Exchange Act of 1934
For the transition period from ______ to ______

Commission file number 1-8641

_________________

COEUR D’ALENE MINES CORPORATION
(Exact name of registrant as specified in its charter)

Idaho 82-0109423
(State or other jurisdiction of (I.R.S. Employer Identification No.)
incorporation or organization)  

PO Box I,
 
505 Front Ave.  
Coeur d'Alene, Idaho 83816
(Address of principal executive offices) (Zip Code)

           (208) 667-3511          
(Registrant’s telephone number, including area code)

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days: Yes |X| No |_|

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer or a non-accelerated filer (See definition of “accelerated filer and large accelerated filer” in Rule 12b-2 under the Exchange Act). Large accelerated filer |X| Accelerated filer |_| Non-accelerated filer |_|

Indicate by check mark if the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes |_| No |X|

Applicable only to corporate issuers: Indicate the number of shares outstanding of each of Issuer’s classes of common stock, as of the latest practicable date: Common stock, par value $1.00, of which 278,447,498 shares were issued and outstanding as of August 6, 2007.

1


COEUR D’ALENE MINES CORPORATION

INDEX

Page No.

Part I.
Financial Information  

Item 1.
Financial Statements  
  Consolidated Balance Sheets - Unaudited
  June 30, 2007 and December 31, 2006  
 
Consolidated Statements of Operations and
  Comprehensive Income - Unaudited  
  Three and Six Months Ended June 30, 2007 and 2006  
 
Consolidated Statements of Cash Flows - Unaudited
  Three and Six Months Ended June 30, 2007 and 2006  
 
Notes to Consolidated Financial Statements - Unaudited

Item 2.
Management's Discussion and Analysis of  
  Financial Condition and Results of Operations 28 

Item 3.
Quantitative and Qualitative Disclosures About Market Risk 51 

Item 4.
Controls and Procedures 52 

Part II.
Other Information  

Item 1.
Legal Proceedings 53 

Item 1A.
Risk Factors 53 

Item 4.
Submission of Matters to a Vote of Security Holders 58 

Item 5.
Other Information 59 

Item 6.
Exhibits 59 

2


COEUR D’ALENE MINES CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
(Unaudited)

June 30,
2007

December 31,
2006

ASSETS (In Thousands)

CURRENT ASSETS
           
    Cash and cash equivalents   $ 236,232   $ 270,672  
    Short-term investments    36,270    70,373  
    Receivables    38,732    43,233  
    Ore on leach pad    32,729    31,302  
    Metal and other inventory    18,353    16,341  
    Deferred tax assets    3,872    3,629  
    Prepaid expenses and other    8,096    6,047  


     374,284    441,597  

PROPERTY, PLANT AND EQUIPMENT
  
    Property, plant and equipment    166,368    132,315  
    Less accumulated depreciation    (67,871 )  (64,206 )


     98,497    68,109  

MINING PROPERTIES
  
    Operational mining properties    135,381    130,447  
    Less accumulated depletion    (122,283 )  (116,361 )


     13,098    14,086  

    Mineral interests
    74,526    72,201  
    Less accumulated depletion    (9,635 )  (7,828 )


     64,891    64,373  
    Non-producing and development properties    258,979    190,988  


     336,968    269,447  

OTHER ASSETS
  
    Ore on leach pad, non-current portion    37,374    35,367  
    Restricted cash and cash equivalents    21,652    19,492  
    Debt issuance costs, net    4,999    5,151  
    Deferred tax assets    1,389    2,544  
    Other    8,749    7,919  


     74,163    70,473  


         TOTAL ASSETS   $ 883,912   $ 849,626  


        The accompanying notes are an integral part of these consolidated financial statements.

3


COEUR D’ALENE MINES CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
(Unaudited)

June 30,
2007

December 31,
2006

  (In thousands except share data)

LIABILITIES AND SHAREHOLDERS' EQUITY
           

CURRENT LIABILITIES
  
    Accounts payable   $ 35,967   $ 22,315  
    Accrued liabilities and other    8,877    11,865  
    Accrued income taxes    5,363    10,317  
    Accrued payroll and related benefits    7,005    8,527  
    Accrued interest payable    1,031    1,031  
    Current portion of reclamation and mine closure    4,662    4,460  


     62,905    58,515  

LONG-TERM LIABILITIES
  
    1 1/4% Convertible Senior Notes due January 2024    180,000    180,000  
    Reclamation and mine closure    27,579    27,226  
    Other long-term liabilities    4,265    2,891  


     211,844    210,117  

COMMITMENTS AND CONTINGENCIES
  
    (See Notes H, I, J, L, M and N)  

SHAREHOLDERS' EQUITY
  
    Common Stock, par value $1.00 per share; authorized 500,000,000  
        shares, issued 279,506,709 and 279,054,344 shares in 2007 and 2006  
        (1,059,211 shares held in treasury)    279,507    279,054  
    Additional paid-in capital    779,062    777,798  
    Accumulated deficit    (437,285 )  (463,221 )
    Shares held in treasury    (13,190 )  (13,190 )
    Accumulated other comprehensive income    1,069    553  


     609,163    580,994  



TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY
   $ 883,912   $ 849,626  




        The accompanying notes are an integral part of these consolidated financial statements.

4


COEUR D’ALENE MINES CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE INCOME
(Unaudited)

Three Months
Ended June 30,
Six Months
Ended June 30,
2007
2006
2007
2006
REVENUES (In thousands except per share data)

Sales of metal
    $ 51,664   $ 54,041   $ 102,524   $ 98,895  

COSTS AND EXPENSES
  
Production costs applicable to sales    26,740    21,587    47,760    41,687  
Depreciation and depletion    5,753    6,989    12,774    13,307  
Administrative and general    5,710    4,528    11,884    9,618  
Exploration    2,549    1,934    5,430    3,901  
Litigation settlement    --    469    507    469  





         Total cost and expenses
    40,752    35,507    78,355    68,982  





OTHER INCOME AND EXPENSE
  
Interest and other income    4,316    4,794    8,866    7,314  
Interest expense, net of capitalized interest    (83 )  (367 )  (170 )  (888 )




         Total other income and expense    4,233    4,427    8,696    6,426  





Income from continuing operations before income taxes
    15,145    22,961    32,865    36,339  
Income tax provision    (3,227 )  (2,829 )  (6,928 )  (2,481 )





INCOME FROM CONTINUING OPERATIONS
    11,918    20,132    25,937    33,858  
Income from discontinued operations, net of income taxes    --    1,357    --    1,968  
Gain on sale of net assets of discontinued operations    --    11,159    --    11,159  





NET INCOME
    11,918    32,648    25,937    46,985  
Other comprehensive income    688    1,736    516    1,740  





COMPREHENSIVE INCOME
   $ 12,606   $ 34,384   $ 26,453   $ 48,725  





BASIC AND DILUTED INCOME PER SHARE
  
Basic income per share:  
Income from continuing operations   $ 0.04   $ 0.07   $ 0.09   $ 0.13  
Income from discontinued operations    --    0.05    --    0.05  




Net income   $ 0.04   $ 0.12   $ 0.09   $ 0.18  





Diluted income per share:
  
Income from continuing operations   $ 0.04   $ 0.07   $ 0.09   $ 0.12  
Income from discontinued operations    --    0.04    --    0.04  




Net income   $ 0.04   $ 0.11   $ 0.09   $ 0.16  





Weighted average number of shares of common stock
  
   Basic    277,763    277,474    277,720    265,049  
   Diluted    302,240    302,188    302,205    289,832  

        The accompanying notes are an integral part of these consolidated financial statements.

5


COEUR D’ALENE MINES CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
(Unaudited)

Three Months
Ended June 30,
Six Months
Ended June 30,
2007
2006
2007
2006
  (In Thousands)

CASH FLOWS FROM OPERATING ACTIVITIES:
                   
Net income   $ 11,918   $ 32,648   $ 25,937   $ 46,985  
Add (deduct) non-cash items:  
    Depreciation and depletion    5,753    6,989    12,774    13,307  
    Deferred taxes    901    (1,058 )  1,274    (3,131 )
    Unrealized loss on embedded derivative, net    1,125    4,760    1,090    3,201  
    Share based compensation    1,044    538    1,606    1,164  
    Gain on sale of net assets of discontinued operations and other, net    --    (11,306 )  --    (11,322 )
    Other charges (credits)    (252 )  175    (231 )  692  
Changes in Operating Assets and Liabilities:  
    Receivables    (1,780 )  (4,020 )  5,784    810  
    Prepaid and other current assets    (3,004 )  (1,362 )  (3,160 )  (1,025 )
    Inventories    (404 )  (4,355 )  (5,446 )  (8,945 )
    Accounts payable and accrued liabilities    (3,757 )  8,554    (5,417 )  7,636  
 Discontinued operations    --    469    --    (176 )





CASH PROVIDED BY OPERATING ACTIVITIES
    11,544    32,032    34,211    49,196  

CASH FLOWS FROM INVESTING ACTIVITIES:
  
    Capital expenditures    (57,701 )  (25,677 )  (99,704 )  (53,484 )
    Purchases of short-term investments    (17,267 )  (80,527 )  (50,578 )  (224,148 )
    Proceeds from sales of short-term investments    22,101    62,890    82,261    101,106  
    Other    (41 )  (202 )  427    (443 )
    Discontinued operations    --    14,862    --    14,365  




CASH USED IN INVESTING ACTIVITIES    (52,908 )  (28,654 )  (67,594 )  (162,604 )

CASH FLOWS FROM FINANCING ACTIVITIES:
  
    Retirement of long-term debt and capital leases    (392 )  (352 )  (778 )  (689 )
    Proceeds from issuance of common stock    --    --    --    154,560  
    Payment of public offering costs    --    --    --    (8,388 )
    Common stock repurchased    --    --    (277 )  --  
    Other    --    280    (2 )  (74 )




    CASH PROVIDED BY (USED IN) FINANCING ACTIVITIES    (392 )  (72 )  (1,057 )  145,409  





INCREASE (DECREASE) IN CASH AND CASH EQUIVALENTS
    (41,756 )  3,306    (34,440 )  32,001  

    Cash and cash equivalents at beginning of period
    277,988    83,591    270,672    54,896  




    Cash and cash equivalents at end of period   $ 236,232   $ 86,897   $ 236,232   $ 86,897  




The accompanying notes are an integral part of these consolidated financial statements.

6


Coeur d’Alene Mines Corporation
and Subsidiaries
Notes to Consolidated Financial Statements
(Unaudited)

NOTE A – BASIS OF PRESENTATION

        The accompanying unaudited consolidated financial statements have been prepared in accordance with accounting principles generally accepted in the United States of America for interim financial information and the instructions for Form 10-Q and Article 10 of Regulation S-X. Accordingly, they do not include all the information and footnotes required by accounting principles generally accepted in the United States of America for complete financial statements. In the opinion of management, all adjustments (consisting of normal recurring adjustments) considered necessary for a fair presentation have been included. Operating results for the three- and six-month periods ended June 30, 2007 are not necessarily indicative of the results that may be expected for the year ending December 31, 2007. The balance sheet at December 31, 2006 has been derived from the audited financial statements at that date. For further information, refer to the consolidated financial statements and footnotes thereto included in the Coeur d’Alene Mines Corporation (“Coeur” or the “Company”) Annual Report on Form 10-K for the year ending December 31, 2006.

NOTE B – SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

        Principles of Consolidation: The consolidated financial statements include the wholly-owned subsidiaries of the Company, the most significant of which are Coeur Rochester, Inc., Coeur Alaska, Inc., Compania Minera CDE Cerro Bayo Ltd., Coeur Argentina, CDE Australia Pty Ltd. and Empressa Minera Manquiri S.A. The consolidated financial statements also include all entities in which voting control of more than 50% is held by the Company. The Company has no investments in entities in which it has greater than 50% ownership interest accounted for using the equity method. Intercompany balances and transactions have been eliminated in consolidation. Investments in corporate joint ventures where the Company has ownership of 50% or less and funds its proportionate share of expenses are accounted for under the equity method. The Company has no investments in entities in which it has a greater than 20% ownership interest accounted for using the cost method.

        Revenue Recognition: Pursuant to guidance in Staff Accounting Bulletin (“SAB”) No. 104, “Revenue Recognition for Financial Statements”, revenue is recognized when persuasive evidence of an arrangement exists, delivery has occurred, the price is fixed or determinable, no obligations remain and collectibility is probable. The passing of title to the customer is based on the terms of the sales contract. Product pricing is determined at the point revenue is recognized by reference to active and freely traded commodity markets, for example the London Bullion Market for both gold and silver, in an identical form to the product sold.

        Under our concentrate sales contracts with third-party smelters, final gold and silver prices are set on a specified future quotational period, typically one to three months, after the shipment date based on market metal prices. Revenues are recorded under these contracts at the time title passes to the buyer based on the forward price for the expected settlement period. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices. Final settlement is based on the average applicable price for a specified future period, and generally occurs from three to six months after shipment. Final sales are settled using smelter weights, settlement assays (average of assays exchanged and/or umpire assay results) and are priced as specified in the smelter contract. The Company’s provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates measured at the forward price at the time of sale. The embedded derivative does not qualify for hedge accounting. The embedded derivative is recorded as a derivative asset, in prepaid expenses and other assets or as a derivative liability in accrued liabilities and other on the balance sheet and is adjusted to fair value through revenue each period until the date of final gold and silver settlement. The form of the material being sold, after deduction for smelting and refining is in an identical form to that sold on the London Bullion Market. The form of the product is metal in flotation concentrate, which is the final process for which the Company is responsible.

7


        The effects of forward sales contracts are reflected in revenue at the date the related precious metals are delivered or the contracts expire. Third party smelting and refining costs of $2.0 million, $2.6 million, $3.7 million and $4.3 million during the three and six months ended June 30, 2007 and 2006, respectively, are recorded as a reduction of revenue.

        At June 30, 2007, the Company had outstanding provisionally priced sales of $73.1 million, consisting of 3.8 million ounces of silver and 34,159 ounces of gold. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $38,300; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $34,200. At June 30, 2006, the Company had outstanding provisionally priced sales of $43.9 million, consisting of 2.9 million ounces of silver and 16,719 ounces of gold. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $28,600; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $16,700.

        Short-term Investments: Short-term investments principally consist of highly-liquid United States, foreign government and corporate securities and investment-grade auction rate securities, all classified as available-for-sale and reported at fair value with maturities that range from three months to forty years. Unrealized gains and losses on these investments are recorded in accumulated other comprehensive loss as a separate component of shareholders’ equity. Any decline in market value considered to be other than temporary is recognized in determining net income/loss. Realized gains and losses from the sale of these investments are included in determining net income/loss. The Company maintains a pledge of collateral agreement to reserve $1.0 million against the investment portfolio to cover credit exposure related to ACH transactions.

        Prior to December 31, 2006, the Company classified its auction rate securities as cash and cash equivalents because the securities were highly liquid and the periods between interest rate resets generally did not exceed 90 days. During the fourth quarter of 2006, the Company determined that, pursuant to SFAS 95, “Statement of Cash Flows”, its auction securities should not have been classified as cash equivalents because their contractual maturities exceed 90 days. The Company classified its auction rate securities as of December 31, 2006 as short term investments.

        The Company corrected the classification in its cash flow statement for the three and six months ended June 30, 2006 by reclassifying $22.4 million and $126.8 million of auction rate securities from net changes in cash and cash equivalents to net changes from purchases and/or sales of short-term investments. As a result, the following table shows the amounts, as originally presented in the Company’s Form 10-Q, for the three and six months ended June 30, 2006 and the corrected 2006 amounts as presented in its Form 10-Q for the three and six months ended June 30, 2007. This reclassification had no effect on total current assets, stockholders’ equity, net income (loss), net income (loss) per share or on cash provided by operating activities.

8


For the Three Months Ended June 30, 2006 As Previously
Reported

Adjustment
Corrected
(In Thousands)

Cash and Cash Equivalents
    $ 373,392   $ (286,495 ) $ 86,897  
Net Cash Used in Investing Activities    (6,219 )  (22,435 )  (28,654 )
Increase (decrease) in Cash and Cash Equivalents    25,741    (22,435 )  3,306  


For the Six Months Ended June 30, 2006 As Previously
Reported

Adjustment
Corrected
(In Thousands)

Cash and Cash Equivalents
    $ 373,392   $ (286,495 ) $ 86,897  
Net Cash Used in Investing Activities    (35,829 )  (126,775 )  (162,604 )
Increase (decrease) in Cash and Cash Equivalents    158,776    (126,775 )  32,001  

        Ore on Leach Pad: The heap leach process is a process of extracting silver and gold by placing ore on an impermeable pad and applying a diluted cyanide solution that dissolves a portion of the contained silver and gold, which are then recovered in metallurgical processes.

        The Company uses several integrated steps to scientifically measure the metal content of ore placed on the leach pads. As the ore body is drilled in preparation for the blasting process, samples are taken of the drill residue which is assayed to determine estimated quantities of contained metal. The Company estimates the quantity of ore by utilizing global positioning satellite survey techniques. The Company then processes the ore through crushing facilities where the output is again weighed and sampled for assaying. A metallurgical reconciliation with the data collected from the mining operation is completed with appropriate adjustments made to previous estimates. The crushed ore is then transported to the leach pad for application of the leaching solution. As the leach solution is collected from the leach pads, it is continuously sampled for assaying. The quantity of leach solution is measured by flow meters throughout the leaching and precipitation process. After precipitation, the product is converted to dorè, which is the final product produced by the mine. The inventory is stated at lower of cost or market, with cost being determined using a weighted average cost method.

        The Company reported ore on leach pad of $70.1 million as of June 30, 2007. Of this amount, $32.7 million is reported as a current asset and $37.4 million is reported as a non-current asset. The distinction between current and non-current is based upon the expected length of time necessary for the leaching process to remove the metals from the broken ore. The historical cost of the metal that is expected to be extracted within twelve months is classified as current and the historical cost of metals contained within the broken ore that will be extracted beyond twelve months is classified as non-current. Inventories of ore on leach pad are valued based on actual production costs incurred to produce and place ore on the leach pad, adjusted for effects on monthly production of costs of abnormal production levels, less costs allocated to minerals recovered through the leach process.

        The estimate of both the ultimate recovery expected over time and the quantity of metal that may be extracted relative to the time the leach process occurs requires the use of estimates which are inherently inaccurate since they rely upon laboratory testwork. Testwork consists of 60 day leach columns from which the Company projects metal recoveries up to five years in the future. The quantities of metal contained in the ore are based upon actual weights and assay analysis. The rate at which the leach process extracts gold and silver from the crushed ore is based upon laboratory column tests and actual experience occurring over approximately twenty years of leach pad operations at the Rochester Mine. The assumptions used by the Company to measure metal content during each stage of the inventory conversion process includes estimated recovery rates based on laboratory testing and assaying. The Company periodically reviews its estimates compared to actual experience and revises its estimates when appropriate. The length of time necessary to achieve ultimate recoveries for silver and gold is currently estimated between 5 and 10 years.

9


        Metal and Other Inventory: Inventories include concentrate ore, dorè, ore in stockpiles and operating materials and supplies. The classification of inventory is determined by the stage at which the ore is in the production process. Inventories of ore in stock piles are sampled for gold and silver content and are valued based on the lower of actual costs incurred or estimated net realizable value based upon the period ending prices of gold and silver. Material that does not contain a minimum quantity of gold and silver to cover estimated processing expense to recover the contained gold and silver is not classified as inventory and is assigned no value. All inventories are stated at the lower of cost or market, with cost being determined using a weighted average cost method. Concentrate and dorè inventory includes product at the mine site and product held by refineries and are also valued at lower of cost or market value. Metal inventory costs include direct labor, materials, depreciation, depletion and amortization as well as administrative overhead costs relating to mining activities.

        Property, Plant, and Equipment: Expenditures for new facilities, capital leases, new assets or expenditures that extend the useful lives of existing facilities are capitalized and depreciated using the straight-line method at rates sufficient to depreciate such costs over the shorter of estimated productive lives of such facilities or the useful life of the individual assets. Productive lives range from 7 to 31 years for buildings and improvements, 3 to 13 years for machinery and equipment and 3 to 7 years for furniture and fixtures. Certain mining equipment is depreciated using the units-of-production method based upon estimated total proven and probable reserves. Maintenance and repairs are expensed as incurred.

        Operational Mining Properties and Mine Development: Costs incurred to develop new properties are capitalized as incurred, where it has been determined that the property can be economically developed. At the Company’s surface mines, these costs include costs to further delineate the ore body. At the Company’s underground mines, these costs include the cost of building access ways, shaft sinking and access, lateral development, drift development, ramps and infrastructure development. All such costs are amortized using the units of production method over the estimated life of the ore body based on recoverable ounces to be mined from proven and probable reserves. Interest expense allocable to the cost of developing mining properties and to construct new facilities is capitalized until assets are ready for their intended use. Gains or losses from sales or retirements of assets are included in other income or expense. Costs incurred during the start-up phase of a mine are expensed as incurred. Ongoing mining expenditures on producing properties are charged against earnings as incurred. Major development expenditures incurred to increase production or extend the life of the mine are capitalized. Mineral exploration costs are expensed as incurred.

        Mineral Interests: Significant payments related to the acquisition of the land and mineral rights are capitalized as incurred. Prior to acquiring such land or mineral rights, the Company generally makes a preliminary evaluation to determine that the property has significant potential to develop an economic ore body. The time between initial acquisition and full evaluation of a property’s potential is variable and is determined by many factors including: location relative to existing infrastructure, the property’s stage of development, geological controls and metal prices. If a mineable ore body is discovered, such costs are amortized when production begins using the units-of-production method based on recoverable ounces to be mined from proven and probable reserves. If no mineable ore body is discovered, such costs are expensed in the period in which it is determined the property has no future economic value.

        Asset Impairment: The Company follows Statement of Financial Accounting Standard (“SFAS”) No. 144, “Accounting for the Impairment or Disposal of Long-Lived Assets,” to evaluate the recoverability of its assets. Management reviews and evaluates its long-lived assets for impairment when events and changes in circumstances indicate that the related carrying amounts of its assets may not be recoverable. Impairment is considered to exist if total estimated future cash flows or probability-weighted cash flows on an undiscounted basis, are less than the carrying amount of the assets, including property plant and equipment, mineral property, development property, and any deferred costs. An impairment loss is measured and recorded based on the difference between book value and discounted estimated future cash flows or the application of an expected present value technique to estimate fair value in the absence of a market price. Future cash flows include estimates of recoverable ounces, gold and silver prices (considering current and historical prices, price trends and related factors), production levels and capital, all based on life-of-mine plans and projections. Assumptions underlying future cash flow estimates are subject to risks and uncertainties. If the assets are impaired, a calculation of fair value is performed and if the fair value is lower than the carrying value of the assets, the assets are reduced to their fair market value. Any differences between significant assumptions and market conditions and/or the Company’s operating performance could have a material effect on the Company’s determination of ore reserves, or its ability to recover the carrying amounts of its long-lived assets resulting in impairment charges. In estimating future cash flows, assets are grouped at the lowest level for which there are identifiable cash flows that are largely independent of cash flows from other asset groups. Generally, in estimating future cash flows, all assets are grouped at a particular mine for which there is identifiable cash flow.

10


        Restricted Cash and Cash Equivalents: The Company, under the terms of its lease, self insurance, and bonding agreements with certain banks, lending institutions and regulatory agencies, is required to collateralize certain portions of the Company’s obligations. The Company has collateralized these obligations by assigning certificates of deposit that have maturity dates ranging from three months to a year, to the respective institutions or agency. At June 30, 2007 and December 31, 2006, the Company held certificates of deposit and cash under these agreements of $21.7 million and $19.5 million, respectively, restricted for this purpose. The ultimate timing for the release of the collateralized amounts is dependent on the timing and closure of each mine. In order to release the collateral, the Company must seek approval from certain government agencies responsible for monitoring the mine closure status. Collateral could also be released to the extent the Company was able to secure alternative financial assurance satisfactory to the regulatory agencies. The Company believes there is a reasonable probability that the collateral will remain in place beyond a twelve-month period and has therefore classified these investments as long-term.

        Reclamation and Remediation Costs: The Company follows SFAS No. 143, “Accounting for Asset Retirement Obligations”, which addresses financial accounting and reporting for obligations associated with the retirement of tangible long-lived assets and the associated asset retirement costs. The standard applies to legal obligations associated with the retirement of long-lived assets that result from the acquisition, construction, development and normal use of the asset. SFAS No. 143 requires that the fair value of a liability for an asset retirement obligation be recognized in the period in which it is incurred if a reasonable estimate of fair value can be made. The fair value of the liability is added to the carrying amount of the associated asset and this additional carrying amount is depreciated over the life of the asset. An accretion cost, representing the increase over time in the present value of the liability, is recorded each period in depreciation, depletion and amortization expense. As reclamation work is performed or liabilities are otherwise settled, the recorded amount of the liability is reduced.

        Future remediation costs for inactive mines are accrued based on management’s best estimate at the end of each period of the undiscounted costs expected to be incurred at the site. Such cost estimates include, where applicable, ongoing care and maintenance and monitoring costs. Changes in estimates are reflected in earnings in the period an estimate is revised.

        Foreign Currency: Substantially all assets and liabilities of foreign subsidiaries are translated at exchange rates in effect at the end of each period. Revenues and expenses are translated at the average exchange rate for the period. Foreign currency transaction gains and losses are included in the determination of net income.

11


        Derivative Financial Instruments: The Company accounts for derivative financial instruments in accordance with SFAS No. 133, “Accounting for Derivative Instruments and Hedging Activities,” and SFAS No. 138, “Accounting for Certain Derivative Instruments and Certain Hedging Activities.” These Statements require recognition of all derivatives as either assets or liabilities on the balance sheet and measurement of those instruments at fair value. Appropriate accounting for changes in the fair value of derivatives held is dependent on whether the derivative instrument is designated and qualifies as an accounting hedge and on the classification of the hedge transaction.

        For derivative instruments that are designated and qualify as cash flow hedges, the effective portions of changes in fair value of the derivative are recorded in other comprehensive income (loss), and are recognized in the Statement of Consolidated Operations when the hedged item affects net income (loss) for the period. Ineffective portions of changes in the fair value of cash flow hedges and derivative instruments that are not designated as hedges are recognized currently in earnings. Refer to Note I – Derivative Financial Instruments and Fair Value of Financial Instruments.

        Stock-based Compensation Plans: Effective January 1, 2006, the Company began recording compensation expense associated with awards of equity instruments in accordance with SFAS No. 123(R), “Share-Based Payment”. Prior to January 1, 2006, the Company accounted for awards of equity instruments according to the provisions of SFAS No. 123, “Accounting for Stock-Based Compensation,” and related interpretations, and therefore no related compensation expense was recorded for awards granted with no intrinsic value. The Company adopted the modified prospective transition method provided for under SFAS No. 123(R), and, consequently, has not retroactively adjusted results from prior periods. Under this transition method, compensation cost associated with awards of equity instruments recognized includes: 1) amortization related to the remaining unvested portion of all awards granted for the fiscal years 1995 to 2005, based on the grant date fair value, estimated in accordance with the original provisions of SFAS No. 123, “Accounting for Stock-Based Compensation”; and 2) amortization related to all equity instrument awards granted subsequent to December 31, 2005, based on the grant-date fair value estimated in accordance with the provisions of SFAS No. 123(R). The compensation costs are included in administrative and general expenses, production costs applicable to sales and the cost of self-constructed property, plant and equipment as deemed appropriate.

        The compensation expense recognized in the Company’s consolidated financial statements for the three and six months ended June 30, 2007 for awards of equity instruments was $1.1 million and $1.7 million, respectively, of which $0.1 million and $0.1 million, respectively, was capitalized as part of the mine construction activities. As of June 30, 2007, there was $3.6 million of total unrecognized compensation cost (net of estimated forfeitures) related to unvested stock options, restricted stock grants and performance share grants which is expected to be recognized over a weighted-average vesting period of 2.4 years.

        The Company continues to estimate the fair value of each stock option award on the date of grant using the Black-Scholes option valuation model. The Company now estimates forfeitures of stock based awards based on historical data and adjusts the forfeiture rate periodically. The adjustment of the estimated forfeiture rate will result in a cumulative adjustment in the period the forfeiture estimate is changed.

        Income Taxes: The Company computes income taxes in accordance with SFAS No. 109, “Accounting for Income Taxes.” SFAS No. 109 requires an asset and liability approach which results in the recognition of deferred tax liabilities and assets for the expected future tax consequences or benefits of temporary differences between the financial reporting basis and the tax basis of assets and liabilities, as well as operating loss and tax credit carryforwards, using enacted tax rates in effect in the years in which the differences are expected to reverse.

        In assessing the realizability of deferred tax assets, management considers whether it is more likely than not that some portion or all of the deferred tax assets will not be realized. Management considers the scheduled reversal of deferred tax liabilities, projected future taxable income and tax planning strategies in making this assessment. A valuation allowance has been provided for the portion of the Company’s net deferred tax assets for which it is more likely than not that they will not be realized.

12


        Comprehensive Income: Comprehensive income includes net income (loss) as well as changes in stockholders’ equity that result from transactions and events other than those with stockholders. Items of comprehensive income include the following:

(In Thousands) Three Months
Ended June 30,

Six Months
Ended June 30,

2007
2006
2007
2006

Net income
    $ 11,918   $ 32,648   $ 25,937   $ 46,985  
Unrealized gain on marketable securities    66    20    161    121  
Change in fair value of cash flow  
    hedges, net of settlements    622    (503 )  349    (598 )
Minimum pension liability    --    2,219    --    2,219  
Other    --    --    6    (2 )




    $ 12,606   $ 34,384   $ 26,453   $ 48,725  





Net Income Per Share: The Company follows SFAS No. 128, “Earnings Per Share,” which requires the presentation of basic and diluted earnings per share. Basic earnings per share is computed by dividing net income available to common shareholders by the weighted average number of common shares outstanding during each period. Diluted earnings per share reflect the potential dilution that could occur if securities or other contracts to issue common stock were exercised or converted into common stock. The effect of potentially dilutive stock options and convertible senior notes outstanding in the three and six months ended June 30, 2007 and 2006 are as follows:

Three Months Ended
June 30, 2007

Six Months Ended
June 30, 2007

(In thousands except for EPS) Income
(Numerator)

Shares
(Denominator)

Per-Share
Amount

Income
(Numerator)

Shares
(Denominator)

Per-Share
Amount

Basic EPS                            
  Net income available to common  
  stockholders   $ 11,918    277,763   $ 0.04   $ 25,937    277,720   $ 0.09  

Effect of Dilutive Securities
  
  Equity awards    --    793    --    --    801    --  
  1.25% Convertible Notes    74    23,684    --    148    23,684    --  






Diluted EPS   
  Net income available to common  
  stockholders   $ 11,992    302,240   $ 0.04   $ 26,085    302,205   $ 0.09  








Three Months Ended
June 30, 2006

Six Months Ended
June 30, 2006

(In thousands except for EPS) Income
(Numerator)

Shares
(Denominator)

Per-Share
Amount

Income
(Numerator)

Shares
(Denominator)

Per-Share
Amount

Basic EPS                            
   Net income from continuing operations   $ 20,132    277,474   $ 0.07   $ 33,858    265,049   $ 0.13  
   Income from discontinued operations   $ 12,516    277,474    0.05   $ 13,127    265,049    0.05  




   Income   $ 32,648    277,474   $ 0.12   $ 46,985    265,049   $ 0.18  
Effect of Dilutive Securities   
   Equity awards    --    1,030    --    --    1,099    --  
   1.25% Convertible Notes    338    23,684    --    822    23,684    --  






Diluted EPS   
   Net income from continuing operations   $ 20,470    302,188   $ 0.07   $ 34,680    289,832   $ 0.12  
   Income from discontinued operations   $ 12,516    302,188    0.04   $ 13,127    289,832    0.04  




   Income   $ 32,986    302,188   $ 0.11   $ 47,807    289,832   $ 0.16  




        For the three and six months ended June 30, 2007, options to purchase 1,502,448 shares of common stock at prices between $3.92 and $8.94 and options to purchase 626,284 shares of common stock at prices between $4.81 to $8.94, respectively, were not included in the computation of diluted EPS because the exercise price of the options was greater than the average market price of the common shares. The options which expire between 2007 to 2017 are outstanding at June 30, 2007.

13


        Debt Issuance Costs: Costs associated with the issuance of debt are included in other noncurrent assets and are amortized over the term of the related debt.

        Use of Estimates: The preparation of the Company’s consolidated financial statements in conformity with accounting principles generally accepted in the United States of America requires management to make estimates and assumptions that affect the amounts reported in their consolidated financial statements and accompanying notes. The areas requiring the use of management’s estimates and assumptions relate to recoverable ounces from proven and probable reserves that are the basis of future cash flow estimates and units-of-production depreciation and amortization calculations; useful lives utilized for depreciation, depletion and amortization; estimates of future cash flows for long lived assets; estimates of recoverable gold and silver ounces in ore on leach pad; the amount and timing of reclamation and remediation costs; valuation allowance for deferred tax assets; and post-employment and other employee benefit liabilities. Actual results could differ from these estimates.

        Reclassifications: Certain prior years have been made to conform to the current year presentation. These reclassifications had no impact on the Company’s consolidated financial position, results of operations or cash flows for the periods presented. The most significant reclassifications were to reclassify investments in auction rate securities from cash and cash equivalents to short-term investments and corresponding adjustments to the consolidated statements of cash flows for the periods ended June 30, 2006.

        Recent Accounting Pronouncements: In February 2007, the FASB issued FASB Statement No. 159, “The Fair Value Option for Financial Assets and Financial Liabilities” (“FAS 159”). FAS 159 permits entities to choose to measure many financial instruments and certain other items at fair value, with the objective of improving financial reporting by mitigating volatility in reported earnings caused by measuring related assets and liabilities differently without having to apply complex hedge accounting provisions. The provisions of FAS 159 are effective for the Company’s fiscal year ending December 31, 2008. The Company is currently evaluating the impact that the adoption of this statement will have on the Company’s consolidated financial position, results of operations and disclosures.

        In September 2006, the FASB issued FASB Statement No. 157 “Fair Value Measurements” (FAS 157). FAS 157 defines fair value, establishes a framework for measuring fair value in generally accepted accounting principles, and expands disclosures about fair value measurements. The provisions of FAS 157 are effective for the Company’s fiscal year ending December 31, 2008. The Company is currently evaluating the impact of the adoption of this statement on the Company’s consolidated financial position, results of operations and disclosures.

        In June 2006, the FASB issued Interpretation No. 48, “Accounting for Uncertainty in Income Taxes”, (FIN 48) an Interpretation of FASB Statement No. 109, “Accounting for Income Taxes”. FIN 48 prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of tax positions taken or expected to be taken in a tax return. FIN 48 requires that the Company recognize in its financial statements the impact of a tax position, if that tax position is more likely than not of being sustained on audit, based on the effective technical merits of the position. FIN 48 also provides guidance on derecognition, classification of interest and penalties, accounting in interim periods and disclosure. The provisions of FIN 48 were adopted beginning January 1, 2007. The adoption of FIN 48 did not have a material effect on the Company’s financial position, results of operations or cash flows.

        The Company and its subsidiaries are subject to U.S. federal income tax as well as income tax of multiple state and foreign jurisdictions. The Company has substantially concluded all U.S. federal income tax matters for years through 1999. Federal income tax returns for 2000 through 2005 are subject to examination. The Company’s continuing practice is to recognize interest and/or penalties related to income tax matters in income tax expense. There were no significant accrued interest or penalties at June 30, 2007.

14


NOTE C — METAL AND OTHER INVENTORIES

        Inventories consist of the following:

June 30,
2007

December 31,
2006

(in thousands)

Concentrate and dore inventory
    $ 11,371   $ 9,680  
Supplies    6,982    6,661  


Metal and other inventories   $ 18,353   $ 16,341  


NOTE D – DISCONTINUED OPERATIONS AND ASSETS AND LIABILITIES HELD FOR SALE

        During the first quarter of 2006, the Company committed to a plan to sell Coeur Silver Valley Inc. (“CSV”), a wholly owned subsidiary of Coeur d’Alene Mines Corporation, that owns and operates the Galena underground silver mine and adjoining properties in Northern Idaho. On April 10, 2006, the Company announced that it had entered into an agreement to sell 100% of the shares of CSV to U.S. Silver Corporation for $15 million in cash. On June 1, 2006, the Company completed the sale of 100% of CSV to U.S. Silver Corporation for a total of $15 million in cash, plus a post closing working capital adjustment of $1.1 million. The Company recorded, within discontinued operations, a gain of approximately $11.2 million in the quarter ended June 30, 2006. Pursuant to SFAS No. 144, “Accounting for the Impairment or Disposal of Long-Lived Assets,” CSV was classified as held for sale and the results of its operations reported in discontinued operations for the period ended June 30, 2006.

        The following table details selected financial information included in income from discontinued operations in the consolidated statements of operations for the three and six months ended June 30, 2006 (in thousands):

Three Months
Ended June 30,
2006

Six Months
Ended June 30,
2006

Sales of metal     $ 5,513   $ 11,223  
Production costs applicable to sales    (3,973 )  (8,233 )
Depreciation and depletion    (86 )  (681 )
Mining exploration    (69 )  (279 )
Other    (28 )  (62 )


Income from discontinued operations   $ 1,357   $ 1,968  
Gain on sale of net assets of discontinued operations    11,159    11,159  


Net income from discontinued operations   $ 12,516   $ 13,127  



NOTE E — STOCK-BASED COMPENSATION PLANS

        The Company has an Annual Incentive Plan, a Long-Term Incentive Plan (the “2003 Long-Term Incentive Plan”) and the 2005 Non-Employee Directors’ Equity Incentive Plan (“2005 Non-Employee Directors’ Plan”). Total employee compensation expense charged to operations and capital projects under these Plans was $1.7 million, $3.1 million, $1.2 million and $2.3 million for the three and six months ended June 30, 2007 and 2006, respectively.

15


Annual Incentive Plan

        Under the Annual Incentive Plan, the Board of Directors may annually approve cash-based awards to the executive officers and salaried employees based on certain Company and employee performance measures. Cash payments for the six months ended June 30, 2007 and 2006, amounted to $2.2 million and $2.7 million, respectively.

Long-Term Incentive Plan

        The 2003 Long-Term Incentive Plan (the “LTIP”) was approved by our shareholders on May 20, 2003, and replaced our prior 1989 Long-Term Incentive Plan. Under the plan, we may grant nonqualified stock options, incentive stock options, stock appreciation rights (“SARs”), restricted stock, restricted stock units, performance shares, performance units, cash-based awards and other stock-based awards to our executive officers.

        The number of shares authorized for grant under this plan was 6.8 million shares. There were 5.8 million shares reserved for issuance under this plan at June 30, 2007. Of the 5.8 million shares, 3.9 million shares can be issued for future grants. There are 1.4 million options and 0.5 million performance shares outstanding under this plan. Under the previous long-term incentive plan, the number of shares authorized to be issued was 2.9 million. There were 0.6 million shares reserved for issuance at June 30, 2007 for stock options previously awarded. No further awards will be made under this plan.

Non-Employee Directors’ Equity Incentive Plan

        On June 3, 2005, the Company’s shareholders approved the 2005 Non-Employee Directors’ Equity Incentive Plan and authorized 500,000 shares of common stock for issuance under the plan. During the six months ended June 30, 2007 and 2006, 59,476 and 35,042 shares were issued in lieu of $0.2 million and $0.2 million, respectively, of Directors’ fees. At June 30, 2007, 0.4 million shares are reserved for issuance under this plan. Under the previous Directors’ plan, options were granted only in lieu of annual directors’ fees. At June 30, 2007, 0.5 million shares are reserved for issuance under this plan for stock options previously awarded. No further grants of options will be made under this plan.

        As of June 30, 2007 and 2006, options to purchase 2,467,561 shares and 2,186,264 shares of common stock, respectively, were outstanding under the LTIP and the Directors’ Plans described above. The options are exercisable at prices ranging from $0.74 to $8.94 per share.

        Stock options granted under the Company’s incentive plans vest over three years and are exercisable over a period not to exceed ten years from the grant date. Exercise prices are equal to the fair market value of the shares on the date of the grant. The value of each option award is estimated on the date of the grant using the Black-Scholes option pricing model.

        Restricted stock grants are based on the fair market value of the underlying shares on the date of grant and vest in equal installments annually over three years. Holders of the restricted stock are entitled to vote the shares and to receive any dividends declared on the shares.

        Performance share grants are based on the fair market value of the underlying shares on the date of grant. Vesting is contingent on meeting certain performance measures based on relative total shareholder return. The performance shares vest at the end of the three-year service period. Performance share grants under the plan initially assume that the performance measure will be achieved. If such performance measures are not met, no further compensation cost is recognized and, if determined improbable of achieving the performance measures, any previously recognized compensation is reversed.

16


        Effective January 1, 2006, the Company began recording compensation expense associated with awards of equity instruments in accordance with Statement of Financial Accounting Standards (“SFAS”) No. 123(R), “Share-Based Payment”. Prior to January 1, 2006, the Company accounted for awards of equity instruments according to the provisions of SFAS No. 123 and related interpretations, and therefore no related compensation expense was recorded for awards granted with no intrinsic value. The Company adopted the modified prospective transition method provided for under SFAS No. 123(R), and, consequently, has not retroactively adjusted results from prior periods. Under this transition method, compensation cost associated with awards of equity instruments recognized includes: 1) amortization related to the remaining unvested portion of all awards granted for the fiscal years 1995 to 2005, based on the grant date fair value, estimated in accordance with the original provisions of SFAS No. 123, “Accounting for Stock-Based Compensation”; and 2) amortization related to all equity instrument awards granted subsequent to December 31, 2005, based on the grant-date fair value estimated in accordance with the provisions of SFAS No. 123(R). The compensation cost is included in administrative and general expenses, production costs and the cost of self-constructed property, plant and equipment as deemed appropriate.

        Prior to the Company’s adoption of SFAS No. 123(R), benefits of tax deduction in excess of recognized compensation costs were reported as operating cash flows. SFAS No. 123(R) requires excess tax benefits be reported as a financing cash inflow rather than as a reduction of taxes paid. There were no significant excess tax benefits for the three and six months ended June 30, 2007 and 2006.

        The compensation expense recognized in the Company’s consolidated financial statements for the three and six months ended June 30, 2007 for awards of equity instruments was $1.1 million and $1.7 million, respectively, of which $0.1 million and $0.1 million, respectively, was capitalized as part of the mine construction activities. As of June 30, 2007, there was $3.6 million of total unrecognized compensation cost (net of estimated forfeitures) related to unvested stock options, restricted stock grants and performance share grants which is expected to be recognized over a weighted-average vesting period of 2.4 years.

        The impact of adopting SFAS No. 123(R) as of January 1, 2006 resulted in a decrease in net income of $0.3 million, or less than $0.01 per basic and diluted share, for the six months ended June 30, 2006. The impact of adoption excludes the amortization of restricted stock awards in the amount of $0.6 million for the six months ended June 30, 2006. Compensation expense related to the amortization of restricted stock awards was recognized prior to the implementation of SFAS No. 123(R). Cash received from share options exercised under the LTIP for the six months ended June 30, 2007 and 2006 was $0 and $0.6 million, respectively, and is reflected as an other financing activity in the Company’s consolidated statements of cash flows.

        The weighted average fair value of stock options on the date of grant, and the assumptions used to estimate the fair value of the stock options using the Black-Scholes option valuation model were as follows:

Six Months Ended
June 30,
2007
2006
Weighted average fair value of options granted     $ 2.35   $ 3.35  
Expected volatility    58.9 %  68.5 %
Expected life    6 year s  6 year s
Risk-free interest rate    4.5 %  4.6 %
Expected dividend yield    --    --  

        The expected volatility of the option is determined using historical volatilities based on historical stock prices. The Company estimated the expected life of options granted using the midpoint between the vesting date and the original contractual term. The risk free rate was determined using the yield available on U.S. Treasury Zero-coupon issues with a remaining term equal to the expected life of the option. The Company has not paid dividends on its common stock since 1996.

17


        The following table summarizes stock option activity during the six months ended June 30, 2007:

Shares
Weighted Average
Exercise Price

Stock options outstanding at December 31, 2006       2,089,650   $ 3.56  
Granted    462,015    3.99  
Canceled/expired    (84,104 )  6.45  


Stock options outstanding at June 30, 2007    2,467,561   $ 3.54  


        Options exercisable at June 30, 2007, were 1,705,171 with a weighted average exercise price of $3.21. At June 30, 2007, the total intrinsic value was $2.0 million for stock options outstanding and exercisable.

        As of June 30, 2007, the total future compensation cost related to non-vested options not yet recognized in the statement of income was $0.9 million and the weighted average period over which these awards are expected to be recognized was 2.3 years.

        The following table summarizes restricted stock activity during the six months ended June 30, 2007:

Number of
Shares

Weighted
Average Grant
Date Fair Value

Outstanding at December 31, 2006       413,032   $ 4.83  
Granted    497,990    3.99  
Vested    (190,156 )  4.99  
Canceled/Expired    (43,732 )  4.32  


Outstanding at June 30, 2007    677,134   $ 4.20  


        The fair value of restricted stock is determined based on the closing stock price on the grant date. As of June 30, 2007, there was $1.5 million of total unrecognized compensation cost related to restricted awards to be recognized over a weighted-average period of 2.5 years.

        The following table summarizes performance shares activity during the six months ended June 30, 2007:

Number of
Shares

Weighted
Average Grant
Date Fair Value

Outstanding at December 31, 2006       210,445   $ 5.14  
Granted    306,852    3.99  
Canceled/Expired    (45,783 )  4.47  


Outstanding at June 30, 2007    471,514   $ 4.46  


        The fair value of performance shares is determined based on the closing price on the grant date. As of June 30, 2007, there was $1.2 million of total unrecognized compensation cost related to performance shares to be recognized over a weighted average period of 2.3 years.

18


NOTE F- INCOME TAXES

        The Company computes income taxes in accordance with SFAS No. 109, “Accounting for Income Taxes.” SFAS No. 109 requires an asset and liability approach which results in the recognition of deferred tax liabilities and assets for the expected future tax consequences of temporary differences between the carrying amounts and the tax basis of those assets and liabilities, as well as net operating loss and tax credit carryforwards, using enacted tax rates in effect in the years in which the differences are expected to reverse. The Company has U.S. net operating loss carryforwards which expire in 2008 through 2025. Net operating losses in foreign countries have an indefinite carryforward period.

        For the six months ended June 30, 2007, the Company reported an income tax provision of approximately $6.9 million compared to an income tax provision of $2.5 million at June 30, 2006. The following table summarizes the components of the Company’s income tax provision for the three and six months ended June 30, 2007 and 2006:

Three Months Ended
June 30,

Six Months Ended
June 30,

2007
2006
2007
2006
Current:                    
    United States - Alternative minimum tax   $ (76 ) $ (369 ) $ (309 ) $ (469 )
    United States - Foreign withholding    (283 )  (169 )  (666 )  (492 )
    Foreign - Argentina    (1,308 )  (1,900 )  (2,906 )  (2,511 )
    Foreign - Australia    (659 )  (1,449 )  (1,773 )  (2,141 )
Deferred:  
    Foreign - Argentina    (349 )  279    (174 )  492  
    Foreign - Australia    (461 )  425    (361 )  199  
    Foreign - Chile    (91 )  354    (739 )  2,441  




    Income tax provision   $ (3,227 ) $ (2,829 ) $ (6,928 ) $ (2,481 )




        The income tax provision for the six months ended June 30, 2007 and 2006 varies from the statutory rate primarily because of differences in tax rates for the Company’s foreign operations and changes in valuation allowances for net deferred tax assets. During the six months ended June 30, 2007, the Company recorded $0.5 million in additional income tax provision resulting from its assessment of prior period tax contingencies across its various tax jurisdictions.

NOTE G- SEGMENT REPORTING

        Operating segments are defined as components of an enterprise about which separate financial information is available that is evaluated regularly by the chief operating decision maker, or decision-making group, in deciding how to allocate resources and in assessing performance. The Company’s chief operating decision-making group is comprised of the Chief Executive Officer, Chief Financial Officer, the Senior Vice President of North American Operations and the President of South American Operations.

        The operating segments are managed separately because each segment represents a distinct use of company resources which contribute to Company cash flows in its respective geographic area. The Company’s reportable operating segments include the Rochester, Cerro Bayo, Martha, San Bartolome, Kensington and CDE Australia (Endeavor and Broken Hill) mining properties. On June 1, 2006, the Company completed its sale of Coeur Silver Valley (Galena). For the period ending June 30, 2006, CSV was reported in discontinued operations (see Note D). All operating segments are engaged in the discovery and/or mining of gold and silver and generate the majority of their revenues from the sale of these precious metal concentrates and/or refined precious metals. The Cerro Bayo and Martha mines sell precious metal concentrates, typically under long-term contracts, to smelters located in Japan (Sumitomo Corporation and Dowa Mining Ltd.), Mexico (Met-Mex Penoles) and Germany (Nordeutsche). Refined gold and silver produced by the Rochester mine is principally sold on a spot basis to precious metals trading banks such as Standard Bank and Mitsui. Concentrates produced at CDE Australia (Endeavor and Broken Hill mines) are sold by the mines’ operators to Zinifex, an Australia smelter. The Company’s exploration programs are reported under the “other” segment. The other segment also includes the corporate headquarters, elimination of intersegment transactions and other items necessary to reconcile to consolidated amounts. The accounting policies of the operating segments are the same as those described in the summary of significant accounting policies above. The Company evaluates performance and allocates resources based on profit or loss before interest, income taxes, depreciation and amortization, unusual and infrequent items, and extraordinary items.

19


        Segment operating results and capital expenditures for the three and six months ended June 30, 2007 and segment assets as of June 30, 2007 were as follows:

Segment Reporting
(In Thousands)

Rochester
Mine

Cerro Bayo
Mine

Martha
Mine

Endeavor
Broken
Hill

San
Bartolome

Kensington
Corporate
and
Other

Total
Three Months Ended
June 30, 2007

Sales of metal
      24,835     9,987     10,053     1,495     5,294     --     --     --     51,664  
Segment profit (loss)    11,660    1,188    5,042    1,363    4,416    --    (34 )  (2,654 )  20,981  

Depreciation and depletion
    2,764    1,411    401    122    934    --    --    121    5,753  
Interest income    --    304    17    --    --    --    --    3,878    4,199  
Interest expense    --    8    --    --    --    --    --    75    83  
Income tax (benefit) expense    --    91    1,665    --    --    --    (10 )  1,481    3,227  

Segment assets (A)
    85,035    49,464    13,250    16,341    28,425    98,353    266,582    13,298    570,748  
Capital expenditures    92    3,815    3,001    94    212    16,406    33,713    368    57,701  



Rochester
Mine

Cerro Bayo
Mine

Martha
Mine

Endeavor
Broken
Hill

San
Bartolome

Kensington
Corporate
and
Other

Total
Three Months Ended
June 30, 2006

Sales of metal
    $ 25,613   $ 11,560   $ 9,804   $ 770   $ 6,294   $ --   $ --   $ --   $ 54,041  
Segment profit (loss)    15,136    5,279    5,292    734    5,484    --    (83 )  (1,056 )  30,786  

Depreciation and depletion
    3,480    1,580    306    105    1,452    --    --    66    6,989  
Interest income    --    123    --    --    --    --    --    4,614    4,737  
Interest expense    --    22    --    --    --    --    --    345    367  
Litigation settlement    --    --    --    --    --    --    --    (469 )  (469 )
Income tax (benefit) expense    --    (354 )  1,592    --    --    --    --    1,591    2,829  

Segment assets (A)
    84,549    42,871    11,447    15,316    34,059    37,280    129,883    7,331    362,736  
Capital expenditures    584    1,814    694    --    --    1,521    20,928    137    25,677  



Rochester
Mine

Cerro Bayo
Mine

Martha
Mine

Endeavor
Broken
Hill

San
Bartolome

Kensington
Corporate
and
Other

Total
Six Months Ended
June 30, 2007

Sales of metal
     52,279    19,768    18,065    3,374    9,020    --    --    --    102,524  
Segment profit (loss)    27,419    6,283    7,403    3,086    7,559    --    (196 )  (5,238 )  46,316  

Depreciation and depletion
    7,180    2,802    751    279    1,528    --    --    234    12,774  
Interest income    --    588    14    --    --    --    --    8,051    8,653  
Interest expense    --    19    --    --    --    --    --    151    170  
Litigation settlement    --    --    --    --    --    --    --    (507 )  (507 )
Income tax expense    --    739    3,161    --    --    --    10    3,018    6,928  

Segment assets (A)
    85,035    49,464    13,250    16,341    28,425    98,353    266,582    13,298    570,748  
Capital expenditures    1,105    5,758    3,630    2,112    212    27,704    58,631    552    99,704  


20



Rochester
Mine

Cerro Bayo
Mine

Martha
Mine

Endeavor
Broken
Hill

San
Bartolome

Kensington
Corporate
and
Other

Total
Six Months Ended
June 30, 2006

Sales of metal
    $ 47,817   $ 22,274   $ 15,231   $ 1,336   $ 12,237   $ --   $ --   $ --   $ 98,895  
Segment profit (loss)    25,596    10,601    7,269    1,242    9,832    (3 )  (90 )  (3,444 )  51,003  

Depreciation and depletion
    6,518    2,902    548    215    2,985    --    --    139    13,307  
Interest income    --    171    4    --    --    --    --    7,506    7,681  
Interest expense    --    49    --    --    --    --    --    839    888  
Litigation settlement    --    --    --    --    --    --    --    (469 )  (469 )
Income tax (benefit) expense    --    (2,441 )  2,083    --    --    --    --    2,839    2,481  

Segment assets (A)
    84,549    42,871    11,447    15,316    34,059    37,280    129,883    7,331    362,736  
Capital expenditures    743    2,914    1,377    --    --    3,465    44,680    305    53,484  

(A)     Segment assets consist of receivables, prepaids, inventories, property, plant and equipment, and mining properties

        The following tables reconcile total segment profit and segment assets to those presented in the Company’s consolidated financial statements:

(In Thousands) Three Months Ended June 30,
Six Months Ended June 30,
2007
2006
2007
2006
Income from continuing operations before                    
 income taxes   
Total segment profit   $ 20,981   $ 30,786   $ 46,316   $ 51,003  
Depreciation and amortization    (5,753 )  (6,989 )  (12,774 )  (13,307 )
Interest expense    (83 )  (367 )  (170 )  (888 )
Litigation settlements    --    (469 )  (507 )  (469 )




    Income from continuing operations before  
     income taxes   $ 15,145   $ 22,961   $ 32,865   $ 36,339  






As of June 30,
2007
2006
Assets            
Total assets for reportable segments   $ 570,748   $ 362,736  
Cash and cash equivalents    236,232    373,392  
Short-term investments    36,270    19,896  
Other assets    40,662    38,059  


        Total consolidated assets   $ 883,912   $ 794,083  


21


Geographic Information

Three Months Ended
June 30, 2007
Revenues
Long-Lived
Assets


United States
    $ 24,835   $ 271,737  
Australia    6,789    44,774  
Chile    9,987    23,546  
Argentina    10,053    6,575  
Bolivia    --    88,636  
Other Foreign Countries    --    197  


    Total   $ 51,664   $ 435,465  




Three Months Ended
June 30, 2006
Revenues
Long-Lived
Assets


United States
    $ 25,613   $ 144,640  
Australia    7,064    46,665  
Chile    11,560    19,688  
Argentina    9,804    3,402  
Bolivia    --    36,538  
Other Foreign Countries    --    217  


    $ 54,041   $ 251,150  




Six Months Ended
June 30, 2007
Revenues
Long-Lived
Assets


United States
    $ 52,297   $ 271,737  
Australia    12,394    44,774  
Chile    19,768    23,546  
Argentina    18,065    6,575  
Bolivia    --    88,636  
Other Foreign Countries    --    197  


    Total   $ 102,524   $ 435,465  




Six Months Ended
June 30, 2006
Revenues
Long-Lived
Assets


United States
    $ 47,817   $ 144,640  
Australia    13,573    46,665  
Chile    22,274    19,689  
Argentina    15,231    3,402  
Bolivia    --    36,538  
Other Foreign Countries    --    217  


    Total   $ 98,895   $ 251,150  


NOTE H- RECLAMATION AND REMEDIATION

        Reclamation and remediation costs are based principally on legal and regulatory requirements. Management estimates costs associated with reclamation of mining properties as well as remediation cost for inactive properties. The Company uses assumptions about future costs, mineral prices, mineral processing recovery rates, production levels and capital and reclamation costs. Such assumptions are based on the Company’s current mining plan and the best available information for making such estimates. On an ongoing basis, management evaluates its estimates and assumptions; however, actual amounts could differ from those based on such estimates and assumptions.

22


        Changes to the Company’s asset retirement obligations are as follows:

Three Months
Ended June 30,
Six Months
Ended June 30,
2007
2006
2007
2006
(in thousands)

Beginning balance
    $ 30,168   $ 23,800   $ 29,909   $ 23,524  
Accretion    565    445    1,130    890  
Settlements    (86 )  (388 )  (392 )  (537 )




Ending balance   $ 30,647   $ 23,877   $ 30,647   $ 23,877  




        In addition, the Company has accrued $1.6 million and $0.9 million as of June 30, 2007 and 2006, respectively, for reclamation liabilities related to former mining activities. These amounts are also included in reclamation and mine closure liabilities.

NOTE I — DERIVATIVE FINANCIAL INSTRUMENTS AND FAIR VALUE OF FINANCIAL INSTRUMENTS

        The Company enters into derivative instruments to manage the Company’s exposure to foreign currency exchange rates and market prices associated with changes in gold and silver commodity prices. The Company accounts for its derivative contracts in accordance with SFAS No. 133, “Accounting for Derivative Instruments and Hedging Activities,” as amended. Accordingly, unrealized gains and losses related to the change in fair market value of derivative contracts, which qualify and are designated as cash flow hedges, are recorded as other comprehensive income or loss and such amounts are recognized in earnings as the associated contracts are settled.

Forward Foreign Exchange Contracts

        The Company, from time to time, enters into forward foreign currency exchange contracts to reduce the foreign exchange risk associated with forecasted Chilean peso operating costs for 2007 at its Cerro Bayo mine. The contracts require the Company to exchange U.S. dollars for Chilean pesos at a weighted average exchange rate of 535 pesos to each U.S. dollar. At June 30, 2007, the Company had foreign exchange contracts covering $3.9 million U.S. dollars which settles monthly throughout the remainder of 2007. For the six months ended June 30, 2007 and June 30, 2006, the Company recorded a realized (gain) loss of approximately ($26,000) and $149,000, respectively in connection with its foreign currency hedging program. As of June 30, 2007, the fair value of the foreign exchange contracts was an asset of $0.3 million. Change in gains (losses) accumulated in other comprehensive income (loss) for cash flow hedging contracts are as follows:

For the Three Months
Ended June 30,
For the Six Months
Ended June 30,
2007
2006
2007
2006
(in thousands)

Beginning balance
    $ (333 ) $ (267 ) $ (60 ) $ (171 )
Reclassification to earnings    (49 )  96    (26 )  149  
Change in fair value    671    (598 )  375    (747 )




Ending balance   $ 289   $ (769 ) $ 289   $ (769 )




Commodity Derivatives

        The Company has occasionally entered into forward metal sales contracts to manage the price risk on a portion of its cash flows against fluctuating gold prices. As of June 30, 2007, the Company had no outstanding forward sales contracts for either gold or silver. For metal delivery contracts, the realized price pursuant to the contract is recognized when physical gold or silver is delivered in satisfaction of the contract.

23


Concentrate Sales Contracts

        The Company enters into concentrate sales contracts with third-party smelters. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices and the provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative, which is the final settlement price based on a future price, does not qualify for hedge accounting. These embedded derivatives are recorded as derivative assets (in prepaid expenses and other), or derivative liabilities (in other current liabilities), on the balance sheet and are adjusted to fair value through earnings each period until the date of final settlement.

        At June 30, 2007 the Company had outstanding receivables for provisionally priced sales of $73.1 million, consisting of 3.8 million ounces of silver and 34,159 ounces of gold, which had a fair value of approximately $73.1 million, including the embedded derivative.

NOTE J- LONG-TERM DEBT

1 ¼% Senior Convertible Notes

        The $180.0 million principal amount of 1 ¼% Senior Convertible Notes due January 2024 outstanding at June 30, 2007 are convertible into shares of common stock at the option of the holder on January 15, 2011, 2014 and 2019, unless previously redeemed, at a conversion price of $7.60 per share, subject to adjustment in certain events.

        The Company is required to make semi-annual interest payments. The Senior Convertible Notes are redeemable at the option of the Company before January 18, 2011, if the closing price of the Company’s common stock over a specified number of trading days has exceeded 150% of the conversion price, and anytime thereafter. Before January 18, 2011, the redemption price is equal to 100% of the principal amount of the notes plus an amount equal to 8.75% of the principal amount of the notes, less the amount of any interest actually paid on the notes on or prior to the redemption date. The Senior Convertible Notes are due at maturity on January 15, 2024.

        The fair value of the Senior Convertible Notes is determined by market transactions on or near June 30, 2007 and December 31, 2006, respectively. The fair value of the Senior Convertible Notes as of June 30, 2007 and December 31, 2006 was $159.5 million and $163.8 million, respectively.

NOTE K- DEFINED CONTRIBUTION, 401(k), DEFINED BENEFIT AND POST-RETIREMENT MEDICAL PLANS

Defined Contribution Plan and 401(k) Plan

        The Company provides a noncontributory defined contribution retirement plan for all eligible U.S. employees. Total plan expenses recognized in the Company’s consolidated financial statements were $0.2 million and $0.3 million for the three months ended June 30, 2007 and 2006, respectively, and plan expenses charged to operations for the six months ended June 30, 2007 and 2006 were $0.5 million and $0.6 million, respectively.

        The Company maintains a savings plan (which qualifies under Section 401(k) of the U.S. Internal Revenue Code) covering all eligible U.S. employees. Under the plan, employees may elect to contribute up to 100% of their cash compensation, subject to ERISA limitations. The Company is required to make matching cash contributions equal to 50% of the employees’ contribution to a maximum of 3% of the employees’ compensation. Employees have the option of investing in thirteen different types of investment funds. Total plan expenses recognized in the Company’s consolidated financial statements were $0.1 million and $0.1 million for the three months ended June 30, 2007 and 2006, respectively, and plan expenses charged to operations for the six months ended June 30, 2007 and 2006 were $0.4 million and $0.3 million, respectively.

24


        As a result of the sale of Coeur Silver Valley, the Company no longer maintains a post-retirement medical or defined benefit pension plans.

NOTE L- COMMITMENTS AND CONTINGENCIES

Labor Union Contracts

        The Company maintains two labor agreements in South America, consisting of a labor agreement with Syndicato de Trabajadores de Compañía Minera Cerro Bayo Ltd. at its Cerro Bayo mine in Chile and with Associacion Obrera Minera Argentina at its Martha mine in Argentina. The agreement at Cerro Bayo is effective from December 22, 2005 to December 21, 2007 and the agreement at Mina Martha is effective from June 11, 2007 to June 10, 2008. As of June 30, 2007, the Company had approximately 22% of its worldwide labor force covered by collective bargaining agreements.

Termination Benefits

        In September 2005, the Company established a one-time termination benefit program at the Rochester mine as the mine approaches the end of its mine life. The employees will be required to render service until they are terminated in order to be eligible for benefits. Approximately 80% of the workforce is expected to be severed by the third quarter of 2007, while the remaining 20% are expected to stay on for residual leaching and reclamation activities. As of June 30, 2007, the total amount expected to be incurred under this plan is approximately $3.2 million. The liability is recognized ratably over the minimum future service period with a corresponding charge to production expense. The amount accrued as of June 30, 2007 was $2.2 million.

Three Months Ended
June 30,
Six Months Ended
June 30,
2007
2006
2007
2006
(in thousands) (in thousands)

Beginning Balance
    $ 2,009   $ 986   $ 1,959   $ 542  
Accruals    502    197    641    936  
Payments    (330 )  (64 )  (419 )  (359 )




Ending Balance   $ 2,181   $ 1,119   $ 2,181   $ 1,119  




NOTE M- SIGNIFICANT CUSTOMERS

        The Company markets its metals products and concentrates primarily to bullion trading banks and five third party smelters. These customers then sell the metals to end users for use in industry applications such as electronic circuitry, jewelry and silverware production and the manufacture and development of photographic film. Sales of metals to bullion trading banks amounted to approximately 51.0% and 48.4% of total metals sales for the six months ended June 30, 2007 and 2006, respectively. Generally, the loss of a single bullion trading bank customer would not adversely affect the Company in view of the liquidity of the markets and availability of alternative trading banks.

        The Company currently markets its silver and gold concentrates to third party smelters in Japan, Mexico, Australia and Germany. Sales of metals concentrates to third party smelters amounted to approximately 49.0% and 51.6% of metals sales for the six months ended June 30, 2007 and 2006, respectively. The loss of any one smelter customer could have a material adverse effect in the event of the possible unavailability of alternative smelters.

25


NOTE N- LITIGATION AND OTHER EVENTS

Federal Natural Resources Action

          On March 22, 1996, an action was filed in the United States District Court for the District of Idaho by the United States against various defendants, including the Company, asserting claims under CERCLA and the Clean Water Act for alleged damages to federal natural resources in the Coeur d’Alene River Basin of Northern Idaho. The damages are claimed to result from alleged releases of hazardous substances from mining activities conducted in the area since the late 1800s.

        In May 2001, the Company and representatives of the U.S. Government, including the Environmental Protection Agency, the Department of Interior and the Department of Agriculture, reached an agreement to settle the lawsuit. The terms of settlement, which have been fully satisfied by the Company as of June 30, 2007, are set forth in a Consent Decree issued by the court. Pursuant to the terms of the Consent Decree, dated May 14, 2001, the Company paid the U.S. Government a total of approximately $3.9 million in 2001. In addition, the Company (i) will pay the United States 50% of any future recoveries from insurance companies for claims for defense and indemnification under general liability insurance policies in excess of $0.6 million, (ii) has accomplished certain cleanup work on the Mineral Point property and Caladay property, and (iii) has made a conveyance to the U.S. of certain real property to be used as a waste repository. Finally, commencing five years after effectiveness of the settlement (or May 14, 2006), the Company was obligated to pay royalties on all of its domestic and foreign operating properties, up to a cumulative of $3 million, amounting to a 2% net smelter royalty on silver production if the price of silver exceeds $6.50 per ounce, and a $5.00 per ounce royalty on gold production if the price of gold exceeds $325 per ounce. The royalty payment obligation commenced on May 14, 2006 and was to expire May 14, 2021. A total of $0.5 million and $2.5 million was paid in 2007 and 2006, respectively. As of June 30, 2007, the entire $3.0 million has been paid. The Company does not anticipate that there will be any future recoveries from insurance companies. Therefore, the terms of settlement have been fully satisfied.

States of Maine, Idaho And Colorado Superfund Sites Related to Callahan Mining Corporation

        During 2001, the United States Forest Service (“USFS”) made a formal request for information regarding the Deadwood Mine Site located in central Idaho. Callahan Mining Corporation had operated at this site during the 1940‘s. The USFS believes that some cleanup action is required at the location. However, Coeur d’Alene Mines Corporation did not acquire Callahan until 1991, more than 40 years after Callahan disposed of its interest in the Deadwood property. The Company did not make any decisions with respect to generation, transport or disposal of hazardous waste at the site. Therefore, it is believed that the Company is not liable for any cleanup, and if Callahan might be liable, it has no substantial assets with which to satisfy any such liability. To date, no claim has been made by the United States for any cleanup costs against either the Company or Callahan.

        During 2002, the EPA made a formal request for information regarding a Callahan mine site in the State of Maine. Callahan operated there in the late 1960‘s, shut the operations down in the early 1970‘s and disposed of the property. The EPA contends that some cleanup action is warranted at the site, and listed it on the National Priorities List in late 2002. The Company believes that because it made no decisions with respect to generation, transport or disposal of hazardous waste at this location, it is not liable for any cleanup costs. If Callahan might have liability, it has no substantial assets with which to satisfy such liability. To date, no claim has been made for any cleanup costs against either the Company or Callahan.

26


        In January 2003, the USFS made a formal request for information regarding a Callahan mine site in the State of Colorado known as the Akron Mine Site. Callahan operated there in approximately the late 1930s through the 1940s, and to the Company’s knowledge, disposed of the property. The Company is not aware of what, if any, cleanup action the USFS is contemplating. However, the Company did not make decisions with respect to generation, transport or disposal of hazardous waste at this location, and therefore believes it is not liable for any cleanup costs. If Callahan might have liability, it has no substantial assets with which to satisfy such liability. To date, no claim has been made for any cleanup costs against either the Company or Callahan.

Federal District Court of Alaska Permit Challenge

        On September 12, 2005 three environmental groups (“Plaintiffs”) filed a lawsuit in Federal District Court in Alaska the (“District Court”) against the U.S. Army Corps of Engineers (“Corps of Engineers”) and the U.S. Forest Service (“USFS”) seeking to invalidate the permit issued to Coeur Alaska, Inc. for the Company’s Kensington mine. The Plaintiffs claim the Clean Water Act (CWA) Section 404 permit issued by the Corps of Engineers authorizing the deposition of mine tailings into Lower Slate Lake conflicts with the CWA and is thus illegal. They additionally claim the USFS’s approval of the Amended Plan of Operations is arbitrary and capricious because it relies on the 404 permit issued by the Corps of Engineers.

        Following District Court’s remand of the Section 404 permit to the Corps of Engineers for further review, the Corps reinstated the Company’s permit on March 29, 2006. The lawsuit challenging the permit was re-opened on April 6, 2006; Coeur filed its answer to the Amended Complaint; and Coeur, the State of Alaska, and Goldbelt, Inc., a local native corporation, were granted Defendant-Intervenor status to join the agencies in their defense of the permit. On August 4, 2006, the District Court dismissed the Plaintiffs’ challenge and upheld the Section 404 permit. Plaintiffs appealed that decision to the Ninth Circuit Court of Appeals (the “Circuit Court”), and on August 24, 2006, the Circuit Court granted a temporary injunction pending appeal enjoining certain activities relating to the Lake Tailings facility.

        On March 7, 2007, the Department of Justice (“DOJ”), on behalf of the Corps of Engineers, filed a motion for authorization under injunction pending appeal to permit construction of a western interception ditch which related to site stabilization due to spring snowmelt. On March 16, 2007, the Circuit Court panel issued an Order which denied the western interception ditch work plan. On May 22, 2007 the Ninth Circuit Court of Appeals reversed the District Court’s August 4, 2006 decision which had upheld the Company’s 404 permit and issued its opinion that remanded the case to the District Court with instructions to vacate the Company’s 404 permit as well as the USFS Record of Decision approving the general tailings disposal plan as well as the Goldbelt 404 permit to construct the Cascade Point Marine Facility. The DOJ, on behalf of the Corps of Engineers and the USFS, filed for an extension of time to file a Petition for Rehearing with the Ninth Circuit. The extension was granted on June 29, 2007. The deadline for filing a Petition for Rehearing to the Ninth Circuit is August 20, 2007. The Company intends to seek an appeal to the Ninth Circuit Court.

        This litigation has contributed to an increase in capital costs. While the Company cannot now predict with certainty the outcome of this litigation, it believes it should ultimately prevail. In the event that the Company does not prevail, it could be necessary to seek an alternate site for the tailings disposal facility. The Company is not aware of an alternate site that could be permitted or would be economic. Therefore, it is possible that the failure to obtain reversal upon appeal could render the project uneconomic and an asset impairment would be necessary. In addition, based upon the Company’s current estimates, an impairment writedown could be necessary should the expectation of the long-term price for gold decrease below approximately $540 per ounce. As of June 30, 2007, the Kensington project has a carrying value of its long-lived assets of $264 million. The Company reviews the carrying value of its assets whenever events or changes in circumstances indicate that the carrying amount of its assets may not be fully recoverable. During the first and second quarters of 2007, the Company performed an asset impairment assessment on the Kensington project as a result of a triggering event. The Company did not record any write-downs during the period ended June 30, 2007.

27


NOTE O – PROPOSED TRANSACTION

        On May 3, 2007, the Company entered into definitive agreements with Bolnisi Gold NL (“Bolnisi”) and Palmarejo Silver and Gold Corporation (“Palmarejo”) to combine the three companies. Bolnisi is the majority shareholder of Palmarejo, holding 73.6% of its outstanding shares. Under the terms of the agreements, Bolnisi shareholders will receive 0.682 Coeur shares for each Bolnisi share they own (or, at the election of the Bolnisi shareholder, CHESS Depositary Interests representing Coeur shares), and Palmarejo shareholders (other than Bolnisi) will receive 2.715 Coeur shares for each Palmarejo share they own. It is anticipated that this will result in Coeur issuing a total of approximately 271.3 million new shares. In addition, Bolnisi and Palmarejo shareholders will receive a nominal cash payment equal to A$0.004 (US$0.003) per Bolnisi share and C$0.004 (US$0.003) per Palmarejo share. The actual amount of consideration paid will be dependent upon the average Coeur stock price and the number of outstanding Bolnisi and Palmarejo shares at the time the acquisition becomes effective and could be more or less than $1.1 billion.

        The transaction is subject to approval by the shareholders of Coeur, Bolnisi and Palmarejo, the completion of satisfactory due diligence by Coeur (which was completed on July 3, 2007) and the satisfaction of customary closing conditions (including completion of regulatory reviews and receipt of regulatory approvals, including those of antitrust agencies). The consummation of each of the Bolnisi transaction and the Palmarejo transaction is also conditioned upon the consummation of the other transaction, although Coeur has the right to waive this condition if the Palmarejo transaction does not proceed, and still proceed with the Bolnisi transaction. Both arrangements require approval by the applicable courts in Canada and Australia. Assuming timely completion of the required regulatory processes and receipt of the required shareholder and Court approvals, the Company expects the transaction to be completed in the fourth quarter of 2007.

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

        This document contains numerous forward-looking statements relating to the Company’s gold and silver mining business. The United States Private Securities Litigation Reform Act of 1995 provides a “safe harbor” for certain forward-looking statements. Operating, exploration and financial data, and other statements in this document are based on information the Company believes reasonable, but involve significant uncertainties as to future gold and silver prices, costs, ore grades, estimation of gold and silver reserves, mining and processing conditions, changes that could result from the Company’s future acquisition of new mining properties or businesses, the risks and hazards inherent in the mining business (including environmental hazards, industrial accidents, weather or geologically related conditions), regulatory and permitting matters, and risks inherent in the ownership and operation of, or investment in, mining properties or businesses in foreign countries. Actual results and timetables could vary significantly from the estimates presented. Readers are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise.

        Management’s Discussion and Analysis includes references to total cash costs per ounce of silver produced both on an individual mine basis and on a consolidated basis. Total cash costs per ounce represent a non- U.S. generally accepted accounting principles (“GAAP”) measurement that management uses to monitor and evaluate the performance of its mining operations. A reconciliation of total cash costs per ounce to U.S. GAAP “Production Expenses” is also provided herein and should be referred to when reading the total cash cost per ounce measurement.

General

        The results of the Company’s operations are significantly affected by the market prices of silver and gold which may fluctuate widely and are affected by many factors beyond the Company’s control, including, without limitation, interest rates, expectations regarding inflation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional political and economic conditions, and other factors.

28


        The average price of silver (Handy & Harman) and gold (London Final) for the first six months of 2007 was $13.33 and $658 per ounce, respectively. The market price of silver and gold on August 6, 2007 was $12.98 per ounce and $672 per ounce, respectively.

        The Company’s operating mines are the Rochester mine in Nevada, the Cerro Bayo mine in Chile and the Martha mine in Argentina. In addition, the Company owns all of the silver production and reserves, up to certain limits, at the Endeavor and Broken Hill mines in Australia, which are owned and operated by other companies. As of June 1, 2006, the Company completed the sale of Coeur Silver Valley to U.S. Silver Corporation for $15 million in cash plus an estimated $1.1 million working capital adjustment.

     Operating Highlights and Statistics

South American Operations

        Cerro Bayo Mine:

        At the Cerro Bayo mine in Southern Chile, silver production was 369,500 ounces and gold production was 10,218 ounces in the second quarter of 2007 compared to 789,746 ounces of silver and 9,935 ounces of gold in the second quarter of 2006. The decrease in silver production was primarily due to a 46% decrease in ore grades and a 14% decrease in tons mined during the Company’s transition into wider mineralized zones amenable to mechanized mining methods which commenced late in the second quarter of 2007. Total cash costs per ounce in the second quarter of 2007 were $7.16 per ounce compared to $1.82 per ounce in 2006. The increase in cash costs per ounce is primarily due to lower production attributed to lower grades and lower tons mined.

        For the six months ended June 30, 2007, silver production was 721,448 ounces and gold production was 19,646 ounces compared to 1,305,568 ounces of silver and 18,729 ounces of gold for the same period of 2006. The decrease in silver production was primarily due to a 25% decline in ore grades and a 27% decrease in tons mined as a result of the Company focusing its mining activities on narrower vein systems of the mine as it transitioned to wider, more productive vein systems during the second quarter of 2007. It is expected that ore grades will improve to historical levels during the second half of 2007. Total cash costs per ounce for the first six months of 2007 amounted to $4.26 compared to $2.47 during the same period in 2006. The higher cash costs per ounce were due to the lower production attributed to lower ore grades and lower tons mined.

        Martha Mine:

        At the Martha Mine in Southern Argentina, silver production was 809,026 ounces in the second quarter of 2007 compared to 633,014 ounces in the second quarter of 2006. The increase in silver production was primarily due to an increase in tons mined. Total cash costs per ounce in the second quarter of 2007 were $5.18 per ounce compared to $5.14 per ounce in 2006. The higher cash costs per ounce were primarily due to increases in operating expenses, including labor, royalties and export taxes.

        For the six months ended June 30, 2007, silver production was 1,432,124 ounces compared to 1,176,500 ounces in the same period last year. The increase in silver production was primarily due to increased tons mined and higher ore grades. Total cash costs per ounce in the six-month period were $5.59 per ounce in 2007 compared to $5.04 per ounce in 2006. The increase in cash costs per ounce was primarily due to increases in operating expenses, including labor, increased royalties resulting from higher realized metals prices and export taxes during the first half of 2007 as compared to the same period in 2006.

29


North American Operations

        Rochester Mine:

        At the Rochester mine, silver production was 1,227,233 ounces and gold production was 14,146 ounces during the second quarter of 2007 compared to 1,153,295 ounces of silver and 18,265 ounces of gold in the second quarter of 2006. Total cash costs per ounce decreased to $2.54 from $2.61 in the second quarter of 2006. The decrease in cash costs per ounce is due to increased silver production.

        Silver production for the six months ended June 30, 2007 was 2,410,029 ounces compared to 2,301,658 ounces for the six months ended June 30, 2006 and gold production decreased to 28,435 ounces from 34,382 ounces for the six months ended June 30, 2006. Total cash costs per ounce increased to $3.71 compared to $3.46 for the same period of 2006. This increase in cash costs per ounce is due to decreased by-product credits due to lower gold production and higher operating costs.

Australia Operations

        Endeavor Mine:

        On May 23, 2005, the Company acquired all of the silver production and reserves, up to a maximum 17.7 million payable ounces, contained at the Endeavor Mine in Australia, which is owned and operated by Cobar Operations Pty. Limited (“Cobar”), a wholly-owned subsidiary of CBH Resources Ltd. (“CBH”) for $40.9 million. The Endeavor Mine is located 720 km northwest of Sydney in New South Wales and has been in production since 1983. Under the terms of the original agreement, CDE Australia, a wholly-owned subsidiary of Coeur, paid Cobar $15.4 million of cash at the closing. In addition, CDE Australia, subject to certain conditions, will pay Cobar approximately $25.5 million upon the receipt of a report confirming that the reserves at the Endeavor mine are equal to or greater than the reported ore reserves for 2004. In addition to these upfront payments, Coeur originally committed to pay Cobar an operating cost contribution of $1.00 for each ounce of payable silver plus a further increment when the silver price exceeds $5.23 per ounce. This further increment was to have begun on the second anniversary of the agreement and is 50% of the amount by which the silver price exceeds $5.23 per ounce. A cost contribution of $0.25 per ounce is also payable by Coeur in respect of new ounces of proven and probable silver reserves as they are discovered. During the first quarter of 2007, $2.0 million was paid for new ounces of proven and probable silver reserves.

        On March 28, 2006, CDE Australia Pty, Ltd. (CDE Australia) reached an agreement with CBH Resources Ltd. to modify the terms of the original silver purchase agreement. Under the modified terms, CDE Australia owns all silver production and reserves up to a total of 20.0 million ounces, up from 17.7 million ounces in the original agreement. The Company has received approximately 0.7 million payable ounces to date and the current ore reserve contains approximately 15.3 million payable ounces based on current metallurgical recovery and current smelter contract terms. Expansion of the ore reserve will be required to achieve the maximum payable ounces of silver production as set forth in the modified contract. It is expected that future expansion to the ore reserve will occur as a result of the conversion of portions of the property’s existing inventory of mineralized material and future exploration discoveries. CBH conducts regular exploration to discover new mineralization and to define reserves from surface and underground drilling platforms. The silver price-sharing provision is deferred until such time as Coeur has received approximately 2 million cumulative ounces of silver from the mine or June 2007, whichever is later. In addition, the silver price-sharing threshold increased to US$7.00 per ounce, from the previous level of US$5.23 per ounce. As of June 30, 2007, Coeur has received approximately 1.1 million ounces of cumulative production from the Endeavor mine.

30


        In connection with the modification of the terms of the agreement, CDE Australia agreed to provide CBH with an advance of up to A$15.0 million of the A$30 million that remains to be paid under the terms of the original agreement. The remaining payment from Coeur to CBH is subject to the Endeavor mine achieving certain operational benchmarks. The advance, in the form of a loan facility, will bear interest at 7.75% per annum once drawn by CBH. The term is for a twelve month period with an option to extend an additional six months. No advances have been drawn under the facility as of June 30, 2007.

        Production at the Endeavor mine during the second quarter of 2007 was 124,441 ounces of silver compared to 80,890 ounces in the second quarter of 2006. Total cash costs per ounce increased to $2.91 from $2.79. For the six months ended June 30, 2007, production was 284,718 ounces of silver compared to 165,170 ounces for the same period in 2006. The cash costs per ounce of silver production increased to $3.06 compared to $2.45 due to higher smelting and refining costs.

        Broken Hill Mine:

        On September 8, 2005, the Company acquired all of the silver production and reserves, up to 17.2 million payable ounces, contained at the Broken Hill mine in Australia, which is owned and operated by Perilya Broken Hill Ltd. (“PBH”) for $36.0 million. Pursuant to the agreement, the transaction includes up to a maximum of approximately 24.5 million contained ounces (or 17.2 million payable ounces) of silver to be mined by PBH at Broken Hill on the Company’s behalf. In addition CDE Australia will pay PBH an operating cost contribution of approximately $2.00 for each ounce of payable silver. Under the terms of the agreement, PBH may earn up to US$6.0 million of additional consideration, $0.75 million per year, by meeting certain silver production thresholds over the first eight years of production. Production fell short of the thresholds in the 2007 and 2006 periods by 0.6 million and 0.5 million, respectively.

        Production at the Broken Hill mine during the second quarter of 2007 was 476,494 ounces of silver compared to 528,041 ounces for the second quarter of 2006. The cash costs per ounce of silver production decreased to $3.20 compared to $3.27. For the six months ended June 30, 2007, silver production was 779,342 ounces compared to 1,085,353 ounces in the same period of 2006. The cash cost per ounce of silver production increased to $3.19 compared to $3.07.

Discontinued Operations

        Coeur Silver Valley (Galena) Mine:

        On June 1, 2006, the Company completed the sale of 100% of the shares of its wholly owned subsidiary Coeur Silver Valley, Inc. to U.S. Silver Corporation for $15 million in cash and additional consideration to be received of $1.1 million for working capital. At the Galena Mine, silver production for the three and six months ended June 30, 2006 was 269,027 and 768,674 ounces, respectively.

The Bolnisi and Palmarejo Transactions

        On May 3, 2007, the Company entered into definitive agreements with Bolnisi Gold NL (“Bolnisi”) and Palmarejo Silver and Gold Corporation (“Palmarejo”) to combine the three companies. Bolnisi is the majority shareholder of Palmarejo, holding 73.6% of its outstanding shares. Under the terms of the agreements, Bolnisi shareholders will receive 0.682 Coeur shares for each Bolnisi share they own (or, at the election of the Bolnisi shareholder, CHESS Depositary Interests representing Coeur shares), and Palmarejo shareholders (other than Bolnisi) will receive 2.715 Coeur shares for each Palmarejo share they own. It is anticipated that this will result in Coeur issuing a total of approximately 271.3 million new shares. In addition, Bolnisi and Palmarejo shareholders will receive a nominal cash payment equal to A$0.004 (US$0.003) per Bolnisi share and C$0.004 (US$0.003) per Palmarejo share. The actual amount of consideration paid will be dependent upon the average Coeur stock price and the number of outstanding Bolnisi and Palmarejo shares at the time the acquisition becomes effective and could be more or less than $1.1 billion.

31


        The transaction is subject to approval by the shareholders of Coeur, Bolnisi and Palmarejo and the satisfaction of customary closing conditions (including completion of regulatory reviews and receipt of regulatory approvals, including those of antitrust agencies). The consummation of each of the Bolnisi transaction and the Palmarejo transaction is also conditioned upon the consummation of the other transaction, although Coeur has the right to waive this condition if the Palmarejo transaction does not proceed, and still proceed with the Bolnisi transaction. Both arrangements require approval by the applicable courts in Canada and Australia. Assuming timely completion of the required regulatory processes and receipt of the required shareholder and Court approvals, the Company expects the transaction to be completed in the fourth quarter of 2007.

32


Operating Statistics From Continuing Operations

        The following table presents information by mine and consolidated sales information for the three- and six-month periods ended June 30, 2007 and 2006:

Three Months Ended June 30, Six Months Ended June 30,
2007
2006
2007
2006
Rochester        
    Tons processed 2,065,481  2,737,547  4,148,753  5,269,447 
    Ore grade/Ag oz 0.59  0.76  0.67  0.72 
    Ore grade/Au oz .006  .009  .007  .011 
    Recovery/Ag oz (A) 100.7% 55.5% 86.2% 60.9%
    Recovery/Au oz (A) 117.7% 75.1% 103.6% 58.3%
    Silver production ounces 1,227,233  1,153,295  2,410,029  2,301,658 
    Gold production ounces 14,146  18,265  28,435  34,382 
    Cash cost/oz $2.54  $2.61  $3.71  $3.46 
    Total cost/oz $5.21  $5.80  $6.96  $6.70 
Cerro Bayo
    Tons milled 99,095  115,361  157,545  215,636 
    Ore grade/Ag oz 3.92  7.20  4.82  6.43 
    Ore grade/Au oz .110  .094  .133  .094 
    Recovery/Ag oz 95.1% 95.1% 95.0% 94.2%
    Recovery/Au oz 93.4% 92.1% 93.7% 92.1%
    Silver production ounces 369,500  789,746  721,448  1,305,568 
    Gold production ounces 10,218  9,935  19,646  18,729 
    Cash cost/oz $7.16  $1.82  $4.26  $2.47 
    Total cost/oz $10.91  $3.77  $8.07  $4.63 
Martha Mine
    Tons milled 9,663  6,817  17,864  15,666 
    Ore grade/Ag oz 89.12  97.79  84.77  79.75 
    Ore grade/Au oz .122  .134  .115  .105 
    Recovery/Ag oz 93.9% 95.0% 94.6% 94.2%
    Recovery/Au oz 92.5% 91.8% 93.3% 92.0%
    Silver production ounces 809,026  633,014  1,432,124  1,176,500 
    Gold production ounces 1,089  839  1,924  1,509 
    Cash cost/oz $5.18  $5.14  $5.59  $5.04 
    Total cost/oz $5.57  $5.61  $6.00  $5.50 
Endeavor
    Tons milled 251,785  118,775  537,865  221,778 
    Ore grade/Ag oz 1.03  1.11  0.96  1.20 
    Recovery/Ag oz 48.2% 61.3% 55.1% 62.1%
    Silver production ounces 124,441  80,890  284,718  165,170 
    Cash cost/oz $2.91  $2.79  $3.06  $2.45 
    Total cost/oz $3.89  $4.09  $4.04  $3.75 
Broken Hill
    Tons milled 447,771  525,888  749,388  1,106,911 
    Ore grade/Ag oz 1.28  1.32  1.22  1.35 
    Recovery/Ag oz 83.2% 75.8% 85.0% 72.2%
    Silver production ounces 476,494  528,041  779,342  1,085,353 
    Cash cost/oz $3.20  $3.27  $3.19  $3.07 
    Total cost/oz $5.16  $6.02  $5.15  $5.82 
CONSOLIDATED PRODUCTION TOTALS
    Silver ounces 3,006,694  3,184,986  5,627,661  6,034,249 
    Gold ounces 25,453  29,039  50,005  54,620 
    Cash cost per oz/silver $3.93  $3.03  $4.15  $3.46 
    Total cost/oz $5.94  $5.25  $6.45  $5.78 
CONSOLIDATED SALES TOTALS
    Silver ounces sold 2,805,479  3,249,854  5,481,913  6,127,744 
    Gold ounces sold 25,520  29,157  50,152  54,891 
    Realized price per silver ounce $13.47  $13.10  $13.60  $11.82 
    Realized price per gold ounce $665  $649  $655  $620 

(A) The leach cycle at Rochester requires an extended period to recover gold and silver contained in the ore. The Company estimates the ultimate recovery to be approximately 61.5% for silver and 93% for gold. However, ultimate recoveries will not be known until leaching operations cease which is currently estimated for 2011. Current recovery may vary significantly from ultimate recovery. See Critical Accounting Policies and Estimates – Ore on Leach Pad.

33


Operating Statistics From Discontinued Operation

        The following table presents information for Coeur Silver Valley which was sold on June 1, 2006:

Three Months Ended June 30, Six Months Ended June 30,
2007
2006
2007
2006
Silver Valley/Galena        
    Tons milled - 20,224  - 52,876 
    Ore grade/Silver oz - 13.92  - 15.15 
    Recovery/Silver oz - 95.6% - 96.0%
    Silver production ounces - 269,027  - 768,674 
    Cash cost/oz - $10.72  - $9.75 
    Total cost/oz - $11.04  - $10.64 
    Gold production - 58  - 180 

“Cash Costs per Ounce” are calculated by dividing the cash costs computed for each of the Company’s mining properties for a specified period by the amount of gold ounces or silver ounces produced by that property during that same period. Management uses cash costs per ounce as a key indicator of the profitability of each of its mining properties. Gold and silver are sold and priced in the world financial markets on a US dollar per ounce basis.

“Cash Costs” are costs directly related to the physical activities of producing silver and gold, and include mining, processing and other plant costs, third-party refining and smelting costs, marketing expense, on-site general and administrative costs, royalties, in-mine drilling expenditures that are related to production and other direct costs. Sales of by-product metals are deducted from the above in computing cash costs. Cash costs exclude depreciation, depletion and amortization, corporate general and administrative expense, exploration, interest, and pre-feasibility costs and accruals for mine reclamation. Cash costs are calculated and presented using the “Gold Institute Production Cost Standard” applied consistently for all periods presented.

Total cash costs per ounce is a non-GAAP measurement and investors are cautioned not to place undue reliance on it and are urged to read all GAAP accounting disclosures presented in the consolidated financial statements and accompanying footnotes. In addition, see the reconciliation of “cash costs” to production costs under “Reconciliation of Non-GAAP Cash Costs to GAAP Production Costs” set forth below.

Reconciliation of Non-GAAP Cash Costs to GAAP Production Costs

        The tables below present reconciliations between Non-GAAP cash costs per ounce to production costs applicable to sales including depreciation, depletion and amortization (GAAP).

        Total cash costs include all direct and indirect operating cash costs related directly to the physical activities of producing metals, including mining, processing and other plant costs, third-party refining and marketing expense, on-site general and administrative costs, royalties and mining production taxes, net of by-product revenues earned from all metals other than the primary metal produced at each unit. Total cash costs are a performance measure and provide management and investors an indication of net cash flow, after consideration of the realized price received for production sold. Management also uses this measurement for the comparative monitoring of performance of our mining operations period-to-period from a cash flow perspective. “Total cash cost per ounce” is a measure developed by precious metals companies in an effort to provide a comparable standard, however, there can be no assurance that our reporting of this non-GAAP measure is similar to that reported by other mining companies.

        Production costs applicable to sales including depreciation, depletion and amortization, is the most comparable financial measure calculated in accordance with GAAP to total cash costs. The sum of the production costs applicable to sales and depreciation, depletion and amortization for our mines as set forth in the tables below is included in our Consolidated Statement of Operations and Comprehensive Loss.

34


THREE MONTHS ENDED JUNE 30, 2007
(In thousands except ounces and per ounce costs)

Rochester
Cerro Bayo
Martha
Endeavor
Broken Hill
Total

Production of Silver (ounces)
     1,227,233    369,500    809,026    124,441    476,494    3,006,694  
Cash Costs per ounce   $ 2.54   $ 7.16   $ 5.18   $ 2.91   $ 3.20   $ 3.93  






Total Cash Costs (Non-GAAP)   $ 3,112   $ 2,645   $ 4,190   $ 362   $ 1,525   $ 11,834  
Add/Subtract:  
Third party smelting costs    --    (845 )  (464 )  (249 )  (600 )  (2,158 )
By-product credit (1)    9,420    6,776    726    --    --    16,922  
Other adjustments    511    --    --    --    --    511  
Change in inventory    205    (546 )  --    19    (47 )  (369 )
Depreciation, depletion and  
   amortization    2,765    1,384    313    122    934    5,518  






Production costs applicable to  
   sales, including depreciation,  
   depletion and amortization (GAAP)   $ 16,013   $ 9,414   $ 4,765   $ 254   $ 1,812   $ 32,258  







THREE MONTHS ENDED JUNE 30, 2006
(In thousands except ounces and per ounce costs)

Rochester
Cerro Bayo
Martha
Endeavor
Broken Hill
Total

Production of Silver (ounces)
     1,153,295    789,746    633,014    80,890    528,041    3,184,986  
Cash Costs per ounce   $ 2.61   $ 1.82   $ 5.14   $ 2.79   $ 3.27   $ 3.03  






Total Cash Costs (Non-GAAP)   $ 3,008   $ 1,439   $ 3,251   $ 225   $ 1,727   $ 9,650  
Add/Subtract:  
Third party smelting costs    --    (1,021 )  (469 )  (155 )  (762 )  (2,407 )
By-product credit (1)    11,535    6,298    522    --    --    18,355  
Other adjustments    197    --    --    --    --    197  
Change in inventory    (4,130 )  (245 )  (159 )  (6 )  332    (4,208 )
Depreciation, depletion and  
   amortization    3,480    1,537    302    105    1,452    6,876  






Production costs applicable to  
   sales, including depreciation,  
   depletion and amortization (GAAP)   $ 14,090   $ 8,008   $ 3,447   $ 169   $ 2,749   $ 28,463  







SIX MONTHS ENDED JUNE 30, 2007
(In thousands except ounces and per ounce costs)

Rochester
Cerro Bayo
Martha
Endeavor
Broken Hill
Total

Production of Silver (ounces)
     2,410,029    721,448    1,432,124    284,718    779,342    5,627,661  
Cash Costs per ounce   $ 3.71   $ 4.26   $ 5.59   $ 3.06   $ 3.19   $ 4.15  






Total Cash Costs (Non-GAAP)   $ 8,934   $ 3,071   $ 7,999   $ 873   $ 2,483   $ 23,360  
Add/Subtract:  
Third party smelting costs    --    (1,452 )  (982 )  (616 )  (968 )  (4,018 )
By-product credit (1)    18,696    12,914    1,271    --    --    32,881  
Other adjustments    650    --    --    --    --    650  
Change in inventory    (3,276 )  (2,333 )  518    32    (54 )  (5,113 )
Depreciation, depletion and  
   amortization    7,181    2,749    584    279    1,528    12,321  






Production costs applicable to  
   sales, including depreciation,  
   depletion and amortization (GAAP)   $ 32,185   $ 14,949   $ 9,390   $ 568   $ 2,989   $ 60,081  







35


SIX MONTHS ENDED JUNE 30, 2006
(In thousands except ounces and per ounce costs)

Rochester
Cerro Bayo
Martha
Endeavor
Broken Hill
Total

Production of Silver (ounces)
     2,301,658    1,305,568    1,176,500    165,170    1,085,353    6,034,249  
Cash Costs per ounce   $ 3.46   $ 2.47   $ 5.04   $ 2.45   $ 3.07   $ 3.46  






Total Cash Costs (Non-GAAP)   $ 7,972   $ 3,222   $ 5,932   $ 405   $ 3,336   $ 20,867  
Add/Subtract:  
Third party smelting costs    --    (1,792 )  (781 )  (257 )  (1,334 )  (4,164 )
By-product credit (1)    20,476    11,171    893    --    --    32,540  
Other adjustments    936    --    --    --    --    936  
Change in inventory    (7,022 )  (1,596 )  (223 )  (54 )  403    (8,492 )
Depreciation, depletion and  
   amortization    6,518    2,820    540    214    2,985    13,077  






Production costs applicable to  
   sales, including depreciation,  
   depletion and amortization (GAAP)   $ 28,880   $ 13,825   $ 6,361   $ 308   $ 5,390   $ 54,764  






The following tables present a reconciliation between non-GAAP cash costs per ounce to GAAP production costs applicable to sales reported in Discontinued Operations (see Note D):

Coeur Silver Valley/Galena THREE MONTHS
ENDED JUNE 30,
SIX MONTHS
ENDED JUNE 30,
2007 2006 (2) 2007 2006 (2)
(In thousands except ounces and per ounce costs)

Production of Silver (ounces)
    -       269,027   -       768,674  
Cash Costs per ounce   -   $ 10.72   -   $ 9.75  


Total Cash Costs (Non-GAAP)   -   $ 2,883   -   $ 7,498  
Add/Subtract:  
Third party smelting costs   -    (595 ) -    (1,464 )
By-product credit (2)   -    677   -    1,473  
Change in inventory   -    1,008   -    726  
Depreciation, depletion and  
amortization   -    86   -    681  


Production costs applicable to  
   sales, including depreciation,  
   depletion and amortization (GAAP)   -   $ 4,059   -   $ 8,914  



(1) By-product credits are based upon production units and the period’s average metal price for the purposes of reporting cash costs per ounce.

(2) Amounts represent two and five months ended May 31, 2006, respectively.

Exploration Activity

Cerro Bayo Mine (Chile)

        Exploration at Cerro Bayo during the second quarter of 2007 focused on reserve development/delineation drilling and discovery of new mineralization. Approximately 17,100 meters (56,200 feet) were drilled in the two programs. The majority of the drilling (56%) was devoted to definition of new reserves around the current mine operations areas. During the quarter, this work resulted in the discovery of three new veins known as the Dagny, Fabiola and Coyita veins. Drilling commenced on the Dagny vein in the quarter. Results from both programs are expected to produce additional reserves and mineralized material though the impact of the new drilling will not be fully evaluated until the program is completed.

36


Martha Mine (Argentina)

        At Martha, a total of approximately 4,000 meters (13,000 feet) of drilling was completed during the second quarter to expand reserves and discover new mineralization. The majority of this drilling (76%) was devoted to discovery of new mineralization. Results obtained from drilling R4 Deep, Francisca and Catalina continues to expand the strike and depth of the mineralization in those veins, which were discovered in 2004. Drilling will continue throughout the year on these and other targets in the Martha mine district.

Other Properties

        In addition to exploration at its operating and development properties, Coeur conducts a large grassroots (greenfields) exploration program to find new mineral deposits and define new mining opportunities. Currently the largest components of this program are devoted to the Santa Cruz Province of southern Argentina and to the Lake Victoria Gold Belt of Tanzania but the Company has also budgeted for exploration in other parts of the world as well.

        Argentina, Santa Cruz Province

        In addition to its exploration program near the Martha mine, the Company also conducts exploration in other parts of the Santa Cruz province of Argentina. In the first half of 2007, the Company focused this effort on the Sascha and Sol de Mayo properties. Sascha is one of two properties on which the Company has an option to earn up to a 71% interest in a joint venture with Mirasol Resources Ltd. During the quarter, we drilled approximately 2,300 meters (7,500 feet) of core at both Sascha and Sol de Mayo.

        Tanzania (Africa)

        In the second quarter, the Company continued exploration on its properties in the Lake Victoria Goldfields District of northern Tanzania. Core and reverse circulation drilling was conducted on the Saragurwa and Kiziba Hill properties in the quarter and total 3,571 meters (11,716 feet).

        Puchuldiza, Chile

        Puchuldiza is a large, epithermal, hot spring deposit in a setting very similar to other such gold deposits in the USA, New Zealand and Japan. Gold mineralization can be found throughout the property in systems of veins, veinlets and stockworks developed in explosion breccias and silicified zones.

        On November 28, 2001, the Company signed an agreement with Barrick Gold Corporation relating to Coeur’s Puchuldiza gold property located approximately 250 kms northeast of the port city of Iquique in northern Chile. Under the terms of the agreement, Barrick can earn a 75% interest in the property in return for exploration expenditures of $2.25 million over the next five years (the initial period). For an additional $5.8 million in exploration spending, Barrick can increase its property interest to 85%. Coeur, however, can recover its full 25% interest by making a cash payment to Barrick equivalent to 25% of Barrick’s additional expenditure of $5.8 million, plus a 50% penalty.

        Since 2001, Barrick has spent approximately $1.95 million on geologic mapping, geochemical and geophysical surveys and drilling on the Puchuldiza property. A total of 4,375 meters (14,350 feet) of drilling in 17 core holes has been completed. Results of their work have been encouraging enough for Barrick to plan follow-up work. Coeur granted to Barrick a 24-month extension of the initial period and Barrick must spend a cumulative total of $2.45 million by the end of the initial period to earn a 75% interest.

37


Development Projects:

San Bartolome (Bolivia)

        During 2004, the Company completed an updated feasibility study, obtained all required permits and commenced construction of the San Bartolome mine. The Company estimates the direct capital cost of the project, excluding political risk insurance premiums and capitalized interest, to be approximately $174 million, and the annual production to be approximately 6 to 9 million ounces of silver over a mine life of approximately 14 years.

        During the first six months of 2007, construction work activity has increased in all project areas including the process plant and tailings facility. Current work includes concrete foundation work in the crusher, stockpile and mill areas, tank installation in the leach and Counter Current Decantation thickener areas and continued work at the tailings facility. Detailed engineering and procurement activities were completed in June with any remaining activities to be performed at site. All of the major construction contracts have been committed for the project. As of June 30, 2007, seven major contractors were employed on site with a total employment of approximately 950 workers, most of whom are Bolivian, and the project has recorded 1 million man-hours without a lost time accident. At the end of July, the Company began stockpiling oxide dump material adjacent to the plant site in anticipation of the mill start up.

        During the six months ended June 30, 2007, Coeur expended approximately $27.7 million and plans to incur additional engineering, procurement and construction costs of approximately $120.7 million in 2007. The Company plans to complete construction activities toward the end of 2007.

        The San Bartolome project involves risks that are inherent in any mining venture, as well as particular risks associated with the location of the project. The estimate of mineralized material indicated by the geologic studies performed to date are preliminary in nature and may differ materially after further metallurgical testing is completed. Also, managing mining projects in the altiplano area of Bolivia, where Cerro Rico is located, presents logistical challenges. The political and cultural differences of Bolivia may also present challenges.

        We have obtained a political risk insurance policy from the Overseas Private Insurance Corporation (“OPIC”) and another private insurer. The policy is in the amount of $155 million and covers 85% of any loss arising from expropriation, political violence or currency inconvertibility. The policy is expected to cost approximately $3.4 million during the course of construction and $0.21 per ounce of silver produced when the project commences commercial production.

        The Company updated its ore reserves for San Bartolome in the second quarter of 2007 using additional sampling, revised operating and capital costs and silver price.

Kensington (Alaska)

        The Kensington project consists of approximately 6,000 acres, of which approximately 750 acres are patented claims. The property is located on the east side of Lynn Canal between Juneau and Haines, Alaska. Coeur Alaska is obligated to pay Echo Bay a scaled net smelter return royalty on 1.0 million ounces of future gold production after Coeur Alaska recoups the $32.5 million purchase price and its construction and development expenditures incurred after July 7, 1995, in connection with placing the property into commercial production. The royalty ranges from 1% at $400 gold prices to a maximum of 2 ½% at gold prices above $475, with the royalty to be capped at 1.0 million ounces of production.

        During the fourth quarter of 2004, the U.S. Forest Service (“USFS”) issued its Record of Decision (“ROD”) for the Final Supplemental Environmental Impact Statement (“FSEIS”). On June 28, 2005, the Company received the Environmental Protection Agency’s (“EPA”) National Pollution Discharge Elimination System (“NPDES”) Permit. In addition, the Company received the U.S. Army Corps of Engineers (“Corps of Engineers”) 404 Wetlands Permit, which authorized the construction of a Lower Slate Lake tailings facility, millsite road improvements and a Slate Creek Cove dock facility. All permits were reviewed for consistency by both the Alaska Coastal Management and Department of Governmental Coordination, which issued its final ACMP permit certification.

38


        On September 12, 2005 three environmental groups (“Plaintiffs”) filed a lawsuit in Federal District Court in Alaska (the “District Court”) against the Corps of Engineers and the USFS seeking to invalidate permits issued to Coeur Alaska, Inc. for the Company’s Kensington mine. The Plaintiffs claim the Clean Water Act (“CWA”) Section 404 permit issued by the Corps of Engineers authorizing the deposition of mine tailings into Lower Slate Lake conflicts with the CWA and is thus illegal. They additionally claim the USFS’s approval of the Amended Plan of Operations is arbitrary and capricious because it relies on the 404 permit issued by the Corps of Engineers.

        On August 4, 2006, the District Court dismissed the Plaintiffs’ challenge and upheld the Section 404 permit. On August 7, 2006 the Plaintiffs filed a Notice of Appeal of the decision to the Ninth Circuit Court of Appeals (Circuit Court) and on August 9, 2006 the Plaintiffs additionally filed a Motion for Injunction Pending Appeal with the Circuit Court. The Circuit Court granted a temporary injunction pending appeal on August 24, 2006, enjoining certain activities relating to the lake tailings facility.

        On May 22, 2007 the Ninth Circuit Court of Appeals reversed the District Court’s August 4, 2006 decision which had upheld the Company’s 404 permit and issued its opinion that remanded the case to the District Court with instructions to vacate the Company’s 404 permit as well as the USFS Record of Decision approving the general tailings disposal plan as well as the Goldbelt 404 permit to construct the Cascade Point Marine Facility. The DOJ, on behalf of the Corps of Engineers and the USFS, filed for an extension of time to file a Petition for Rehearing with the Ninth Circuit. The extension was granted on June 29, 2007. The deadline for filing a Petition for Rehearing to the Ninth Circuit is August 20, 2007. The Company intends to seek an appeal to the Ninth Circuit court.

        No assurance can be given as to whether or when regulatory permits and approvals granted to the Company may be further challenged, appealed or contested by third parties or issuing agencies, or as to whether the Company will place the Kensington project into commercial production. As of March 31, 2007, the Company estimates the cost of currently approved project construction activities to be approximately $238 million. The date of resumption of the remaining construction activities which are critical to commencement of production is uncertain and dependent upon the ultimate outcome of the legal challenge and the appeals.

        Total expenditures by the Company at the Kensington property in the six months ended June 30, 2007 were $58.6 million. Such expenditures were used to continue the permitting and development activities. The Company plans to incur additional construction cost of approximately $22.1 million during the remainder of 2007, subject to the ultimate outcomes of the litigation appeal process.

Critical Accounting Policies and Estimates

        Management considers the following policies to be most critical in understanding the judgments that are involved in preparing the Company’s consolidated financial statements and the uncertainties that could impact its results of operations, financial condition and cash flows. Our consolidated financial statements are impacted by the accounting policies used and the estimates and assumptions made by management during their preparation. We have identified the policies below as critical to our business operations and the understanding of our results of operations. Management’s discussion and analysis of our financial condition and results of operations are based on our consolidated financial statements, which have been prepared in conformity with accounting principles generally accepted in the United States (GAAP). The preparation of these statements requires that we make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities at the date of our financial statements, and the reported amounts of revenue and expenses during the reporting period. We base these estimates on historical experience and on assumptions that we consider reasonable under the circumstances; however, reported results could differ from those based on the current estimates under different assumptions or conditions. The impact and any associated risks related to these policies on our business operations are discussed throughout Management’s Discussion and Analysis of Financial Condition and Results of Operations. The areas requiring the use of management’s estimates and assumptions relate to recoverable ounces from proven and probable reserves that are the basis of future cash flow estimates and units-of-production depreciation and amortization calculations; useful lives utilized for depreciation, depletion, amortization and accretion of future cash flows for long lived assets; estimates of recoverable gold and silver ounces in ore on leach pad; reclamation and remediation costs; valuation allowance for deferred tax assets; and post-employment and other employee benefit liabilities. For a detailed discussion on the application of these and other accounting policies, see Note B in the Notes to the Consolidated Financial Statements of this Form 10-Q.

39


Revenue Recognition.  Revenue includes sales value received for our principal product, silver, and associated by-product revenues from the sale of by-product metals consisting primarily of gold and copper. Revenue is recognized when title to silver and gold passes to the buyer and when collectibility is reasonably assured. The passing of title to the customer is based on terms of the sales contract. Product pricing is determined at the point revenue is recognized by reference to active and freely traded commodity markets, for example, the London Bullion Market for both gold and silver, in an identical form to the product sold.

        Under our concentrate sales contracts with third-party smelters, final gold and silver prices are set on a specified future quotational period, typically one to three months, after the shipment date based on market metal prices. Revenues are recorded under these contracts at the time title passes to the buyer based on the forward price for the expected settlement period. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices. Final settlement is based on the average applicable price for a specified future period, and generally occurs from three to six months after shipment. Final sales are settled using smelter weights, settlement assays (average of assays exchanged and/or umpire assay results) and are priced as specified in the smelter contract. The Company’s provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative does not qualify for hedge accounting. The embedded derivative is recorded as a derivative asset in prepaid expenses and other, or a derivative liability on the balance sheet and is adjusted to fair value through revenue each period until the date of final gold and silver settlement. The form of the material being sold, after deduction for smelting and refining is in an identical form to that sold on the London Bullion Market. The form of the product is metal in flotation concentrate, which is the final process for which the Company is responsible.

        The effects of forward sales contracts are reflected in revenue at the date the related precious metals are delivered or the contracts expire. Third party smelting and refining costs are recorded as a reduction of revenue.

        At June 30, 2007, the Company had outstanding provisionally priced sales of $73.1 million consisting of 3.8 million ounces of silver and 34,159 ounces of gold. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $38,300; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $34,200.

Estimates.  The preparation of this Quarterly Report on Form 10-Q requires us to make estimates and assumptions that affect the reported amount of assets and liabilities, disclosure of contingent assets and liabilities at the date of our financial statements, and the reported amounts of revenue and expenses during the reporting period. There can be no assurance that actual results will not differ from those estimates. The most critical accounting principles upon which the Company’s financial status depends are those requiring estimates of recoverable ounces from proven and probable reserves and/or assumptions of future commodity prices. There are a number of uncertainties inherent in estimating quantities of reserves, including many factors beyond our control. Ore reserves estimates are based upon engineering evaluations of samplings of drill holes and other openings. These estimates involve assumptions regarding future silver and gold prices, the geology of our mines, the mining methods we use and the related costs we incur to develop and mine our reserves. Changes in these assumptions could result in material adjustments to our reserve estimates. We use reserve estimates in determining the units-of-production depreciation and amortization expense, as well as in evaluating mine asset impairments.

40


        We review and evaluate our long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. We utilize the methodology set forth in Statement of Financial Accounting Standard (SFAS) No. 144, “Accounting for the Impairment or Disposal of Long-Lived Assets,” to evaluate the recoverability of capitalized mineral property costs. An impairment is considered to exist if total estimated future cash flows or probability-weighted cash flows on an undiscounted basis is less than the carrying amount of the assets, including property, plant and equipment, mineral property, development property, and any deferred costs. The accounting estimates related to impairment are critical accounting estimates because the future cash flows used to determine whether an impairment exists is dependent on reserve estimates and other assumptions, including silver and gold prices, production levels, and capital and reclamation costs, all of which are based on detailed engineering life-of-mine plans. An impairment loss exists when estimated undiscounted cash flows expected to result from the use of the asset and its eventual disposition are less than its carrying amount. Any impairment loss recognized represents the excess of the asset’s carrying value as compared to its estimated fair value. The Company reviews the carrying value of its assets whenever events or changes in circumstances indicate that the carrying amount of its assets may not be fully recoverable. During the first and second quarters of 2007, the Company performed an asset impairment assessment on the Kensington project as a result of a triggering event. The Company did not record any write-downs during the period ended June 30, 2007.

        We depreciate our property, plant and equipment, mining properties and mine development using the units-of-production method over the estimated life of the ore body based on our proven and probable recoverable reserves or on a straight-line basis over the useful life, whichever is shorter. The accounting estimates related to depreciation and amortization are critical accounting estimates because 1) the determination of reserves involves uncertainties with respect to the ultimate geology of our reserves and the assumptions used in determining the economic feasibility of mining those reserves and 2) changes in estimated proven and probable reserves and useful asset lives can have a material impact on net income.

Ore on leach pad. The Rochester Mine utilizes the heap leach process to extract silver and gold from ore. The heap leach process is a process of extracting silver and gold by placing ore on an impermeable pad and applying a diluted cyanide solution that dissolves a portion of the contained silver and gold, which are then recovered in metallurgical processes.

        The key stages in the conversion of ore into silver and gold are (i) the blasting process in which the ore is broken into large pieces; (ii) the processing of the ore through a crushing facility that breaks it into smaller pieces; (iii) the transportation of the crushed ore to the leach pad where the leaching solution is applied; (iv) the collection of the leach solution; (v) subjecting the leach solution to the precipitation process, in which gold and silver is converted back to a fine solid; (vi) the conversion of the precipitate into dorè; and (vii) the conversion by a third party refinery of the dorè into refined silver and gold bullion.

41


        We use several integrated steps to scientifically measure the metal content of ore placed on the leach pads during the key stages. As the ore body is drilled in preparation for the blasting process, samples of the drill residue are assayed to determine estimated quantities of contained metal. We estimate the quantity of ore by utilizing global positioning satellite survey techniques. We then process the ore through a crushing facility where the output is again weighed and sampled for assaying. A metallurgical reconciliation with the data collected from the mining operation is completed with appropriate adjustments made to previous estimates. We then transport the crushed ore to the leach pad for application of the leaching solution. As the leach solution is collected from the leach pads, we continuously sample for assaying. We measure the quantity of leach solution by flow meters throughout the leaching and precipitation process. After precipitation, the product is converted to dorè, which is the final product produced by the mine. We again sample and assay the dorè. Finally, a third party smelter converts the dorè into refined silver and gold bullion. At this point we are able to determine final ounces of silver and gold available for sale. We then review this end result and reconcile it to the estimates we had used and developed throughout the production process. Based on this review, we adjust our estimation procedures when appropriate.

        Our reported inventories include metals estimated to be contained in the ore on leach pad of $70.1 million as of June 30, 2007. Of this amount, $32.7 million is reported as a current asset and $37.4 million is reported as a noncurrent asset. The distinction between current and noncurrent is based upon the expected length of time necessary for the leaching process to remove the metals from the broken ore. The historical cost of the metal that is expected to be extracted within twelve months is classified as current and the historical cost of metals contained within the broken ore that will be extracted beyond twelve months is classified as noncurrent. The ore on leach pad inventory is stated at actual production costs incurred to produce and place ore on the leach pad during the current period, adjusted for the effects on monthly production costs of abnormal production levels.

        The estimate of both the ultimate recovery expected over time, and the quantity of metal that may be extracted relative to such twelve month period, requires the use of estimates which are inherently inaccurate since they rely upon laboratory testwork. Testwork consists of 60 day leach columns from which we project metal recoveries into the future. The quantities of metal contained in the ore are based upon actual weights and assay analysis. The rate at which the leach process extracts gold and silver from the crushed ore is based upon laboratory column tests and actual experience occurring over approximately twenty years of leach pad operation at the Rochester Mine. The assumptions we use to measure metal content during each stage of the inventory conversion process includes estimated recovery rates based on laboratory testing and assaying. We periodically review our estimates compared to actual experience and revise our estimates when appropriate. The length of time necessary to achieve our currently estimated ultimate recoveries of 61.5% for silver and 93% for gold is estimated to be between 5 and 10 years. However, the ultimate recovery will not be known until leaching operations cease, which is currently estimated for 2011.

        When we began operations at the Rochester mine in 1986, based solely on laboratory testing, we estimated the ultimate recovery of silver and gold at 50% and 80%, respectively. Since 1986, we have adjusted the expected ultimate recovery 3 times (once in each of 1989, 1997 and 2003) based upon actual experience gained from leach operations. In 1989, we increased our estimated recoveries for silver and gold to 55% and 85%, respectively. The change was accounted for prospectively as a change in estimate, which had the effect of increasing the estimated recoverable ounces of silver and gold contained in the heap by 1.6 million ounces and 10,000 ounces, respectively. In 1997, we revised our estimated recoveries for silver and gold to 59% and 89%, respectively, which increased the estimated recoverable ounces of silver and gold contained in the heap by 4.7 million ounces and 39,000 ounces, respectively. Finally, in 2003, we revised our estimated recoveries for silver and gold to 61.5% and 93%, respectively, which increased the estimated recoverable ounces of silver and gold contained in the heap by 1.8 million ounces and 41,000 ounces, respectively.

        If our estimate of ultimate recovery requires adjustment, the impact upon our inventory valuation and upon our income statement would be as follows:

42


Positive/Negative
Change in Silver Recovery

Positive/Negative
Change in Gold Recovery

1%
2%
3%
1%
2%
3%
Quantity of recoverable                            
  ounces    1.7 million  3.5 million  5.2 million  13,214    26,428    39,642  
Positive impact on  
  future cost of  
  production per silver  
  equivalent ounce for  
  increases in recovery  
  rates   $ 1.28   $ 2.20   $ 2.90   $ 0.54   $ 1.01   $ 1.43  
Negative impact on  
  future cost of  
  production per silver  
  equivalent ounce for  
  decreases in recovery  
  rates   $ 1.90   $ 4.99   $10.98   $ 0.63   $ 1.36   $ 2.24  

        Inventories of ore on leach pads are valued based upon actual production costs incurred to produce and place such ore on the leach pad during the current period, adjusted for the effects on monthly production of costs of abnormal production levels, less costs allocated to minerals recovered through the leach process. The costs consist of those production activities occurring at the mine site and include the costs, including depreciation, associated with mining, crushing and precipitation circuits. In addition, refining is provided by a third party refiner to place the metal extracted from the leach pad in a saleable form. These additional costs are considered in the valuation of inventory.

Reclamation and remediation costs. Reclamation and remediation costs are based principally on legal and regulatory requirements. Management estimates costs associated with reclamation of mining properties as well as remediation cost for inactive properties. Such costs related to active mines are accrued and charged over the expected operating lives of the mines using the units-of-production method.

        The estimated undiscounted cash flows generated by our assets and the estimated liabilities for reclamation and remediation are determined using the Company’s assumptions about future costs, mineral prices, mineral processing recovery rates, production levels and capital and reclamation costs. Such assumptions are based on the Company’s current mining plan and the best available information for making such estimates. On an ongoing basis, management evaluates its estimates and assumptions; however, actual amounts could differ from those based on such estimates and assumptions.

Income taxes. The Company computes income taxes in accordance with SFAS No. 109, “Accounting for Income Taxes.” SFAS No. 109 requires an asset and liability approach which results in the recognition of deferred tax liabilities and assets for the expected future tax consequences or benefits of temporary differences between the financial reporting basis and the tax basis of assets and liabilities, as well as operating loss and tax credit carryforwards, using enacted tax rates in effect in the years in which the differences are expected to reverse.

        In assessing the realizability of deferred tax assets, management considers whether it is more likely than not that some portion or all of the deferred tax assets will not be realized. Management considers the scheduled reversal of deferred tax liabilities, projected future taxable income and tax planning strategies in making this assessment. A valuation allowance has been provided for the portion of the Company’s net deferred tax assets for which it is more likely than not that they will not be realized.

43


RESULTS OF OPERATIONS

        Three Months Ended June 30, 2007 Compared to Three Months Ended June 30, 2006

Revenues

        Sales of metal from continuing operations in the second quarter of 2007 decreased by $2.4 million, or 4.4%, from the second quarter of 2006 to $51.7 million. The decrease in sales of metal is attributable to a 13.7% decrease in the quantity of ounces sold partially offset by increased metal prices realized. In the second quarter of 2007, the Company sold 2.8 million ounces of silver and 25,500 ounces of gold compared to 3.2 million ounces of silver and 29,200 ounces of gold for the same period in 2006. Realized silver and gold prices were $13.47 and $665 per ounce, respectively, in the second quarter of 2007 compared to $13.10 and $649, respectively, for the comparable quarter of 2006.

        Included in revenues is the by-product revenue associated with by-product metal sales consisting primarily of gold. In the second quarter of 2007, by-product revenues totaled $17.0 million compared to $18.4 million for the same period of 2006. The Company believes, based on the best estimates, that presentation of these revenue streams as by-products from its current operations will continue to be appropriate in the future.

        In the second quarter of 2007, the Company produced a total of 3,006,694 ounces of silver and 25,453 ounces of gold, compared to 3,184,986 ounces of silver and 29,039 ounces of gold in the second quarter of 2006. The decrease in silver production is primarily due to decreased production from the Cerro Bayo and Broken Hill mines, offset by increased production for the Rochester, Martha and Endeavor mines.

Costs and Expenses

        Production costs applicable to sales from continuing operations in the second quarter of 2007 increased by $5.2 million, or 23.9%, from the second quarter of 2006 to $26.7 million. The increase in production costs in the second quarter of 2007 is primarily due to higher costs of labor, fuel, power and other consumables.

        Depreciation and depletion decreased by $1.2 million, or 17.7%, in the second quarter of 2007 compared to the prior year’s second quarter, primarily due to decreased depletion expense from the Rochester operations.

        Administrative and general expenses increased by $1.2 million in the second quarter of 2007 compared to the same period in 2006 and is due to business development activities primarily related to the proposed Bolnisi and Palmarejo merger and increases in compensation costs and other general and administrative expenses.

        Exploration expenses increased by $0.6 million in the second quarter of 2007 compared to the same period in 2006 as a result of increased exploration activity.

        Litigation settlement expenses decreased by $0.5 million from the second quarter of 2006. During the first quarter of 2007, the Company accrued the remainder of its final royalty payment to the U.S. government called for under the May 2001 settlement agreement relating to the federal natural resources action.

44


Other Income and Expenses

        Interest and other income in the second quarter of 2007 decreased by $0.5 million to $4.3 million compared with the second quarter of 2006. The decrease was primarily due to lower levels of invested cash and short-tem investments on hand during the second quarter of 2007 compared to the prior year’s quarter.

        Interest expense in the second quarter of 2007 decreased by $0.3 million compared to the second quarter of 2006. The decrease in interest expense is related to an increase in the amount of interest expense capitalized as a result of higher capitalized expenditures at the Kensington and San Bartolome development projects. Capitalized interest was $0.6 million in the second quarter of 2007 compared to $0.3 million in the prior year’s second quarter.

Income Taxes

        For the three months ended June 30, 2007, the Company reported an income tax provision of approximately $3.2 million compared to an income tax provision of $2.8 million in the second quarter of 2006. The following table summarizes the components of the Company’s income tax provision for the three months ended June 30, 2007 and 2006.

Three Months Ended
June 30,

2007
2006
Current:            
    United States - Alternative minimum tax   $ (76 ) $ (369 )
    United States - Foreign withholding    (283 )  (169 )
    Foreign - Argentina    (1,308 )  (1,900 )
    Foreign - Australia    (659 )  (1,449 )
Deferred:  
    Foreign - Argentina    (349 )  279  
    Foreign - Australia    (461 )  425  
    Foreign - Chile    (91 )  354  


    Income tax provision   $ (3,227 ) $ (2,829 )


        During the second quarter of 2007, due to higher metals prices, the Company recognized a current provision in the U.S. and certain foreign operating jurisdictions. Further, the Company accrued foreign withholding taxes of approximately $0.3 million on inter-company transactions from the U.S. parent to the Argentina and Australia subsidiaries. Finally, the Company recognized a $0.9 million deferred tax provision in foreign jurisdictions from utilization of tax loss carryforwards in Chile and the recognition of taxable temporary differences in Argentina and Australia.

        During the second quarter of 2006, due to significantly higher metals prices, the Company recognized a current provision in the U.S. and certain foreign operating jurisdictions. Further, the Company recognized a $0.4 million deferred tax benefit in Chile related to the release of valuation allowance on net operating loss carryforwards due to significantly higher metal prices and additional proven and probable reserves.

Results of Discontinued Operations

        On June 1, 2006, the Company completed the sale of 100% of the shares of Coeur Silver Valley Inc. to U.S. Silver Corporation for $15 million in cash plus a post-closing working capital adjustment of $1.1 million. Pursuant to FAS 144, Accounting for the Impairment of Long-Lived Assets, Coeur Silver Valley was classified as an asset for sale and the results of operations reported in discontinued operations for all periods presented. The Company recognized a gain of $11.2 million on the sale in the quarter ended June 30, 2006.

45


        The following is a summary of the Company’s discontinued operations included in the consolidated statements of operations for the three months ended June 30, 2006 (in thousands):

Three Months Ended
June 30, 2006

Sales of metal     $ 5,513  
Production costs applicable to sales    (3,973 )
Depreciation and depletion    (86 )
Mining exploration    (69 )
Other    (28 )

Income from discontinued operations   $ 1,357  
Gain on sale of net assets of discontinued operations    11,159  

Net income from discontinued operations   $ 12,516  

        Six Months Ended June 30, 2007 Compared to Six Months Ended June 30, 2006

Revenues

        Sales of metal from continuing operations in the six months ended June 30, 2007 increased by $3.6 million, or 3.7%, over the same period of 2006 to $102.5 million. The increase in product sales of metal was primarily attributable to higher realized metal prices, partially offset by a decrease in the quantity of ounces sold during the six months ended June 30, 2007 compared to the same period in 2006. In the six months ended June 30, 2007, the Company sold 5.5 million ounces of silver and 50,200 ounces of gold compared to 6.1 million ounces of silver and 54,900 ounces of gold for the same period in 2006. Realized silver and gold prices were $13.60 and $655 per ounce, respectively, in the six months ended June 30, 2007 compared to $11.82 and $620, respectively, in the comparable period of 2006.

        Included in revenues is the by-product revenue associated with by-product metal sales consisting of gold. In the six months ended June 30, 2007, by-product revenues totaled $33.3 million compared to $33.4 million for the same period of 2006. The decrease in by-product revenues is primarily due to a decrease in the number of gold ounces sold offset by an increase in the realized prices for gold. The Company believes, based on best estimates, that presentation of these revenue streams as by-products will continue to be appropriate in the future.

        In the six months ended June 30, 2007, the Company’s continuing operations produced a total of 5,627,661 ounces of silver and 50,005 ounces of gold, compared to 6,034,249 ounces of silver and 54,620 ounces of gold in the same period of 2006. The decrease in silver production is primarily due to decreased production from the Cerro Bayo and Broken Hill mines, offset by increased production from the Rochester, Martha and Endeavor mines.

Costs and Expenses

        Production costs applicable to sales from continuing operations in the six months ended June 30, 2007 increased by $6.1 million, or 14.6%, from the same period of 2006 to $47.8 million. The increase in the six months ended June 30, 2007 is primarily due to higher costs of labor, fuel, power and other consumables.

        Depreciation and depletion decreased by $0.5 million, or 4%, for the first six months of 2007 compared to the first six months of 2006 primarily due to lower depletion expense from the Rochester mine.

        Administrative and general expenses increased by $2.3 million, or 24%, in the six months ended June 30, 2007 compared to the same period in 2006 due to business development activities primarily related to the proposed Bolnisi and Palmarejo merger.

46


        Exploration expenses increased by $1.5 million in the six months ended June 30, 2007 compared to the same period in 2006 as a result of increased exploration activity.

        Litigation settlement expense increased slightly in the first six months of 2007 to $0.5 million as a result of accruals pursuant to the Federal Natural Resource settlement decree dated May 14, 2001. Under the terms of the settlement, the Company is required to pay a net smelter royalty on all of its domestic and foreign operations until the earlier of May 14, 2021 or once the cumulative amount of $3.0 million has been paid. The Company has made its final payment to the U.S. government called for under the May 2001 settlement agreement.

Other Income and Expenses

        Interest and other income in the six months ended June 30, 2007 increased by $1.6 million to $8.9 million compared with the same period of 2006. The increase was primarily due to higher levels of invested cash and short-term investments on hand during the six months ended June 30, 2007 compared to the same period in 2006.

        Interest expense was $0.2 million in the six months ended June 30, 2007 compared to $0.9 million in the six months ended June 30, 2006. The decrease in interest expense is due to an increase in the amounts of interest expense capitalized as a result of higher capital expenditures at the Kensington and San Bartolome development projects. Capitalized interest was $1.1 million in the six months ended June 30, 2007 compared to $0.4 million in the same period of 2006.

Income Taxes

        For the six months ended June 30, 2007, the Company reported an income tax provision of approximately $6.9 million compared to an income tax provision of $2.5 million in the same period of 2006. The following table summarizes the components of the Company’s income tax provision for the six months ended June 30, 2007 and 2006.

Six Months Ended
June 30,

2007
2006
Current:            
    United States - Alternative minimum tax   $ (309 ) $ (469 )
    United States - Foreign withholding    (666 )  (492 )
    Foreign - Argentina    (2,906 )  (2,511 )
    Foreign - Australia    (1,773 )  (2,141 )
Deferred:  
    Foreign - Argentina    (174 )  492  
    Foreign - Australia    (361 )  199  
    Foreign - Chile    (739 )  2,441  


    Income tax provision   $ (6,928 ) $ (2,481 )


        During the six months ended June 30, 2007, due to higher metals prices, the Company recognized a current provision in the U.S. and certain foreign operating jurisdictions. Further, the Company accrued foreign withholding taxes of approximately $0.7 million on inter-company transactions from the U.S. parent to the Argentina and Australia subsidiaries. Finally, the Company recognized a $1.3 million deferred tax provision in foreign jurisdictions from utilization of tax loss carryforwards in Chile and the recognition of taxable temporary differences in Argentina and Australia. During the six months ended June 30, 2007, the Company recorded $0.5 million in income tax provision resulting from its assessment of prior period tax contingencies across its various tax jurisdictions.

47


        During the six months ended June 30, 2006, due to significantly higher metals prices, the Company recognized a current provision in the U.S. and certain foreign operating jurisdictions. Further, the Company recognized a $2.4 million deferred tax benefit in Chile related to the release of valuation allowance on net operating loss carryforwards due to significantly higher metal prices and additional proven and probable reserves.

Results of Discontinued Operations

        On June 1, 2006, the Company completed the sale of 100% of the shares of Coeur Silver Valley Inc. to U.S. Silver Corporation for $15 million in cash plus a post-closing working capital adjustment of $1.1 million. Pursuant to FAS 144, Accounting for the Impairment or Disposal of Long-Lived Assets, Coeur Silver Valley was classified as an asset held for sale and the results of operations reported in discontinued operations for all periods presented. The Company recognized a gain of approximately $11.2 million on the sale in the six months ended June 30, 2006.

        The following is a summary of the Company’s discontinued operations included in the consolidated statements of operations for the six months ended June 30, 2006 (in thousands):

Six Months Ended
June 30, 2006

Sales of metal     $ 11,223  
Production costs applicable to sales    (8,233 )
Depreciation and depletion    (681 )
Mining exploration    (279 )
Other    (62 )

Income from discontinued operations   $ 1,968  
Gain on sale of net assets of discontinued operations    11,159  

Net income from discontinued operations   $ 13,127  

LIQUIDITY AND CAPITAL RESOURCES

Working Capital; Cash and Cash Equivalents

        The Company’s working capital at June 30, 2007, decreased by $71.7 million to approximately $311.4 million compared to $383.1 million at December 31, 2006. The decrease in working capital was primarily attributed to decreased cash flow and increased capital spending related to the Kensington and San Bartolome projects. The ratio of current assets to current liabilities was 5.9 to 1 at June 30, 2007, compared to 7.5 to 1 at December 31, 2006.

        Net cash provided by operating activities in the second quarter of 2007 was $11.5 million compared to net cash provided by operating activities of $32.0 million in the second quarter of 2006. The decrease of $20.5 million in cash flow from operations is primarily due to the change in net income. Net cash used in investing activities in the second quarter of 2007 was $52.9 million compared to net cash used in investing activities of $6.2 million in the prior year’s comparable period. The decrease of $46.7 million in cash used in investing activities is due to an increase in purchases of short-term investments and an increase in capital expenditures related to construction activities at the Kensington and San Bartolome projects. Net cash used in financing activities was $0.4 million in the second quarter of 2007, compared to $0.1 million used in the second quarter of 2006. As a result of the above, cash and cash equivalents decreased by $41.8 million in the second quarter of 2007 compared to an increase of $25.7 million for the comparable period in 2006.

        Net cash provided by operating activities in the six months ended June 30, 2007 was $34.2 million compared to net cash provided by operating activities of $49.2 million in the six months ended June 30, 2006. The decrease of $15.0 million in cash flow from operations is primarily due to the change in net income. Net cash used in investing activities in the first six months of 2006 was $67.6 million compared to net cash used in investing activities of $35.8 million in the prior year’s comparable period. The increase of $31.8 million in cash used in investing activities is due to an increase in capital expenditures related to construction activities at the Kensington and San Bartolome projects and due to the fact $14.4 million was provided by the sale of discontinued operations in 2006. Net cash used in financing activities was $1.1 million in the first six months of 2007, compared to $145.4 million provided by financing activities in the first six months of 2006. The decrease was primarily due to the receipt of proceeds from the issuance of common stock which was completed in the first quarter of 2006. As a result of the above, cash and cash equivalents decreased by $34.4 million in the first six months of 2007 compared to an increase of $158.8 million for the comparable period in 2006.

48


Debt and Capital Resources

        At June 30, 2007, the Company had $272.5 million of cash, cash equivalents and short-term investments. Management therefore believes that its existing and available cash and cash flow from operations will allow it to meet its obligations for the next twelve months. The Company estimates approximately $185.1 million will be spent in the remainder of 2007 on capital expenditures at its operating mines and development-stage properties.

Issuance of Common Stock

        During the first quarter of 2006, the Company completed a public offering of 27.6 million shares of common stock at a public offering price of $5.60 per share. The Company realized net proceeds of $146.2 million after payment of the underwriters’ discount.

Litigation and Other Events

Federal Natural Resources Action

          On March 22, 1996, an action was filed in the United States District Court for the District of Idaho by the United States against various defendants, including the Company, asserting claims under CERCLA and the Clean Water Act for alleged damages to federal natural resources in the Coeur d’Alene River Basin of Northern Idaho. The damages are claimed to result from alleged releases of hazardous substances from mining activities conducted in the area since the late 1800s.

        In May 2001, the Company and representatives of the U.S. Government, including the Environmental Protection Agency, the Department of Interior and the Department of Agriculture, reached an agreement to settle the lawsuit. The terms of settlement, which have been fully satisfied by the Company as of June 30, 2007, are set forth in a Consent Decree issued by the court. Pursuant to the terms of the Consent Decree, dated May 14, 2001, the Company paid the U.S. Government a total of approximately $3.9 million in 2001. In addition, the Company (i) will pay the United States 50% of any future recoveries from insurance companies for claims for defense and indemnification under general liability insurance policies in excess of $0.6 million, (ii) has accomplished certain cleanup work on the Mineral Point property and Caladay property, and (iii) has made a conveyance to the U.S. of certain real property to be used as a waste repository. Finally, commencing five years after effectiveness of the settlement (or May 14, 2006), the Company was obligated to pay royalties on all of its domestic and foreign operating properties, up to a cumulative of $3 million, amounting to a 2% net smelter royalty on silver production if the price of silver exceeds $6.50 per ounce, and a $5.00 per ounce royalty on gold production if the price of gold exceeds $325 per ounce. The royalty payment obligation commenced on May 14, 2006 and was to expire May 14, 2021. As of June 30, 2007, the entire $3.0 million has been paid. The Company does not anticipate that there will be any future recoveries from insurance companies. Therefore, the terms of settlement have been fully satisfied.

49


States of Maine, Idaho And Colorado Superfund Sites Related to Callahan Mining Corporation

        During 2001, the United States Forest Service (USFS) made a formal request for information regarding the Deadwood Mine Site located in central Idaho. Callahan Mining Corporation had operated at this site during the 1940‘s. The USFS believes that some cleanup action is required at the location. However, Coeur d’Alene Mines Corporation did not acquire Callahan until 1991, more than 40 years after Callahan disposed of its interest in the Deadwood property. The Company did not make any decisions with respect to generation, transport or disposal of hazardous waste at the site. Therefore, it is believed that the Company is not liable for any cleanup, and if Callahan might be liable, it has no substantial assets with which to satisfy any such liability. To date no claim has been made by the United States for any cleanup costs against either the Company or Callahan.

        During 2002, the EPA made a formal request for information regarding a Callahan mine site in the State of Maine. Callahan operated there in the late 1960‘s, shut the operations down in the early 1970‘s and disposed of the property. The EPA contends that some cleanup action is warranted at the site, and listed it on the National Priorities List in late 2002. The Company believes that because it made no decisions with respect to generation, transport or disposal of hazardous waste at this location, it is not liable for any cleanup costs. If Callahan might have liability, it has no substantial assets with which to satisfy such liability. To date, no claim has been made for any cleanup costs against either the Company or Callahan.

        In January 2003, the USFS made a formal request for information regarding a Callahan mine site in the State of Colorado known as the Akron Mine Site. Callahan operated there in approximately the late 1930s through the 1940s, and to the Company’s knowledge, disposed of the property. The Company is not aware of what, if any, cleanup action the Forest Service is contemplating. However, the Company did not make decisions with respect to generation, transport or disposal of hazardous waste at this location, and therefore believes it is not liable for any cleanup costs. If Callahan might have liability, it has no substantial assets with which to satisfy such liability. To date, no claim has been made for any cleanup costs against either the Company or Callahan.

Federal District Court of Alaska Permit Challenge

        On September 12, 2005 three environmental groups (“Plaintiffs”) filed a lawsuit in Federal District Court in Alaska (the “District Court”) against the U.S. Army Corps of Engineers (“Corps of Engineers”) and the U.S. Forest Service (“USFS”) seeking to invalidate the permit issued to Coeur Alaska, Inc. for the Company’s Kensington mine. The Plaintiffs claim the Clean Water Act (CWA) Section 404 permit issued by the Corps of Engineers authorizing the deposition of mine tailings into Lower Slate Lake conflicts with the CWA and is thus illegal. They additionally claim the USFS’s approval of the Amended Plan of Operations is arbitrary and capricious because it relies on the 404 permit issued by the Corps of Engineers.

        Following District Court’s remand of the Section 404 permit to the Corps of Engineers for further review, the Corps reinstated the Company’s permit on March 29, 2006. The lawsuit challenging the permit was re-opened on April 6, 2006; Coeur filed its answer to the Amended Complaint; and Coeur, the State of Alaska, and Goldbelt, Inc., a local native corporation, were granted Defendant-Intervenor status to join the agencies in their defense of the permit. On August 4, 2006, the District Court dismissed the Plaintiffs’ challenge and upheld the Section 404 permit. Plaintiffs appealed that decision to the Ninth Circuit Court of Appeals (the “Circuit Court”), and on August 24, 2006, the Circuit Court granted a temporary injunction pending appeal enjoining certain activities relating to the Lake Tailings facility.

        On March 7, 2007, the Department of Justice (“DOJ”), on behalf of the Corps of Engineers, filed a motion for authorization under injunction pending appeal to permit construction of a western interception ditch which related to site stabilization due to spring snowmelt. On March 16, 2007, the Circuit Court panel issued an Order which denied the western interception ditch work plan.

50


        On May 22, 2007 the Ninth Circuit Court of Appeals reversed the District Court’s August 4, 2006 decision which had upheld the Company’s 404 permit and issued its opinion that remanded the case to the District Court with instructions to vacate the Company’s 404 permit as well as the USFS Record of Decision approving the general tailings disposal plan as well as the Goldbelt 404 permit to construct the Cascade Point Marine Facility. The DOJ, on behalf of the Corps of Engineers and the USFS, filed for an extension of time to file a Petition for Rehearing with the Ninth Circuit. The extension was granted on June 29, 2007. The deadline for filing a Petition for Rehearing to the Ninth Circuit is August 20, 2007. The Company intends to seek an appeal to the Ninth Circuit court.

        No assurance can be given as to whether or when regulatory permits and approvals granted to the Company may be further challenged, appealed or contested by third parties or issuing agencies, or as to whether the Company will place the Kensington project into commercial production.

        This litigation has contributed to an increase in capital costs. While the Company cannot now predict with certainty the outcome of this litigation, it believes it should ultimately prevail. In the event that the Company does not prevail, it could be necessary to seek an alternate site for the tailings disposal facility. The Company is not aware of an alternate site that could be permitted or would be economic. Therefore, it is possible that the failure to obtain reversal upon appeal could render the project uneconomic and an asset impairment would be necessary. In addition, based upon the Company’s current estimates, an impairment writedown could be necessary should the expectation of the long-term price for gold decrease below approximately $540 per ounce. As of June 30, 2007, the Kensington project has a carrying value of its long-lived assets of $264 million.

Item 3.  Quantitative and Qualitative Disclosure About Market Risk

        The Company is exposed to various market risks as a part of its operations. In an effort to mitigate losses associated with these risks, the Company may, at times, enter into derivative financial instruments. These may take the form of forward sales contracts, foreign currency exchange contracts and interest rate swaps. The Company does not actively engage in the practice of trading derivative securities for profit. This discussion of the Company’s market risk assessments contains “forward looking statements” that contain risks and uncertainties. Actual results and actions could differ materially from those discussed below.

        The Company’s operating results are substantially dependent upon the world market prices of silver and gold. The Company has no control over silver and gold prices, which can fluctuate widely and are affected by numerous factors, such as supply and demand and investor sentiment. In order to mitigate some of the risk associated with these fluctuations, the Company will at times, enter into forward sale contracts. The Company continually evaluates the potential benefits of engaging in these strategies based on current market conditions. The Company may be exposed to nonperformance by counterparties as a result of its hedging activities. This exposure would be limited to the amount that the market price of the metal falls short of the contract price. The Company has historically sold silver and gold produced by our mines pursuant to forward contracts and at spot prices prevailing at the time of sale. Since 1999, the Company has not engaged in any silver hedging activities and is currently not engaged in any gold hedging activities.

        The Company enters into concentrate sales contracts with third-party smelters. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices and the provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative, which is the final settlement price based on a future price, does not qualify for hedge accounting. These embedded derivatives are recorded as derivative assets (in Prepaid expenses and other), or derivative liabilities (in Accrued liabilities and other), on the balance sheet and are adjusted to fair value through earnings each period until the date of final settlement.

51


        At June 30, 2007, the Company had outstanding provisionally priced sales of $73.1 million, consisting of 3.8 million ounces of silver and 34,159 ounces of gold, which had a fair value of approximately $73.1 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $38,300; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $34,200.

        The Company operates in several foreign countries, specifically Bolivia, Chile, and Argentina, which exposes it to risks associated with fluctuations in the exchange rates of the currencies involved. As part of its program to manage foreign currency risk, from time to time, the Company enters into foreign currency forward exchange contracts. These contracts enable the Company to purchase a fixed amount of foreign currencies. Gains and losses on foreign exchange contracts that are related to firm commitments are designated and effective as hedges and are deferred and recognized in the same period as the related transaction. All other contracts that do not qualify as hedges are marked to market and the resulting gains or losses are recorded in income. The Company continually evaluates the potential benefits of entering into these contracts to mitigate foreign currency risk and proceeds when it believes that the exchange rates are most beneficial. The Company, from time to time, enters into forward foreign currency exchange contracts to reduce the foreign exchange risk associated with forecasted Chilean peso operating costs for 2007 at its Cerro Bayo mine. The contracts require the Company to exchange U.S. dollars for Chilean pesos at a weighted average exchange rate of 535 pesos to each U.S. dollar. At June 30, 2007, the Company had foreign exchange contracts of $3.9 million in U.S. dollars which settle monthly through the remainder of 2007. For the six months ended June 30, 2007, the Company recorded a realized gain of approximately $27,000 in connection with its foreign currency hedging program. As of June 30, 2007, the fair value of the foreign exchange contracts was an asset of $0.3 million.

        All of the Company’s long-term debt at June 30, 2007, is fixed-rate based. The fair value of the Company’s long-term debt at June 30, 2007 was $159.5 million. The fair value was estimated based upon bond market closing prices at June 30, 2007.

Item 4.  Controls and Procedures

(a) Disclosure Controls and Procedures

        The Company’s disclosure controls and procedures are designed to provide reasonable assurance that information required to be disclosed by it in its periodic reports filed with the Securities and Exchange Commission is recorded, processed, summarized and reported, within the time periods specified in the Commission’s rules and forms. Based on an evaluation of the Company’s disclosure controls and procedures conducted by the Company’s Chief Executive Officer and Chief Financial Officer, such officers concluded at June 30, 2007, that the Company’s disclosure controls and procedures were effective at a reasonable level.

(b) Changes in Internal Control Over Financial Reporting

        Based on an evaluation by the Company’s Chief Executive Officer and Chief Financial Officer, such officers concluded that there was no change in the Company’s internal control over financial reporting during the quarter ending June 30, 2007 that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

52


PART II. Other Information

Item 1.  Legal Proceedings.

Kensington Project Permit Challenge

        On September 12, 2005 three environmental groups (“Plaintiffs”) filed a lawsuit in Federal District Court in Alaska (the “District Court”) against the U.S. Army Corps of Engineers (“Corps of Engineers”) and the U.S. Forest Service (“USFS”) seeking to invalidate the permit issued to Coeur Alaska, Inc. for the Company’s Kensington mine. The Plaintiffs claim the Clean Water Act (CWA) Section 404 permit issued by the Corps of Engineers authorizing the deposition of mine tailings into Lower Slate Lake conflicts with the CWA and is thus illegal. They additionally claim the USFS’s approval of the Amended Plan of Operations is arbitrary and capricious because it relies on the 404 permit issued by the Corps of Engineers.

        Following District Court’s remand of the Section 404 permit to the Corps of Engineers for further review, the Corps reinstated the Company’s permit on March 29, 2006. The lawsuit challenging the permit was re-opened on April 6, 2006; Coeur filed its answer to the Amended Complaint; and Coeur, the State of Alaska, and Goldbelt, Inc., a local native corporation, were granted Defendant-Intervenor status to join the agencies in their defense of the permit. On August 4, 2006, the District Court dismissed the Plaintiffs’ challenge and upheld the Section 404 permit. Plaintiffs appealed that decision to the Ninth Circuit Court of Appeals (the “Circuit Court”), and on August 24, 2006, the Circuit Court granted a temporary injunction pending appeal enjoining certain activities relating to the Lake Tailings facility.

        On March 7, 2007, the Department of Justice (“DOJ”), on behalf of the Corps of Engineers, filed a motion for authorization under injunction pending appeal to permit construction of a western interception ditch which related to site stabilization due to spring snowmelt. On March 16, 2007, the Circuit Court panel issued an Order which denied the western interception ditch work plan.

        On May 22, 2007 the Ninth Circuit Court of Appeals reversed the District Court’s August 4, 2006 decision which had upheld the Company’s 404 permit and issued its opinion that remanded the case to the District Court with instructions to vacate the Company’s 404 permit as well as the USFS Record of Decision approving the general tailings disposal plan as well as the Goldbelt 404 permit to construct the Cascade Point Marine Facility. The DOJ, on behalf of the Corps of Engineers and the USFS, filed for an extension of time to file a Petition for Rehearing with the Ninth Circuit. The extension was granted on June 29, 2007. The deadline for filing a Petition for Rehearing to the Ninth Circuit is August 20, 2007. The Company intends to seek an appeal to the Ninth Circuit court. The Company cannot now predict the potential for obtaining an appeal or if it will prevail upon appeal if one is granted.

Item 1A.  Risk Factors

        Item 1A (“Risk Factors”) of the Company’s Annual Report on Form 10-K for the year ended December 31, 2006 sets forth information relating to important risks and uncertainties that could materially adversely affect the Company’s business, financial condition or operating results. Those risk factors continue to be relevant to an understanding of the Company’s business, financial condition and operating results. Certain of those risk factors have been updated in this Form 10-Q to provide updated information, as set forth below. References to “we,” “our” and “us” in these risk factors refer to the Company.

53


We may have to record additional write-downs, which could negatively impact our results of operations.

        Statement of Financial Accounting Standards No. 144, Accounting for the Impairment or Disposal of Long-Lived Assets (SFAS 144) established accounting standards for impairment of the value of long-lived assets such as mining properties. SFAS 144 requires a company to review the recoverability of the cost of its assets by estimating the future undiscounted cash flows expected to result from the use and eventual disposition of the asset. Impairment must be recognized when the carrying value of the asset exceeds these cash flows, and recognizing impairment write-downs could negatively impact our results of operations.

        If silver or gold prices decline or we fail to control production costs or realize the mineable ore reserves at our mining properties, we may be required to recognize further asset write-downs. We also may record other types of additional mining property write-downs in the future to the extent a property is sold by us for a price less than the carrying value of the property, or if liability reserves have to be increased in connection with the closure and reclamation of a property. Additional write-downs of mining properties could negatively impact our results of operations.

        The Kensington property has been the subject of litigation involving a permit required to complete construction of a required tailings facility. On September 12, 2005 three environmental groups (“Plaintiffs”) filed a lawsuit in Federal District Court in Alaska against the U.S. Army Corps of Engineers (“Corps of Engineers”) and the U.S. Forest Service (“USFS”) seeking to invalidate the permit issued to Coeur Alaska, Inc. for the Company’s Kensington mine. The Plaintiffs claim the Clean Water Act (CWA) Section 404 permit issued by the Corps of Engineers authorizing the deposition of mine tailings into Lower Slate Lake conflicts with the CWA. They additionally claim the USFS’s approval of the Amended Plan of Operations is arbitrary and capricious because it relies on the 404 permit issued by the Corps of Engineers.

        On August 4, 2006, the Federal District Court in Alaska dismissed the Plaintiffs’ challenge and upheld the Section 404 permit. On August 7, 2006 the Plaintiffs filed a Notice of Appeal of the decision to the Ninth Circuit Court of Appeals (Circuit Court) and on August 9, 2006 the Plaintiffs additionally filed a Motion for Injunction Pending Appeal with the Circuit Court. The Circuit Court granted a temporary injunction pending appeal on August 24, 2006, enjoining certain activities relating to the lake tailings facility.

        On May 22, 2007 the Ninth Circuit Court of Appeals reversed the District Court’s August 4, 2006 decision which had upheld the Company’s 404 permit and issued its opinion that remanded the case to the District Court with instructions to vacate the Company’s 404 permit as well as the USFS Record of Decision approving the general tailings disposal plan as well as the Goldbelt 404 permit to construct the Cascade Point Marine Facility. The DOJ, on behalf of the Corps of Engineers and the USFS, filed for an extension of time to file a Petition for Rehearing with the Ninth Circuit. The extension was granted on June 29, 2007. The deadline for filing a Petition for Rehearing to the Ninth Circuit is August 20, 2007. The Company intends to seek an appeal to the Ninth Circuit court.

        This litigation has contributed to an increase in capital costs. While the Company cannot now predict with certainty the outcome of this litigation, it believes it should ultimately prevail. In the event that the Company does not prevail, it could be necessary to seek an alternate site for the tailings disposal facility. The Company is not aware of an alternate site that could be permitted or would be economic. Therefore, it is possible that the failure to obtain reversal upon appeal could render the project uneconomic and an asset impairment would be necessary. In addition, based upon the Company’s current estimates, an impairment writedown could be necessary should the expectation of the long-term price for gold decrease below approximately $540 per ounce. As of June 30, 2007, the Kensington project has a carrying value of its long-lived assets of $264 million.

54


We may be required to incur additional indebtedness to fund our capital expenditures.

        We have historically financed our operations through the issuance of common stock and convertible debt, and may be required to incur additional indebtedness in the future. During 2004, we commenced construction at the San Bartolome project and in 2005 we commenced construction at the Kensington project. Construction of both projects could require a total capital investment of approximately $412.0 million of which approximately $142.8 million will be required in future periods. While we believe that our cash, cash equivalents and short-term investments combined with cash flow generated from operations will be sufficient for us to make this level of capital investment, no assurance can be given that additional capital investments will not be required to be made at these or other projects. If we are unable to generate enough cash to finance such additional capital expenditures through operating cash flow and the issuance of common stock, we may be required to issue additional indebtedness. Any additional indebtedness would increase our debt payment obligations, and may negatively impact our results of operations.

Prior to 2005, we did not have sufficient earnings to cover fixed charges, which deficiency could occur in future periods.

        As a result of our net losses prior to 2005, our earnings were not adequate to satisfy fixed charges (i.e., interest, preferred stock dividends and that portion of rent deemed representative of interest) in each of those periods prior to 2005. The amounts by which earnings were inadequate to cover fixed charges were approximately $80.8 million in 2002, $63.9 million in 2003 and $22.7 million in 2004. Earnings have been sufficient to cover fixed charges subsequent to 2004. We are required to make fixed payments on the $180 million principal amount of our 1¼% Senior Convertible Notes due 2024, requiring annual interest payments of approximately $2.25 million until their maturity.

        We expect to satisfy our fixed charges and other expense obligations in the future from cash flow from operations and, if cash flow from operations is insufficient, from working capital, which amounted to approximately $311.4 million at June 30, 2007. Prior to 2005, we experienced negative cash flow from operating activities. The amount of net cash used in our operating activities amounted to approximately $8.5 million in 2002, $5.1 million in 2003 and $18.6 million in 2004. During the years ended December 31, 2006 and 2005, we generated $91.2 million and $6.7 million, respectively, of operating cash flow. The availability of future cash flow from operations or working capital to fund the payment of interest on the notes and other fixed charges will be dependent upon numerous factors, including our results of operations, silver and gold prices, levels and costs of production at our mining properties and the amount of our capital expenditures and expenditures for acquisitions, developmental and exploratory activities.

The market prices of silver and gold are volatile. If we experience low silver and gold prices it may result in decreased revenues and decreased net income or losses, and may negatively affect our business.

        Silver and gold are commodities. Their prices fluctuate, and are affected by many factors beyond our control, including interest rates, expectations regarding inflation, speculation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional demand and production, political and economic conditions and other factors. Because we currently derive approximately 69% of our revenues from continuing operations from sales of silver, our earnings are primarily related to the price of this metal.

        The market prices of silver (Handy & Harman) and gold (London Final) on August 6, 2007 were $12.98 and $672 per ounce, respectively. The prices of silver and gold may decline in the future. Factors that are generally understood to contribute to a decline in the price of silver include sales by private and government holders, and a general global economic slowdown.

        If the prices of silver and gold are depressed for a sustained period and our net losses resume, we may be forced to suspend mining at one or more of our properties until the prices increase, and to record additional asset impairment write-downs. Any lost revenues, continued or increased net losses or additional asset impairment write-downs would adversely affect our results of operations.

55


The estimation of the ultimate recovery of metals contained within the heap leach pad inventory is inherently inaccurate and subjective and requires the use of estimation techniques. Actual recoveries can be expected to vary from estimations.

        The Rochester mine utilizes the heap leach process to extract silver and gold from ore. The heap leach process is a process of extracting silver and gold by placing ore on an impermeable pad and applying a diluted cyanide solution that dissolves a portion of the contained silver and gold, which are then recovered in metallurgical processes.

        The key stages in the conversion of ore into silver and gold are (i) the blasting process in which the ore is broken into large pieces; (ii) the processing of the ore through a crushing facility that breaks it into smaller pieces; (iii) the transportation of the crushed ore to the leach pad where the leaching solution is applied; (iv) the collection of the leach solution; (v) subjecting the leach solution to the precipitation process, in which gold and silver is converted back to a fine solid; (vi) the conversion of the precipitate into doré; and (vii) the conversion by a third party refinery of the doré into refined silver and gold bullion.

        We use several integrated steps to scientifically measure the metal content of ore placed on the leach pads during the key stages. As the ore body is drilled in preparation for the blasting process, samples of the drill residue are assayed to determine estimated quantities of contained metal. We estimate the quantity of ore by utilizing global positioning satellite survey techniques. We then process the ore through a crushing facility where the output is again weighed and sampled for assaying. A metallurgical reconciliation with the data collected from the mining operation is completed with appropriate adjustments made to previous estimates. We then transport the crushed ore to the leach pad for application of the leaching solution. As the leach solution is collected from the leach pads, we continuously sample for assaying. We measure the quantity of leach solution with flow meters throughout the leaching and precipitation process. After precipitation, the product is converted to doré, which is the final product produced by the mine. We again weigh, sample and assay the doré. Finally, a third party smelter converts the doré and determines final ounces of silver and gold available for sale. We then review this end result and reconcile it to the estimates we developed and used throughout the production process. Based on this review, we adjust our estimation procedures when appropriate.

        Our reported inventories include metals estimated to be contained in the ore on leach pad of $70.1 million as of June 30, 2007. Of this amount, $32.7 million is reported as a current asset and $37.4 million is reported as a noncurrent asset. The distinction between current and noncurrent is based upon the expected length of time necessary for the leaching process to remove the metals from the crushed ore. The historical cost of the metal that is expected to be extracted within twelve months is classified as current and the historical cost of metals contained within the crushed ore that will be extracted beyond twelve months is classified as noncurrent. The ore on leach pad inventory is stated at actual production costs incurred to produce and place ore on the leach pad during the current period, adjusted for the effects on monthly production costs of abnormal production levels.

        The estimate of both the ultimate recovery expected over time, and the quantity of metal that may be extracted relative to such twelve month period, requires the use of estimates which are inherently inaccurate since they rely upon laboratory test work. Test work consists of 60 day leach columns from which we project metal recoveries into the future. The quantities of metal contained in the ore are based upon actual weights and assay analysis. The rate at which the leach process extracts gold and silver from the crushed ore is based upon laboratory column tests and actual experience occurring over approximately nineteen years of leach pad operation at the Rochester mine. The assumptions we use to measure metal content during each stage of the inventory conversion process includes estimated recovery rates based on laboratory testing and assaying. We periodically review our estimates compared to actual experience and revise our estimates when appropriate. The length of time necessary to achieve our currently estimated ultimate recoveries of between 59% and 61.5% for silver, depending on the area being leached, and 93% for gold is estimated to be between 5 and 10 years. However, the ultimate recovery will not be known until leaching operations cease, which is currently estimated for approximately 2011.

56


        When we began leach operations in 1986, based solely on laboratory testing, we estimated the ultimate recovery of silver and gold at 50% and 80%, respectively. Since 1986, we have adjusted the expected ultimate recovery three times (once in each of 1989, 1997 and 2003) based upon actual experience gained from leach operations. In 2003, we increased our estimated recoveries for silver and gold, respectively, to between 59% and 61.5%, depending on the area being leached for silver, and 93% for gold. The leach cycle at the Rochester Mine requires leaching to approximately the year 2011 for all recoverable metal to be recovered.

        If our estimate of ultimate recovery requires adjustment, the impact upon our inventory valuation and upon our income statement would be as follows:

Positive/Negative
Change in Silver Recovery

Positive/Negative
Change in Gold Recovery

1%
2%
3%
1%
2%
3%
Quantity of recoverable                            
  ounces    1.7 million  3.5 million  5.2 million  13,214    26,428    39,642  
Positive impact on  
  future cost of  
  production per silver  
  equivalent ounce for  
  increases in recovery  
  rates   $ 1.28   $ 2.20   $ 2.90   $ 0.54   $ 1.01   $ 1.43  
Negative impact on  
  future cost of  
  production per silver  
  equivalent ounce for  
  decreases in recovery  
  rates   $ 1.90   $ 4.99   $10.98   $ 0.63   $ 1.36   $ 2.24  

        Inventories of ore on leach pads are valued based upon actual production costs incurred to produce and place such ore on the leach pad during the current period, adjusted for the effects on monthly production costs of abnormal production levels, less costs allocated to minerals recovered through the leach process. The costs consist of those production activities occurring at the mine site and include the costs, including depreciation, associated with mining, crushing and precipitation circuits. In addition, refining is provided by a third party refiner to place the metal extracted from the leach pad in a saleable form. These additional costs are considered in the valuation of inventory. Negative changes in our inventory valuations and correspondingly on our income statement would have an adverse impact on our results of operations.

We are required to obtain government permits to expand operations or begin new operations. The acquisition of such permits can be materially impacted by third party litigation seeking to prevent the issuance of such permits. The costs and delays associated with such approvals could affect our operations, reduce our revenues, and negatively affect our business as a whole.

        Mining companies are required to seek governmental permits for expansion of existing operations or for the commencement of new operations such as the Kensington development project. Obtaining the necessary governmental permits is a complex and time-consuming process involving numerous jurisdictions and often involving public hearings and costly undertakings. The duration and success of permitting efforts are contingent on many factors that are out of our control. The governmental approval process may increase costs and cause delays depending on the nature of the activity to be permitted, and could cause us to not proceed with the development of a mine. Accordingly, this approval process could harm our results of operations.

        Reference is made to the discussion of the current litigation regarding the validity of the mine tailings permit at the Kensington property in Alaska that is set forth under the above risk factor entitled “We may have to record additional write-downs, which could negatively impact our results of operations.”

57


Our business depends on good relations with our employees.

        The Company could experience labor disputes, work stoppages or other disruptions in production that could adversely affect us. As of June 30, 2007, unions represented approximately 22% of our worldwide workforce. On that date, the Company had 135 employees at its Cerro Bayo mine and 96 employees at its Martha mine who were working under a collective bargaining agreement. The agreement covering the Cerro Bayo mine expires on December 21, 2007 and a collective bargaining agreement covering the Martha mine expires on June 11, 2008.

We are continuously considering possible acquisitions of additional mining properties or interests therein that are located in other countries, and could be exposed to significant risks associated with any such acquisitions.

        In the ordinary course of our business, we are continuously considering the possible acquisition of additional significant mining properties or interests therein that may be located in countries other than those in which we now have operations or interests. Consequently, in addition to the risks inherent in the valuation and acquisition of such mining properties, as well as the subsequent development, operation or ownership thereof, we could be subject to additional risks in such countries as a result of governmental policies, economic instability, currency value fluctuations and other risks associated with the development, operation or ownership of mining properties or interests therein. Such risks could adversely effect our results of operations.

Item 4.  Submission of Matters to a Vote of Security Holders

        The Company’s Annual Meeting of Shareholders was held on May 8, 2007. Of the Company’s total 278,467,240 shares of common stock outstanding on March 22, 2007 (the record date), 222,328,822 shares (or 79.8% of the outstanding) were represented in person or by proxy at the Annual Meeting.

        The first proposal was the election of directors. The following persons were nominated and elected to serve as members of the Board of Directors for one year or until their successors are elected and qualified by the votes indicated: James J. Curran – 213,251,593 shares for and 9,077,229 shares withheld; Sebastian Edwards – 214,362,836 shares for and 7,965,986 shares withheld; Andrew Lundquist – 213,026,989 shares for and 9,301,833 shares withheld; Robert E. Mellor – 212,128,760 shares for and 10,200,062 shares withheld; John H. Robinson – 214,243,544 shares for and 8,085,278 shares withheld; J. Kenneth Thompson– 214,444,021 shares for and 7,884,801 shares withheld; Alex Vitale – 211,555,543 shares for and 10,773,279 shares withheld; Dennis E. Wheeler – 212,563,435 shares for and 9,765,387 shares withheld; and Timothy R. Winterer – 214,402,277 shares for and 7,926,545 shares withheld.

        The second proposal was the proposed ratification of the appointment of KPMG LLP as the Company’s independent accountants. The proposal was approved by the holders of more than the required majority of the shares of common stock voting at the meeting. The proposal was approved by a vote of 218,086,354 shares for (representing 78.3% of the shares voting), 3,262,627 shares against with 979,841 shares abstaining.

58


Item 5.  Other Information

Effective as of July 31, 2007, the Company entered into an amendment to an employment agreement with Donald J. Birak. The sole purpose of the amendment was to extend the term of the employment agreement until June 30, 2009.

Item 6.  Exhibits

  Exhibits.

  2.1 Amending Agreement, dated June 8, 2007, Relating to Merger Implementation Agreement, dated May 3, 2007, by and among the Registrant, Coeur d’Alene Mines Australia Pty Ltd, Coeur Sub Two, Inc. and Bolnisi Gold NL. (Incorporated herein by reference to Exhibit 2.1 to the Registrant’s Form 8-K dated June 8, 2007.)

  2.2 Second Amending Agreement, dated June 22, 2007, Relating to Merger Implementation Agreement, dated May 3, 2007, by and among the Registrant, Coeur d’Alene Mines Australia Pty Ltd, Coeur Sub Two, Inc. and Bolnisi Gold NL, as amended on June 8, 2007. (Incorporated herein by reference to Exhibit 2.1 to the Registrant’s Form 8-K/A Amendment No. 1 dated June 22, 2007.)

  10.1 Second Amendment to Employment Agreement, dated July 31, 2007, to employment agreement dated July 1, 2005, as amended on July 31, 2006, between the Registrant and Donald J. Birak.

  31.1 Certification of the CEO

  31.2 Certification of the CFO

  32.1 Certification of the CEO (18 U.S.C. Section 1350)

  32.2 Certification of the CFO (18 U.S.C. Section 1350)

59


SIGNATURES

        Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

COEUR D’ALENE MINES CORPORATION
(Registrant)

Dated August 6, 2007 /s/ Dennis E. Wheeler
DENNIS E. WHEELER
Chairman, President and
Chief Executive Officer


Dated August 6, 2007
/s/ James A. Sabala
JAMES A SABALA
Executive Vice President and
Chief Financial Officer








60